txt

CSHB 89(RES): "An Act relating to the disposal of certain bedload material in conjunction with a flood mitigation plan."

00 CS FOR HOUSE BILL NO. 89(RES) 01 "An Act relating to the disposal of certain bedload material in conjunction with a flood 02 mitigation plan." 03 BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF ALASKA: 04 * Section 1. AS 38.05.872 is amended by adding new subsections to read: 05 (b) The commissioner may offer for disposal bedload material from an area 06 subject to a site-specific flood mitigation plan approved by the commissioner under 07 the terms in (d) of this section after making a finding that 08 (1) removal of the bedload gravel will offset future costs to the state 09 that are attributable to flood damage; 10 (2) the sale of the bedload gravel under (b) - (e) of this section at a cost 11 that may be below fair market value is in the best interests of the state; and 12 (3) removal of the bedload gravel will enhance the effectiveness of the 13 flood mitigation plan in preventing a flood or minimizing flood damage. 14 (c) The commissioner may request a professional engineer with relevant

01 experience to review the plans for bedload material extraction. 02 (d) A person, other than the state or federal government or a political 03 subdivision of the state, acquiring bedload material under a disposal authorized by the 04 commissioner under this section shall comply with the terms and conditions 05 established by the commissioner and pay to the department a royalty of not less than 06 12.5 percent of pretax profit calculated by subtracting from the value of the bedload 07 material the actual direct costs of extricating, loading, and transporting the material to 08 market, if applicable. The commissioner may adopt regulations that identify the 09 method and means for determining the value of the bedload material and the costs that 10 may be deducted for the purpose of calculating the amount to be paid to the state. In 11 this subsection, "value" means the sales price of the material in a bona fide arm's- 12 length transaction between unaffiliated parties or the sales price of the material had the 13 material been sold in a bona fide arm's-length transaction between unaffiliated parties. 14 (e) In this section, "bedload material" means gravel, rock, and other material 15 located below the plane of the ordinary high water mark or the mean high water mark 16 of a river, lake, stream, or other coastal water. 17 * Sec. 2. The uncodified law of the State of Alaska is amended by adding a new section to 18 read: 19 REVISOR'S INSTRUCTION. The revisor of statutes shall change the catch line of 20 AS 38.05.872 from "Disposition of state land for flood control projects" to "Disposition of 21 state land and material for flood mitigation."