Legislature(2021 - 2022)BARNES 124
03/20/2021 12:30 PM House TRANSPORTATION
Note: the audio
and video
recordings are distinct records and are obtained from different sources. As such there may be key differences between the two. The audio recordings are captured by our records offices as the official record of the meeting and will have more accurate timestamps. Use the icons to switch between them.
| Audio | Topic |
|---|---|
| Start | |
| HJR13 | |
| Presentation: Alaska Marine Highway System | |
| Adjourn |
* first hearing in first committee of referral
+ teleconferenced
= bill was previously heard/scheduled
+ teleconferenced
= bill was previously heard/scheduled
| *+ | HJR 13 | TELECONFERENCED | |
| + | TELECONFERENCED |
ALASKA STATE LEGISLATURE
HOUSE TRANSPORTATION STANDING COMMITTEE
March 20, 2021
12:33 p.m.
MEMBERS PRESENT
Representative Grier Hopkins, Chair
Representative Sara Hannan, Vice Chair
Representative Ivy Spohnholz
Representative Harriet Drummond
Representative Kevin McCabe
Representative Mike Cronk
MEMBERS ABSENT
Representative Tom McKay
COMMITTEE CALENDAR
HOUSE JOINT RESOLUTION NO. 13
Urging the United States Congress to exempt cruise ships from
certain provisions of the Passenger Vessel Services Act and
other applicable provisions of federal law for the period during
which Canadian ports are closed to cruise ships carrying more
than 100 people; and urging the President of the United States
not to fine or take actions against cruise ships sailing to the
state.
- HEARD & HELD
PRESENTATION: ALASKA MARINE HIGHWAY SYSTEM
- HEARD
PREVIOUS COMMITTEE ACTION
BILL: HJR 13
SHORT TITLE: URGE EXEMPTION FOR CRUISE SHIPS
SPONSOR(s): REPRESENTATIVE(s) ORTIZ
03/01/21 (H) READ THE FIRST TIME - REFERRALS
03/01/21 (H) TRA
03/20/21 (H) TRA AT 12:30 AM BARNES 124
WITNESS REGISTER
REPRESENTATIVE DAN ORTIZ
Legislator
Alaska State Legislature
Juneau, Alaska
POSITION STATEMENT: Introduced HJR 13 as prime sponsor.
PATTI MACKEY
President and CEO
Ketchikan Visitors Borough
Ketchikan, Alaska
POSITION STATEMENT: Provided testimony during the meeting.
KATI CAPOZZI
President and CEO
Alaska Chamber of Commerce
Anchorage, Alaska
POSITION STATEMENT: Provided testimony during the meeting.
SHANNON ADAMSON
Masters, Mates, and Pilots Union
Juneau, Alaska
POSITION STATEMENT: Provided testimony during the meeting.
ROB CARPENTER
Deputy Commissioner
Department of Transportation & Public Facilities
Juneau, Alaska
POSITION STATEMENT: Presented a PowerPoint and answered
questions during the meeting.
MATT MCLAREN
Business Manager
Alaska Marine Highway System
Juneau, Alaska
POSITION STATEMENT: Presented a PowerPoint and answered
questions during the meeting.
CAPTAIN JOHN FALVEY
General Manager
Alaska Marine Highway System
Juneau, Alaska
POSITION STATEMENT: Answered questions during the meeting.
ACTION NARRATIVE
12:33:54 PM
CHAIR GRIER HOPKINS called the House Transportation Standing
Committee meeting to order at 12:33 p.m.
HJR 13-URGE EXEMPTION FOR CRUISE SHIPS
12:35:08 PM
CHAIR HOPKINS announced that the first order of business would
be HOUSE JOINT RESOLUTION NO. 13, "Urging the United States
Congress to exempt cruise ships from certain provisions of the
Passenger Vessel Services Act and other applicable provisions of
federal law for the period during which Canadian ports are
closed to cruise ships carrying more than 100 people; and urging
the President of the United States not to fine or take actions
against cruise ships sailing to the state."
