00 CS FOR SENATE BILL NO. 46(FIN) 01 "An Act making capital appropriations; and providing for an effective date." 02 BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF ALASKA: 03 (SECTION 1 OF THIS ACT BEGINS ON PAGE 2) 01 * Section 1. The following appropriation items are for capital projects and grants from the 02 general fund or other funds as set out in section 2 of this Act by funding source to the 03 agencies named for the purposes expressed and lapse under AS 37.25.020, unless otherwise 04 noted. 05 Appropriation General Other 06 Allocations Items Funds Funds 07 * * * * * * * * * *  08 * * * * * Department of Environmental Conservation * * * * *  09 * * * * * * * * * *  10 Village Safe Water Project 2,261,800 565,500 1,696,300 11 Administration (HD 1-40) 12 Village Safe Water 755,000 189,100 565,900  13 Feasibility Studies  14 Angoon Hood Mountain 70,000 15 Hydrological Study (HD 5) 16 Deering Water Supply and 25,000 17 Sewer Discharge Study (HD 18 40) 19 Diomede Piped Water and 75,000 20 Sewer Study (HD 39) 21 Glennallen Water 75,000 22 Improvements Feasibility 23 Study (HD 12) 24 Iliamna Sanitation 100,000 25 Facilities Comprehensive 26 Plan (HD 36) 27 Kotzebue 2006 Utilities 25,000 28 Master Plan Update (HD 40) 29 Naukati Community Master 100,000 30 Plan Update (HD 5) 31 Nikolaevsk Sanitation 25,000 01 Facilities Master Plan 02 Update (HD 33-35) 03 Nunam Iqua Water and Sewer 25,000 04 Improvements Master Plan 05 Update (HD 39) 06 Tanana Soils Investigation 60,000 07 (HD 6) 08 Tazlina Sanitation 100,000 09 Facilities Master Plan (HD 10 6) 11 Unalakleet Foothills 75,000 12 Groundwater Investigation 13 (HD 39) 14 Village Safe Water Projects 78,922,700 19,782,200 59,140,500  15 Adak Water and Sewer 2,366,000 16 Improvements (HD 37) 17 Anderson Design Piped Sewer 318,000 18 System and Regional Septage 19 Facility (HD 7-11) 20 Angoon Water Source and 650,000 21 Treatment Improvements (HD 22 5) 23 Aniak Morgan Road Sewer 1,523,100 24 Construction (HD 6) 25 Atka Water and Sewer 2,200,000 26 Improvements Completion (HD 27 37) 28 Atmautluak Flush and Haul 2,174,000 29 System Completion (HD 38) 30 Bethel Piped Water and 9,075,000 31 Sewer Improvements (HD 38) 01 Brevig Mission Water and 1,077,600 02 Sewer Connections (HD 39) 03 Buckland Design Piped Water 254,100 04 and Sewer Improvements (HD 05 40) 06 Chenega Bay Design Water 168,000 07 and Sewer System 08 Improvements (HD 5) 09 Chistochina Design 240,700 10 Washeteria and Piped 11 Services to Core Community 12 (HD 6) 13 Chuathbaluk Design Piped 200,000 14 Sewer System (HD 6) 15 Circle Water and Sewer Haul 2,810,000 16 System (HD 6) 17 Cold Bay Water and Sewer 229,000 18 System Improvements (HD 37) 19 Crooked Creek Design Water 495,000 20 and Sewer Improvements (HD 21 6) 22 Deering Water Storage Tank 1,150,000 23 and Water Treatment Plant 24 Completion (HD 40) 25 Eek Design Piped Water and 600,000 26 Sewer (HD 38) 27 Elim Water and Sewer Main 2,156,400 28 Replacement (HD 39) 29 Emmonak Design Water and 230,000 30 Sewer Improvements (HD 39) 31 False Pass Design Piped 256,700 01 Sewer System (HD 37) 02 Fort Yukon Design Piped 275,000 03 Water and Sewer 04 Improvements (HD 6) 05 Golovin Water Source Design 2,230,000 06 and Construction and 07 Storage Tank Design (HD 39) 08 Grayling Water System 1,238,800 09 Improvements (HD 6) 10 Huslia Water Main 1,681,700 11 Replacement (HD 6) 12 Kasaan Water and Sewer 380,000 13 Block 9 (HD 5) 14 Kasigluk Design Water and 675,000 15 Sewer Systems (HD 38) 16 Kiana Sewer Lift Station 446,000 17 and Force Main Upgrades (HD 18 40) 19 Klukwan Water Treatment 1,750,000 20 Plant Replacement (HD 5) 21 Kongiganak Design Water and 225,000 22 Sewer Improvements (HD 38) 23 Kotlik Design Piped Water 166,900 24 and Sewer Extensions (HD 39) 25 Kotzebue Water and Sewer 9,075,000 26 Improvements Phase 1 (HD 40) 27 Kwethluk Piped Water and 1,048,000 28 Sewer System Completion (HD 29 38) 30 Larsen Bay Water System 1,935,000 31 Improvements (HD 36) 01 Manokotak Design Water and 283,000 02 Sewer Improvements (HD 37) 03 Marshall Design Water and 340,400 04 Sewer Replacement (HD 6) 05 Metlakatla Water System 2,629,800 06 Improvements and Walden 07 Road Sewer (HD 5) 08 Minto Water and Sewer 185,000 09 System Upgrades (HD 6) 10 Nanwalek Sewer Disposal 1,472,700 11 System Improvements (HD 12 33-35) 13 New Stuyahok Water Storage 940,000 14 Tank (HD 37) 15 Nightmute Design Sewer 55,500 16 Lagoon (HD 38) 17 Ninilchik Design Old 436,600 18 Village Townsite Piped 19 Water and Sewer (HD 33-35) 20 Nondalton Water Treatment 1,838,200 21 Plant and Storage Tank (HD 22 36) 23 Nunapitchuk Design Water 310,000 24 and Sewer System Upgrades 25 (HD 38) 26 Old Harbor Design Water 350,000 27 Treatment Plant and Storage 28 Tank (HD 36) 29 Ouzinkie Water Treatment 1,955,000 30 Plant and Septic Pumper (HD 31 36) 01 Pilot Point Design Piped 240,000 02 Water System Extension and 03 Sewer System Improvements 04 (HD 37) 05 Pitka's Point Design Piped 69,600 06 Sewer System (HD 39) 07 Platinum Water and Sewer 1,523,000 08 Improvements (HD 38) 09 Port Heiden Washeteria, 802,000 10 Water Treatment Plant and 11 Watering Point (HD 37) 12 Port Lions Water Treatment 1,978,000 13 Plant and Storage Tank (HD 14 36) 15 Quinhagak Design Piped 300,000 16 Water and Sewer 17 Improvements (HD 38) 18 Saint Michael Design 150,000 19 Completion of Piped Water 20 and Sewer System (HD 39) 21 Saint Paul South Old Town 465,800 22 Sewer Replacement (HD 37) 23 Saxman Water System 1,659,000 24 Upgrades (HD 1) 25 Scammon Bay Water Treatment 3,018,400 26 Plant and New Water and 27 Sewer Services (HD 39) 28 Seldovia Design Water and 385,800 29 Sewer Improvements (HD 30 33-35) 31 Shageluk Design Piped Water 387,900 01 and Sewer System Phase 1 02 (HD 6) 03 Shungnak Water and Sewer 1,024,000 04 Main Replacement (HD 40) 05 Stebbins Design Piped Water 200,000 06 and Sewer System (HD 39) 07 Takotna Water Treatment 269,000 08 Plant