12:36:11 PM
REPRESENTATIVE DAN ORTIZ shared on February 4, 2021 Canada's
transport ministry announced it would prohibit large passenger
vessels from transiting their waters until 2022. Under the
Passenger Vessel Services Act (PVSA), large foreign vessels are
required to stop in a large foreign port such as Canada at least
once during their voyage. The announcement from Canada coupled
with the PVSA requirement would prevent Alaska from receiving
cruise ships throughout the entire 2021 season. This follows
the 2020 season in which Alaska also saw no large cruise ship
activity, he pointed out. The Alaska Visitors Industry,
particularly cruise tourism, is the cornerstone of Southeast
Alaska's economy, he stated. Prior to the pandemic, in 2019,
Alaska had more than 2.2m visitors, over half of whom arrived
via cruise ship. While many businesses were able to "hibernate"
for 2020, the threat of such limited visitors in 2021 could do
irreparable harm, he stated. The Congressional delegation has
been hard at work to try to find a way to save the 2021 cruise
ship season, he shared. He added Representative Don Young has
brought forth the Alaska Tourism Recovery Act, which proposes a
temporary workaround which would make round-trip voyages between
Alaska and Washington a foreign voyage under US law. If passed,
Representative Ortiz continued, HJR 13 would signal the support
of the Alaska State Legislature and would urge Congress and
President Joe Biden to take necessary actions to allow for
cruise ships to visit Alaska ports.
12:39:17 PM
REPRESENTATIVE MCCABE asked if HJR 13 had an end date.
REPRESENTATIVE ORTIZ replied yes, and it coincided with the
duration of Canada's cruise prohibition.
REPRESENTATIVE MCCABE asked if there would be opportunity to
extend should Canada become less cooperative with their date.
REPRESENTATIVE ORTIZ replied he was not sure if it allowed for
flexibility; in the event of continued prohibition there may
need to be another resolution.
REPRESENTATIVE MCCABE said he supports HJR 13 in general, but is
skeptical of allowing foreign vessels, which have less strict
rules, point-to-point in the US. He expressed his hopes HJR 13
wouldn't undo 100 years of maritime law.
12:41:43 PM
REPRESENTATIVE HANNAN expressed appreciation for Representative
McCabe's point and said it would not be the intent of HJR 13 to
undo any work done by the Passenger Vessel Services Act or the
Jones Act, which would have a ripple effect across the entire US
economy. It was a resolution and therefore a more temporary
solution, she pointed out. She mentioned it should be made
clear HJR 13 was not to be extended in perpetuity and
acknowledged US standards of health care on board the cruise
ship vessels to make sure they are meeting health and safety
standards.
REPRESENTATIVE ORTIZ answered as a resolution, HJR 13 had no
authority to undo anything, and its extension would be a
Congressional decision.
12:44:44 PM
REPRESENTATIVE CRONK expressed support for HJR 13 especially for
Interior Alaska.
CHAIR HOPKINS agreed.
12:45:39 PM
PATTI MACKEY, shared Alaska has withstood more negative effects
from COVID-19 than any other state in the US. Focusing on
Ketchikan, Alaska, Ms. Mackey shared tourism brought in about
$263m annually, and 96% of visitors came to Alaska via cruise
ship. The loss of passenger and crew member spending, along
with port fees and ancillary services purchased by the various
cruise lines, took a devastating toll on the community in 2020
and created a huge loss in municipal revenues. Tourism jobs in
Ketchikan numbered around 1350, she shared, with another 400
indirectly, resulting in about $76m in labor income; and while
the aid has been helpful in some instances, businesses wanted to
get back to doing what they did best, she imparted. A temporary
waiver or other workaround to resolve the restrictions on
foreign-flagged ships is more than a cruise industry issue, she
said, and is not the only answer to the challenges, but would
have a direct [positive] impact on Alaskan families, she said.
12:47:56 PM
CHAIR HOPKINS opened public testimony on HJR 13.
12:48:12 PM
KATI CAPOZZI, President and CEO, Alaska Chamber of Commerce,
testified in support of HJR 13. She shared the Chamber of
Commerce was founded in 1953 and its mission is to advocate for
a healthy business environment in Alaska. She shared the
tourism industry needed immediate Congressional action to allow
cruise ships to return to Alaska.
12:49:55 PM
SHANNON ADAMSON, Masters, Mates, and Pilots Union, put forth the
state of Alaska owned vessels that met all Jones Act and PVSA
requirements: the AMHS vessels currently tied up in Ketchikan
could boost tourism and help communities. Putting the Colombia
into service, she gave as an example, which could spend half
days in Skagway, Ketchikan, and Juneau, just to name a few,
could be offered as the way to see Juneau by way of one's own
vehicle, she added. Mitigation measures were already in place
on AMHS vessels, and it would be a way to boost tourism without
affecting AMHS or DOT&PF budgets, she pointed out.
12:52:05 PM
CHAIR HOPKINS closed public testimony on HJR 13.
^PRESENTATION: Alaska Marine Highway System
PRESENTATION: Alaska Marine Highway System
12:52:36 PM
CHAIR HOPKINS announced that the final order of business would
be to finish the presentation begun 3/18/21 on the Alaska Marine
Highway System.
12:53:01 PM
The committee took an at-ease from 12:53 p.m. to 12:56 p.m.
12:57:11 PM
ROB CARPENTER, Deputy Commissioner, Department of Transportation
& Public Facilities, continued a discussion on the AMHS
Reshaping Work Group (RWG) recommendations. In terms of
improving reliability, the endeavor at Cascade Point (CP), 30
miles north of the end of the road in Juneau, would shorten the
trip from Juneau to Haines. The DOT&PF was working with
procurement and legal counsel to ensure proper process for
proceeding with Goldbelt, the landowner. In terms of increasing
revenue, Dynamic Pricing was implemented in October 2019.
1:00:32 PM
REPRESENTATIVE ORTIZ commented constituents were not happy with
dynamic pricing, as the AMHS is not necessarily the same as an
airline. The function of the AMHS and its purposes was too
different than an airline to be able to make the comparison, he
said.
MR. CARPENTER said he disagreed as there has been considerable
pressure to increase revenue and the AMHS was trying to be more
self-supportive.
REPRESENTATIVE ORTIZ maintained that from constituents'
perspective, the impact of dynamic pricing on the runs from
Bellingham to anywhere in Southeast Alaska when vehicles were
included was such that passengers could no longer afford to pay.
Similar taxes were not applied on highways during busy times, he
added: the AMHS is a public transit system, and its
affordability must be kept within reach, he stated.
1:03:51 PM
REPRESENTATIVE HANNAN asked about dynamic pricing's two
different methodologies: in the first instance, she related,
the closer to the sailing date the price went up, and in the
second instance the higher the occupancy price the price went
up. She asked why discounts couldn't be applied instead of only
increases. She pointed out that people using the AMHS for their
military move may fill it up and it leaves those waiting to book
their ticket at a big disadvantage and asked if numbers had been
run to fill vessels by way of selling discounted tickets.
MR. CARPENTER said he personally agreed and had brought it to
coworkers' attention. He said it was not "exactly easy" to
implement, but it was being considered.
REPRESENTATIVE HANNAN asked that this issue be raised with Matt
McLaren.
1:07:42 PM
MATT MCLAREN, Business Manager, Alaska Marine Highway System,
replied at the time of dynamic pricing's implementation the
possibility of discounting had not been analyzed. The AMHS had
been assisted by the McDowell group's tariff study, he said, and
full capabilities of the reservation system were not available
at that time. That system was being improved and could be
looked at presently, he stated.
1:08:38 PM
REPRESENTATIVE MCCABE said the AMHS could no longer be compared
to highways, as the more driving the more was paid in gas and
taxes. He said the comparison was impeding fixing AMHS
problems.
1:10:25 PM
REPRESENTATIVE SPOHNHOLZ commented the same amount of motor fuel
tax was paid no matter how many people were traveling, so it was
a user fee, but surcharges such as toll roads were charged
during peak hours. There is a way of doing it which takes into
consideration capacity of the road and cost recovery, she
stated.
1:11:24 PM
REPRESENTATIVE ORTIZ clarified he was speaking about public
transit systems, of which the AMHS fit since highways were also
for public use. Airlines were private, for-profit enterprises,
he pointed out.
1:12:06 PM
MR. CARPENTER imparted there was a new dedicated planner
position now included in the AMHS RWG. There would also be a
federally funded new organizational "change management" expert
position added, he stated. The person would act as liaison
between the AMHS and the new board, he said. In terms of cost
reduction, union contracts for MM&P and MEBA were in
negotiations, and the IBU contract expired on June 30, 2022, he
said. Lastly, the fast ferries' divestment would add to
savings, he mentioned.
1:14:23 PM
REPRESENTATIVE MCCABE stated fast vehicle ferries were purchased
for $68m and sold for $5.6m, so their "divestment" was a $63m
loss. The Malaspina is parked at a price of $416K/year, he
stated, and asked at what point the AMHS would cut losses.