and Septic System 09 Upgrades (HD 6) 10 Tanacross Water and Sewer 2,669,500 11 System Expansion and 12 Improvements (HD 6) 13 Tanana Design Piped Water 597,000 14 and Sewer Extensions (HD 6) 15 Togiak Design Water 23,000 16 Treatment Plant 17 Improvements (HD 37) 18 Toksook Bay Design Water 200,000 19 Treatment Plant and Storage 20 Tank (HD 38) 21 Tyonek Water Distribution 1,947,500 22 System Replacement (HD 6) 23 Unalakleet Water and Sewer 592,000 24 Improvements Design and 25 Phase 1 Construction (HD 39) 26 Voznesenka Design Water and 100,000 27 Sewer Improvements Phase 1 28 (HD 33-35) 29 Wales Washeteria Water 225,000 30 Supply and Septic System 31 (HD 39) 01 * * * * * * * * * *  02 * * * * * Department of Transportation/Public Facilities * * * * *  03 * * * * * * * * * *  04 Statewide Federal Programs 56,500,000 56,500,000  05 Federal-Aid Aviation State 14,500,000 06 Match (HD 1-40) 07 Federal-Aid Highway State 42,000,000 08 Match (HD 1-40) 09 Airport Improvement Program 432,450,111 432,450,111  10 Alakanuk: Airport 7,010,000 11 Relocation (HD 39) 12 Alaska International 4,200,000 13 Airport System: Bond 14 Issuance Costs (HD 1-40) 15 Alaska International 19,400,000 16 Airport System: Bond Issue 17 Capitalized Interest (HD 18 1-40) 19 Alaska International 21,000,000 20 Airport System: Bond Issue 21 Reserve Funds (HD 1-40) 22 Alaska International 8,074,000 23 Airport System: Development 24 Fund (HD 17-32) 25 Alaska International 15,000,000 26 Airport System: Maintenance 27 and Operations Reserve Fund 28 (HD 17-32) 29 Allakaket: Airport 4,220,000 30 Improvements (HD 6) 31 Anchorage Area Sea Plane 100,000 01 Base Economic Options (HD 02 17-32) 03 Aniak: Snow Removal 1,100,000 04 Equipment Building (HD 6) 05 Anvik: Airport Improvements 1,000,000 06 (HD 6) 07 Bethel: Sand Storage 700,000 08 Building (HD 38) 09 Central Region: Snow 7,200,000 10 Removal Equipment (HD 1-40) 11 Central Region: Temporary 200,000 12 Snow Removal Equipment 13 Buildings (HD 1-40) 14 Chalkyitsik: Airport 5,382,500 15 Improvements (HD 6) 16 Chignik: Area Airport 400,000 17 Master Plan (HD 37) 18 Coffman Cove: Seaplane 250,000 19 Float Relocation (HD 1) 20 Cold Bay: Airport Rescue 685,000 21 and Firefighting Building 22 Expansion (HD 37) 23 Cordova: Airport Apron, 1,735,000 24 Taxiway, and General 25 Aviation Improvements (HD 5) 26 Cordova: Airport Electric 1,500,000 27 Line (HD 5) 28 Cordova: Airport Runway 8,000,000 29 Safety Area (HD 5) 30 Ekwok: Snow Removal 820,000 31 Equipment Building (HD 37) 01 Fairbanks International 21,500,000 02 Airport: Runway 1L-19R 03 Reconstruction (HD 7-11) 04 Fairbanks International 2,200,000 05 Airport: Terminal Area 06 Development (HD 7-11) 07 Fort Yukon: Airport 2,765,625 08 Resurfacing (HD 6) 09 Grayling: Airport 1,680,000 10 Reconstruction (HD 6) 11 Hollis and Clark Bay: 900,000 12 Seaplane Float Construction 13 (HD 1) 14 Homer: Airport Rescue and 4,175,000 15 Firefighting/Snow Removal 16 Equipment/Flight Service 