MR. CARPENTER said the correct path for the Malaspina's
disposal/divestiture/scuttling was still being determined.
REPRESENTATIVE MCCABE asked for a timeframe.
MR. CARPENTER replied an investment to remove hazardous
materials would need to be made in the event of scuttling.
CHAIR HOPKINS expressed agreement with Representative McCabe's
questioning of a more specific plan.
1:18:01 PM
REPRESENTATIVE CRONK asked what kind of interest there was in
the Malaspina.
1:18:29 PM
CAPTAIN JOHN FALVEY, General Manager, Alaska Marine Highway
System, said someone in the Midwest wanted to use it for housing
for the homeless, but that scuttling was also being closely
looked at.
REPRESENTATIVE CRONK said it was a waste of money, especially
when looked at in terms of the payment of Personal Fund
Dividends.
1:20:09 PM
REPRESENTATIVE HANNAN asked what the timeframe was for either of
the two divestment mechanisms, selling or scuttling.
CAPT. FALVEY said the AMHS was actively working with the
Environmental Protection Agency (EPA), and that he did not have
a timeline for the process.
REPRESENTATIVE HANNAN expressed her desire to move from
"actively looking" to "give me a timeline," and again asked for
a window of time.
CAPT. FALVEY replied no more than one year.
1:22:45 PM
REPRESENTATIVE MCCABE asked what it would cost to clean out the
vessel.
CAPT. FALVEY replied around $500K.
1:23:48 PM
CHAIR HOPKINS asked when discussions with EPA regarding
scuttling began.
CAPT. FALVEY replied three or four months ago.
CHAIR HOPKINS clarified so that should be three or four more
months.
CAPT. FALVEY replied maybe sooner.
CHAIR HOPKINS said good, maybe by January 2022.
1:25:13 PM
MR. CARPENTER shared slide 9 on the AMHS's work with the Alaska
State Legislature. In terms of strengthening governance, the
RWG strongly recommended a reshaping of the Marine
Transportation Advisory Board (MTAB), he stated, so that was
being done via House Bill 134, which would give the board more
"teeth," and likewise a more business- and operations-focus.
House Bill 134 would also add marine business/vessel experience.
In terms of stabilizing planning, the AMHS was "conceptually
supportive" of forward funding, albeit difficult in this fiscal
environment, he put forth.
1:26:55 PM
CHAIR HOPKINS said the House Transportation Standing Committee
passed HB 63 in the past week, and hopefully that would mesh
with the current priorities.
MR. CARPENTER shared work with the RWG, which, as the committee
knew from HB 63 had as a goal short- and long-range operations
planning, improving reliability, and reducing costs, fleet
size/design and replacement strategy, and cost reduction, which
could entail "anything from" alternative solutions/service
providers to additional leveraging of road infrastructure.
There was a longer-term evaluation that still needed to take
place for the AMHS, he put forth.
1:28:49 PM
REPRESENTATIVE MCCABE asked about service providers.
MR. CARPENTER replied there could be a contracting service if
the AMHS "gave up," or if there were a different solution than
using ferries.
REPRESENTATIVE MCCABE said the AMHS already had contracts with
Allen Marine and Goldbelt to provide some day ferry service and
asked why a better way to subcontract day use ferries hadn't
been sought before this point.
MR. CARPENTER replied union contracts prohibited contracting for
certain routes; he said he believed there were just six. He
expressed the new board may be able to better determine what was
viable.
REPRESENTATIVE MCCABE expressed his desire for better frequency
and more tailored, quicker service to some of the smaller ports.
CHAIR HOPKINS asked which ports were contractable.
MR. MCLAREN replied Hoonah, Pelican, Tenakee, Kake, Angoon, and
one more.
1:33:26 PM
REPRESENTATIVE DRUMMOND said it was her understanding there was
a contract in place between Allen Marine and Goldbelt to begin
to provide service with smaller vessels to smaller ports, but
that only one run was made before COVID-19. She then asked if
there was possibility of continuing similar contracting this
season.
MR. CARPENTER replied if not in summer 2021, it was still on
AMHS radar.
REPRESENTATIVE DRUMMOND replied this summer would be the time to
do it, as Allen Marine was ready to serve when passengers
returned en masse. She added it would still be a temporary fix,
and she would really like to see service provided to the small
communities which were able to be served without violating union
contracts.
1:36:01 PM
REPRESENTATIVE HANNAN stated only Tenakee and Pelican, which
were both on their way to other places, didn't have vehicle
service.