17 Station Building 18 Replacement (HD 33-35) 19 Hoonah: Airport 1,900,000 20 Improvements (HD 5) 21 Ketchikan: Airport 500,000 22 Improvements (HD 1) 23 Ketchikan: Runway Overlay 10,000,000 24 and Runway Safety Area 25 Upgrade (HD 1) 26 Ketchikan: Snow Removal 2,875,000 27 Equipment/Sand/Urea 28 Building Construction (HD 1) 29 King Salmon: Airport 8,500,000 30 Improvements (HD 37) 31 Kodiak: Airport Runway 1,100,000 01 Safety Area Expansion (HD 02 36) 03 Kokhanok: Airport 3,100,000 04 Improvements (HD 36) 05 Kotzebue: Obstruction 6,700,000 06 Removal and Safety Area (HD 07 40) 08 Kotzebue: Airport Master 100,000 09 Plan (HD 40) 10 Kotzebue: Apron Expansion 8,000,000 11 (HD 40) 12 Kotzebue: Sand Building (HD 1,007,000 13 40) 14 Manley: Airport Relocation 976,000 15 (HD 6) 16 Manokotak: Airport 12,350,000 17 Relocation (HD 37) 18 McGrath: New Sand Storage 750,000 19 Building (HD 6) 20 McGrath: Runway 7-25 7,700,000 21 Reconstruction / New 22 General Aviation Apron (HD 23 6) 24 Minto: Runway Relocation 470,000 25 (HD 6) 26 Nanwalek: Airport Master 450,000 27 Plan (HD 33-35) 28 New Stuyahok: Airport 4,000,000 29 Relocation (HD 37) 30 Northern Region: Airport 500,000 31 Rescue and Firefighting 01 Equipment (HD 1-40) 02 Northern Region: Snow 3,440,000 03 Removal Equipment (HD 1-40) 04 Nunapitchuk: Airport and 1,500,000 05 Access Improvements (HD 38) 06 Ouzinkie: Airport 9,000,000 07 Reconstruction and 08 Relocation (HD 36) 09 Perryville: Airport 4,500,000 10 Improvements (HD 37) 11 Pilot Station: Runway 12,300,000 12 Rehabilitation (HD 39) 13 Sand Point: Runway 3,800,000 14 Rehabilitation and 15 Extension (HD 37) 16 Sand Point: Terminal 200,000 17 Redevelopment Plan (HD 37) 18 Seldovia: Snow Removal 700,000 19 Equipment Building 20 Construction (HD 33-35) 21 Shishmaref: Airport 150,000 22 Relocation Study (HD 40) 23 Sitka: Rocky Gutierrez 100,000 24 Terminal Area Master Plan 25 (HD 2) 26 Southeast Region: Snow 2,150,000 27 Removal Equipment (HD 1-40) 28 Statewide: Aviation 18,000,000 29 Preconstruction (HD 1-40) 30 Statewide: Various Airports 3,000,000 31 Minor Surface Improvements 01 (HD 1-40) 02 Stevens Village: Airport 2,962,500 03 Relocation (HD 6) 04 Stony River: Airport 1,150,000 05 Relocation and Airport 06 Improvements (HD 6) 07 Takotna: Airport Relocation 6,800,000 08 (HD 6) 09 Tanana: Airport 1,165,000 10 Improvements (HD 6) 11 Ted Stevens Anchorage 3,000,000 12 International Airport: 13 Aircraft Operations Area 14 Snow Storage (HD 17-32) 15 Ted Stevens Anchorage 550,000 16 International Airport: 17 Aircraft Rescue and Fire 18 Fighting Building 19 Rehabilitation (HD 17-32) 20 Ted Stevens Anchorage 12,668,486 21 International Airport: 22 Airfield Pavement 23 Maintenance (HD 17-32) 24 Ted Stevens Anchorage 1,300,000 25 International Airport: 26 Annual Improvements (HD 27 17-32) 28 Ted Stevens Anchorage 73,190,000 29 International Airport: 30 Concourse A & B Remodel (HD 31 17-32) 01 Ted Stevens Anchorage 5,000,000 