MR. MCLAREN confirmed the only port that AMHS didn't carry
vehicles to was Tenakee, but other ports were visited on that
run.
1:38:26 PM
MR. CARPENTER put forth a "sample" plan forward, which the RWG
had entitled "notional budget goals" and which entailed lowering
the UGF budget by $18m - $22m over three to four years, fleet
streamlining and/or modernization which would include TRV, crew
quarters, and the gradual retiring of high-cost legacy ships.
As far as the long-term, there was potential for another
mainliner replacement vessel, he stated.
1:40:42 PM
REPRESENTATIVE ORTIZ asked how much UGF funding had been lowered
for the AMHS from 2013-2014 until 2021.
MR. MCLAREN replied the biggest year for UGF was $112m, and
currently it's around $50m, so about a $62m, or 65%, reduction.
REPRESENTATIVE ORTIZ clarified the $18m - $22m reduction was on
top of the just-stated 65% reduction.
MR. MCLAREN replied yes.
REPRESENTATIVE ORTIZ asked for an explanation of how the
reduction supported the stated underlying themes of "value and
importance of AMHS to coastal communities and the state as a
whole" from the RWG's report, and how coastal communities' best
interest was being kept in mind.
MR. CARPENTER reemphasized what was put forth was just a sample
plan and was not being put forth as what should happen. He
urged the committee to allow a walkthrough of the sample plan
and stated the budget could still be adjusted.
1:44:39 PM
MR. MCLAREN shared slide 12, a chart listing each of the nine
vessels in the fleet along with the year built, operating cost
per week, and size of crew: Columbia, built 1973, operating
cost per week $476K, 63 crew members; Kennicott, 1998, $420K,
53; Matanuska, 1963, $343K, 49; Tustumena, 1969, $259K, 38;
Aurora, 1977, $182K, 24; LeConte, 1974, $161K, 24; Tazlina,
2019, $133K, 21; Hubbard, 2019, $133K, 21; Lituya, 2004, $21K,
5. He also pointed out the estimated weekly operating costs per
week and crew size of the Mainliner Replacement Vessel ($270K;
46), TRV ($245K; 35), Tazlina with crew quarters ($146K; 24),
and Hubbard with crew quarters ($146K; 24).
1:48:06 PM
REPRESENTATIVE ORTIZ asked if, with crew quarters being added to
the Tazlina and the Hubbard, operating costs currently at $133K
per week would go up, and if the costs included housing for
crew.
MR. MCLAREN replied yes; the cost savings came in because Aurora
and LeConte could potentially be replaced, and the addition of
crew quarters would save money.
1:49:44 PM
CHAIR HOPKINS asked how DOT&PF was looking at utilizing rescue
package funds and CARES Act funds to make capital improvements.
MR. CARPENTER clarified Federal Transport Authority money did
not have a capital aspect to it for operational costs; Federal
highway funds did; and there had been no proposal yet on intent
of money. In the long-term plan, investment decisions would be
addressed, he put forth.
CHAIR HOPKINS said so with passage of HB 63.
1:51:40 PM
REPRESENTATIVE SPOHNHOLZ asked if any renewable energy
technology could be utilized to cut down on fuel costs and help
reduce the carbon footprint, especially with the Biden
administration making transportation a priority.
CAPT. FALVEY replied green operations were becoming more
prevalent, and electric batteries were under consideration for
shorter runs, but equipment would need to be refit to the point
of almost needing a new ship except for the Lituya. Dual-fuel
engines such as L&G were under consideration as well depending
on the supply chain into Alaska, he put forth.
REPRESENTATIVE SPOHNHOLZ asked for more information about
Washington state electrifying ferries.
CAPT. FALVEY replied they were for short runs and were much more
amenable to charging.
1:56:01 PM
REPRESENTATIVE ORTIZ asked if the technology was not even there
in terms of using batteries to power larger vessels.
CAPT. FALVEY replied yes, when they needed to be recharged for
longer routes the technology was not there yet.
1:56:55 PM
REPRESENTATIVE MCCABE asked if they were diesel-electric or if
it were solely diesel.
CAPT. FALVEY replied specifics would depend on if the TRV was
SOLAS or non-SOLAS, diesel-electric may be required.