02 International Airport: 03 Consolidated Facilities 04 Center (HD 17-32) 05 Ted Stevens Anchorage 2,700,000 06 International Airport: 07 Department of Homeland 08 Security Renovation (HD 09 17-32) 10 Ted Stevens Anchorage 6,745,000 11 International Airport: 12 Equipment (HD 17-32) 13 Ted Stevens Anchorage 3,330,000 14 International Airport: 15 General Aviation Parking 16 and Taxiway Relocation (HD 17 17-32) 18 Ted Stevens Anchorage 2,500,000 19 International Airport: 20 Information Technology 21 Improvements (HD 17-32) 22 Ted Stevens Anchorage 400,000 23 International Airport: 24 Letter of Intent 1 (HD 25 17-32) 26 Ted Stevens Anchorage 800,000 27 International Airport: 28 Letter of Intent 2 (HD 29 17-32) 30 Ted Stevens Anchorage 4,400,000 31 International Airport: 01 Master Plan (HD 17-32) 02 Ted Stevens Anchorage 7,500,000 03 International Airport: 04 Noise Abatement Program 05 Implementation (HD 17-32) 06 Ted Stevens Anchorage 7,474,000 07 International Airport: 08 Security, Safety and Access 09 Control Improvements (HD 10 17-32) 11 Ted Stevens Anchorage 1,800,000 12 International Airport: 13 Terminal Rehabilitation (HD 14 17-32) 15 Tuntutuliak: Airport 6,000,000 16 Relocation (HD 38) 17 Wrangell: Runway Overlay, 10,000,000 18 Runway Safety Area, and 19 Seaplane Pullout (HD 2) 20 Surface Transportation 373,604,700 373,604,700  21 Program  22 Alaska Highway: Milepost 7,770,000 23 1269 to 1314 Rehabilitation 24 - Northway Junction to Tok 25 (HD 6) 26 Alaska Highway: Milepost 1,190,000 27 1308 - Tok Weigh Station 28 (HD 6) 29 Alaska Marine Highways: 500,000 30 Bellingham Terminal 31 Modifications (HD 1-40) 01 Alaska Marine Highways: 4,310,000 02 Haines Terminal 03 Improvements (HD 5) 04 Alaska Marine Highways: 6,400,000 05 Ketchikan Lay-up Berth and 06 Mooring Structures (HD 1) 07 Alaska Marine Highways: 4,200,000 08 Ketchikan Transfer 09 Facilities Improvements (HD 10 1) 11 Alaska Marine Highways: 28,500,000 12 Mainline Ferry 13 Refurbishment (HD 1-40) 14 Ambler: Sewage Lagoon Road 830,000 15 (HD 40) 16 Anchorage-USFS: USFS 1,500,000 17 Portage Valley Blue Ice 18 Trail System Construction 19 (HD 32) 20 Anchorage: Air Quality 500,000 21 Public and Business 22 Awareness Education 23 Campaign (HD 17-32) 24 Anchorage: Anchorage School 500,000 25 District Compressed Natural 26 Gas Buses (HD 17-32) 27 Anchorage: Chester Creek 2,500,000 28 Trail Connection - Tudor 29 Road Crossing to Goose Lake 30 (HD 17-32) 31 Anchorage: DeArmoun Road 7,800,000 01 Reconstruction - 140th 02 Avenue to Hillside Drive 03 (HD 17-32) 04 Anchorage: Eagle River Road 1,400,000 05 Rehabilitation - Milepost 06 5.3 to 12.6 (HD 17-32) 07 Anchorage: Glenn Highway 2,700,000 08 Trail Rehabilitation - 09 Muldoon Road to North 10 Birchwood Loop (HD 17-32) 11 Anchorage: Huffman Road 1,500,000 12 Reconstruction - Old Seward 13 Highway to Lake Otis 14 Parkway (HD 31) 15 Anchorage: Implementation 350,000 16 of Best Management 17 Practices for PM10 Control 18 (HD 