1:57:35 PM
MR. MCLAREN clarified the chart looked specifically at operating
costs. But the big difference in whether the Tazlina and
Hubbard were able to operate or not was also the capacity size,
as these were much bigger in terms of passengers (290 passengers
for the Tazlina, whereas the Aurora holds 250, e.g.) and cars.
With the bigger vessels there was more opportunity to generate
revenue as well as save costs.
MR. MCLAREN shared on slide 13 a hypothetical timeline for AMHS
vessel replacement. The TRV design & build process was still
about six months out, he stated, with the construction about
four years out from that point. An amount of $275m was set
aside for the project, depending on if it was SOLAS or non-
SOLAS, he imparted. The Alaska Class Ferry crew quarter design
& bid process was at 90% to 95% completion, and if done with
federal money, a shipyard in which to build the crew quarters
would need to be located. As the Tazlina and Hubbard were
completed, the LeConte and Aurora could potentially be retired,
he stated. The Colombia pitch propellor project was in the
works, which would enable the Matanuska to retire, he shared.
The Colombia was the most expensive ship to operate, he shared.
A mainliner replacement could be looked at for that run, like
the TRV to save design costs, also a four-year timeline, rough
estimate $300m, maybe less, he shared.
2:02:26 PM
REPRESENTATIVE HANNAN asked for real time estimates, and from
where the authority came.
MR. CARPENTER said everything was still being evaluated, and it
was up to Governor Dunleavy.
REPRESENTATIVE HANNAN said CP would only be seasonally
available, so we were two years out from having it as a point,
and the vessels aren't running.
MR. CARPENTER said CP was out two years at best with 2021
construction season being out.
2:06:08 PM
REPRESENTATIVE ORTIZ asked when the timeline on the TRV would
start.
MR. CARPENTER replied construction could start as early as fall
2021, and then there was a 15-month buildout.
REPRESENTATIVE ORTIZ clarified "if [they] had the 'go'" was the
appropriation.
MR. CARPENTER replied no, and anyway the governor had the final
answer.
REPRESENTATIVE ORTIZ again looked to clarify if the timeline put
forth by the DOT&PF was from today's date or another point.
MR. CARPENTER replied it was a hypothetical timeline.
MR. MCLAREN said even if everything were "green lit today" it
would still be a bit of a process. Approval process for federal
funds must be undergone, a shipyard must be found, and it must
be determined to do projects concurrently or one at a time. He
added six to nine months may be a safe estimate for Alaska Class
Ferries.
2:11:38 PM
REPRESENTATIVE SPOHNHOLZ asked about using the same design for
the mainliner replacement vessel as the TRV, and how much design
cost.
MR. MCLAREN replied for mainliners, from scratch, the estimate
was about $10m for design, plus "all the detailed design after
that."
REPRESENTATIVE SPOHNHOLZ imparted technology was changing fast,
and design may be 65-80% cheaper in the next decade, so waiting
two years and saving money in fuel output may be a prudent long-
term savings goal.
MR. MCLAREN replied there were many advantages of building a
ship that is more cost-efficient to run, and design costs may be
made up in operating and even construction savings.
2:14:32 PM
REPRESENTATIVE DRUMMOND asked if there was a road in CP two
years, if a terminal would be involved, and what was the cost.
MR. CARPENTER replied the road already existed at the end of
Echo Cove and there was an extension in place owned by Goldbelt
where a terminal "of some sort" would be built for the AMHS.
REPRESENTATIVE DRUMMOND asked what the completed road and
terminal, that would allow the Tazlina and Hubbard to run
without crew quarters, would be.
MR. CARPENTER replied $20m depending what was agreed upon with
Goldbelt.
REPRESENTATIVE DRUMMOND clarified that was different than the
original road design which went our significantly further north,
and if so, if that project had been abandoned.
MR. CARPENTER replied yes, the Juneau Access Project from Echo
Cove almost to Skagway, was different, and yes, that project was
shelved for now.
REPRESENTATIVE DRUMMOND asked if the Hubbard had run any routes,
and if would it be out of commission during crew quarter
rebuild.
MR. CARPENTER replied both the Hubbard and Tazlina have not
sailed, may be able to provide backup service contingent on
Certificate(s) of Inspection (COI).
REPRESENTATIVE DRUMMOND confirmed the vessels during crew
quarter rebuild would be out of commission.
MR. CARPENTER replied yes, out of commission.
2:18:43 PM
REPRESENTATIVE MCCABE asked if CP were completed for $20m, crew
quarters need not be put into Tazlina and Hubbard nor the
vessels taken out of service. Taking the vessels out of service
would be a loss of 16 months of revenue, he pointed out.