17-32) 19 Anchorage: Pavement 4,200,000 20 Replacement Program (HD 21 17-32) 22 Anchorage: Plug-in 150,000 23 Installation at Public 24 Facilities (HD 17-32) 25 Anchorage: Private Sector 500,000 26 Block Heater Incentive 27 Program (HD 17-32) 28 Anchorage: Ridesharing and 670,000 29 Transit Marketing (HD 17-32) 30 Anchorage: Traffic Control 440,000 31 Signalization (HD 17-32) 01 Anchorage: Youth Employment 155,000 02 Program for Transit Stop 03 and Trail Accessibility (HD 04 17-32) 05 Barrow: Dust Control (HD 40) 240,000 06 Bethel: Ptarmigan Street 1,250,000 07 Improvements (HD 38) 08 Bethel: Tundra Ridge Road 500,000 09 Improvements (HD 38) 10 Central Region: Guardrail 1,000,000 11 End Treatment Upgrade (HD 12 1-40) 13 Central Region: Winter 250,000 14 Trail Marking (HD 1-40) 15 Cold Bay Access 2,000,000 16 Improvements (HD 37) 17 Craig: Port Saint Nicholas 3,000,000 18 Road Bituminous Surface 19 Treatment (HD 5) 20 Dalton Highway: Milepost 2,048,000 21 175 to 209 Reconstruction 22 (HD 6) 23 Dalton Highway: Milepost 8,000,000 24 260 to 321 Culvert 25 Replacement (HD 40) 26 Dalton Highway: Milepost 6,000,000 27 55.5 - Yukon River Bridge 28 Rehabilitation (HD 6) 29 Dalton Highway: Milepost 9 2,800,000 30 to 11 Reconstruction - 9 31 Mile Hill (HD 6) 01 Dillingham: Wood River Road 1,000,000 02 Reconstruction (HD 37) 03 Elliott Highway: Milepost 3,500,000 04 18.3 - Washington Creek 05 Bridge Reconstruction (HD 06 7-11) 07 Fairbanks North Star 1,250,000 08 Borough: New Buses and New 09 Routes (HD 7-11) 10 Fairbanks: 2,450,000 11 Illinois-Barnette and 12 Bridge (HD 7-11) 13 Fairbanks: Phillips Field 1,450,000 14 Road Upgrade (HD 7-11) 15 Grayling: Airport Bridge 1,300,000 16 (HD 6) 17 Hyder: Salmon River Road 7,100,000 18 and Trestle Rehabilitation 19 (HD 5) 20 Juneau: Egan Drive - Sunny 20,400,000 21 Point Intersection 22 Improvements (HD 3-4) 23 Kodiak: Rezanof Drive 'Y' 1,700,000 24 Intersection Improvement 25 (HD 36) 26 Kwigillingok: Sanitation 4,000,000 27 Boardwalk Phase 2 (HD 38) 28 Marshall: Airport Access 1,100,000 29 Road Bridge (HD 6) 30 Mat-Su: Wasilla Fishhook 10,500,000 31 Rehabilitation (HD 13-16) 01 MatSu: Seward Meridian Road 3,000,000 02 Improvements (HD 13-16) 03 National Highway System and 30,000,000 04 Non-National Highway System 05 Pavement and Bridge 06 Refurbishment (HD 1-40) 07 New Seward Highway: Rabbit 7,500,000 08 Creek to 36th Avenue (HD 09 17-32) 10 Nome Highway: Bridge 800,000 11 Improvements (HD 39) 12 North Pole: Old Richardson 1,031,000 13 Highway Improvements (HD 14 7-11) 15 Nunam Iqua: Sanitation Road 200,000 16 (HD 39) 17 Old Glenn Highway: 3,500,000 18 Rehabilitation (HD 16) 19 Parks Highway: Milepost 276 3,547,600 20 - Rex Railroad Overcrossing 21 (HD 7-11) 22 Parks Highway: Milepost 285 1,000,000 23 - Julius Creek Bridge (HD 24 7-11) 25 Parks Highway: Milepost 351 4,646,300 26 to 356 Rehabilitation (HD 27 7-11) 28 Parks Highway: Milepost 11,300,000 29 42.1 to 44 Reconstruction - 30 Crusey