MR. CARPENTER replied CP and crew quarters were not mutually
exclusive options; CP was needed to leverage the road system, he
stated. Alaska Class Ferries could run out of Auke Bay or CP to
other ports, he added.
REPRESENTATIVE MCCABE asked if it would be better to do crew
quarters on one boat for CP and leave the other as it was as the
day boat and have a backup with crew quarters.
2:21:33 PM
The committee took an at-ease from 2:21 p.m. to 2:22 p.m.
2:22:28 PM
REPRESENTATIVE ORTIZ asked if the use of CP had seasonal
limitations.
MR. CARPENTER replied unless there were a sizable, and thus
costly, breakwater, then yes.
2:23:31 PM
REPRESENTATIVE SPOHNHOLZ asked if road maintenance had been
factored into the $20m capital cost.
MR. CARPENTER replied $20m was a rough estimate for terminal
buildout; there was still a lot being negotiated. The
improvements that needed to be made were not on Goldbelt's
property, he added.
REPRESENTATIVE SPOHNHOLZ clarified access to the property would
need to be given by Goldbelt.
MR. CARPENTER replied yes, Goldbelt would provide access to the
terminal.
REPRESENTATIVE SPOHNHOLZ asked if it would be a new dock,
separate from the Kensington Mine access dock.
MR. CARPENTER replied yes it was new; that it would need to be
much bigger for AMHS ships.
REPRESENTATIVE SPOHNHOLZ asked if Goldbelt would receive payment
for use of the road.
MR. CARPENTER replied a lot of details needed to be worked out;
it may be leased, but the idea is there is a staging area for
folks who had bought tickets in Auke Bay.
2:26:13 PM
MR. MCLAREN shared a list of each ship in the current fleet and
year built. He shared "legacy vessels" that were headed toward
retirement: MV Malaspina proposed sale as soon as possible,
MV LeConte proposed sale 2022, MV Aurora proposed sale 2022,
MV Matanuska proposed sale 2023, MV Tustumena proposed sale
2025, and MV Columbia - proposed sale 2028. He shared
projections for a 2029 fleet if things ran smoothly: TRV,
estimated 2025, mainliner replacement vessel estimated 2028,
Kennicott, Lituya, Hubbard and Tazlina.
2:28:55 PM
REPRESENTATIVE ORTIZ asked if it was correct that having a more
flexible and usable fleet also spoke to the benefit of adding
crew quarters to the Tazlina and Hubbard.
MR. MCLAREN replied that was correct.
REPRESENTATIVE ORTIZ asked for a quick summary of what it meant
to make a vessel SOLAS and what it meant in terms of
flexibility.
MR. MCLAREN replied for the TRV $275m was estimated for the
current size SOLAS (Safety of Life at Sea), $235m non-SOLAS. It
was an International standard for ship evacuation, needed for
Prince Rupert Sound.
REPRESENTATIVE ORTIZ asked if there were added costs for
upkeep/maintenance costs regarding SOLAS or non-SOLAS.
MR. MCLAREN replied yes, SOLAS vessels ran about $300K more than
normal COI requirements.
2:32:17 PM
REPRESENTATIVE MCCABE clarified Tazlina, and Hubbard retrofitted
for crew quarters could only operate in Southeast, not cross-
Gulf.
MR. MCLAREN replied they would also be able to go in Prince
William Sound (PWS) but not in the open ocean; only TRV and
Kennicott.
2:33:13 PM
REPRESENTATIVE HANNAN asked if Yakutat-PWS would need SOLAS.
MR. MCLAREN replied it would depend on the design of the hull
and whether that could handle the open ocean.
REPRESENTATIVE HANNAN asked whether the TRV would be Gulf-
capable.
MR. MCLAREN replied yes.
2:34:32 PM
REPRESENTATIVE DRUMMOND asked what mainliner replacements were
capable of and whether it was cross-Gulf capable, and which of
the fleet were mainliners.
MR. MCLAREN replied the mainliner replacement vessel could still
be designed as to what was needed, and it was not needed to be
cross-Gulf but could be made SOLAS if need be. It would be made
to replace the Colombia or the Matanuska, he added.
2:35:43 PM
REPRESENTATIVE MCCABE clarified cross Gulf also included Dutch
Harbor.
MR. MCLAREN replied cross-Gulf referred to the Juneau-Yakutat-
Whittier run; Homer-Kodiak and out the chain was not considered
cross-Gulf, he stated, but was just called the Southwest Chain
Run.
2:36:33 PM
MR. CARPENTER showed slide 15 on revenue generated for the AMHS;
state funding received; and the fare box recovery rate,
projected to 2029. He said the graph notional budget goals and
a budget reduction, showed in FY 22, $100m-plus budget with $50m
revenue, $50m state funding, "45%-ish" fare box recovery; intent
would be, with the modernized fleet, in theory the budget could
drop.
2:38:29 PM
REPRESENTATIVE MCCABE asked if Allen Marine and Goldbelt had
been put into the mix to see what the recovery would be, or if
the chart was only for AMHS ferries.
MR. CARPENTER replied the chart was just AMHS and fare box
recovery, but the new board would attempt to improve the AMHS
yet again.
2:39:39 PM
REPRESENTATIVE HANNAN asked about the fare box recovery rate
from the Ketchikan-Hollis route and how much had been made with
that route excluded.
MR. MCLAREN said he would follow up with numbers.
2:42:29 PM
MR. MCLAREN went over slide 16 on vessel capital costs, showing
the current fleet costs over the past ten years and the
projected costs for the next ten years. The annual overhaul
cost to keep vessels in operation was $16.6m, he shared. Over
the last 10 years $400m has been spent, he shared. Projected
capital to be spent to keep current fleet operational was
$770.9m.
2:45:19 PM
REPRESENTATIVE HANNAN asked about the difference between the
cost of capital expenses between Tazlina and Hubbard because the
same side-door improvements had been done on both.
MR. MCLAREN replied neither included the side doors; both were
included in the projected capital spent.
2:47:23 PM
CHAIR HOPKINS asked if the projected capital would drop from
$110m to a more nominal expenditure once the Tustumena became
the TRV.
MR. MCLAREN replied yes.
2:47:52 PM
REPRESENTATIVE ORTIZ asked what accounted for $215K and Hubbard
$59K.
MR. MCLAREN replied the COI had not yet been done on the
Hubbard.
2:48:32 PM
MR. CARPENTER showed, on a total net present value basis,
cumulative costs of continuing with the current fleet investment
on both the current fleet, represented by the red line on the
graph, and the sample plan, represented by the green line on the
graph. Cash flow in the sample plan, while higher in the
earlier years, over a certain period would drop significantly
once the investment had been made.
CHAIR HOPKINS asked if the cost of keeping ships docked had been
included.
MR. MCLAREN replied a little bit was built in, but it was not in
the plan for them to be stored for years and incur great costs.
2:51:18 PM
REPRESENTATIVE MCCABE asked if any Federal CARES Act money was
going toward the AMHS.
MR. CARPENTER replied he had heard there was a certain amount,
but that it wasn't expected to make a big impact.
2:53:43 PM
ADJOURNMENT
There being no further business before the committee, the House
Transportation Standing Committee meeting was adjourned at 2:53
p.m.
| Document Name | Date/Time | Subjects |
|---|---|---|
| HJR 13 - Letter of Support Southeast Conference 3.20.2021.pdf |
HTRA 3/20/2021 12:30:00 PM |
HJR 13 |
| HJR 13 Sponsor Statement 03.20.2021.pdf |
HTRA 3/20/2021 12:30:00 PM |
HJR 13 |
| HJR 13 - Letter of Support Alaska Policy Forum 3.20.2021.pdf |
HTRA 3/20/2021 12:30:00 PM |
HJR 13 |
| HJR 13 - Letter of Support Southeast Conference 3.20.2021.pdf |
HTRA 3/20/2021 12:30:00 PM |
HJR 13 |
| HJR 13 Letter of Support Kodiak Chamber 3.20.2021.pdf |
HTRA 3/20/2021 12:30:00 PM |
HJR 13 |
| HJR 13 Letter of Support ATIA 3.20.2021.pdf |
HTRA 3/20/2021 12:30:00 PM |
HJR 13 |
| HJR13 AML Letter of Support 3.20.2021.pdf |
HTRA 3/20/2021 12:30:00 PM |
HJR 13 |
| 2021-03-24 - DOTPF Follow Up from 3-20-2021 meeting re AMHS.pdf |
HTRA 3/20/2021 12:30:00 PM |
AMHS Presentation Q&A Response |