Street to Lucas Road 31 Reconstruction (HD 13-16) 01 Petersburg: Mitkof Highway 4,800,000 02 Upgrade (HD 2) 03 Richardson Highway: 2,000,000 04 Milepost 127 - Gulkana 05 River Bridge (HD 6) 06 Richardson Highway: 400,000 07 Milepost 226 Erosion 08 Protection (HD 12) 09 Richardson Highway: 1,000,000 10 Milepost 228 - One Mile 11 Creek Bridge (HD 12) 12 Richardson Highway: 2,750,000 13 Milepost 350 - Badger 14 Interchange Ramp and 15 Intersection Improvements 16 (HD 7-11) 17 Richardson Highway: 1,766,500 18 Milepost 357 - Fairbanks 19 New Weigh Station (HD 7-11) 20 Richardson Highway: North 6,900,000 21 Pole Interchange (HD 7-11) 22 Selawik: Boardwalk 290,000 23 Improvements (HD 40) 24 Selawik: Landfill Access 1,800,000 25 Improvements (HD 40) 26 Shaktoolik: Landfill Road 84,300 27 (HD 39) 28 Sitka: Sawmill Creek Road 5,200,000 29 Upgrade (HD 2) 30 Southeast Alaska 150,000 31 Transportation Plan 01 Implementation Management 02 (HD 1-40) 03 Statewide: Bridge 8,000,000 04 Inventory, Inspection, 05 Monitoring, Rehabilitation 06 and Replacement Program (HD 07 1-40) 08 Statewide: Bridge Scour 1,300,000 09 Monitoring and Retrofit 10 Program (HD 1-40) 11 Statewide: Civil Rights 200,000 12 Program (HD 1-40) 13 Statewide: Community 375,000 14 Service Sign Program (HD 15 1-40) 16 Statewide: Comprehensive 300,000 17 Highway Safety Plan (HD 18 1-40) 19 Statewide: Electronic Crash 400,000 20 Web Enablement Form 12-200 21 and Data Transfer (HD 1-40) 22 Statewide: Highway Data 900,000 23 Equipment Acquisition and 24 Installation (HD 1-40) 25 Statewide: Highway Fuel Tax 100,000 26 Enforcement (HD 1-40) 27 Statewide: Highway Safety 5,000,000 28 Improvement Program (HSIP) 29 (HD 1-40) 30 Statewide: Intelligent 2,000,000 31 Transportation Systems 01 Implementation Plan (IWAYS) 02 (HD 1-40) 03 Statewide: Intelligent 600,000 04 Transportation Systems 05 Operations & Maintenance 06 (IWAYS) (HD 1-40) 07 Statewide: Maintenance 600,000 08 Management System (HD 1-40) 09 Statewide: Material Site 1,500,000 10 Investigation (HD 1-40) 11 Statewide: National Highway 750,000 12 Institute and Transit 13 Institute Training (HD 1-40) 14 Statewide: Planning Work 6,000,000 15 Program (HD 1-40) 16 Statewide: Research Program 1,500,000 17 (HD 1-40) 18 Statewide: School Zone 3,000,000 19 Crossing Improvements (HD 20 1-40) 21 Statewide: Seismic Retrofit 1,600,000 22 - Bridges (HD 1-40) 23 Statewide: Urban Planning 1,000,000 24 Program (HD 1-40) 25 Statewide: Weigh-in-Motion 1,100,000 26 Equipment (HD 1-40) 27 Steese Highway: 3rd Street 7,150,000 28 Intersection (HD 7-11) 29 Steese Highway: Milepost 4,311,000 30 62-81 Resurfacing and Minor 31 Rehabilitation (HD 7) 01 Sterling Highway: Milepost 800,000 02 135 - Ninilchik 03 Intersection Improvements 04 and Illumination (HD 33-35) 05 Sterling Highway: Milepost 15,000,000 06 60 to 79 - Skilak Lake Road 07 to Sterling Rehabilitation 08 and Passing Lanes (HD 34) 09 Surface Transportation 45,000,000 10 Preconstruction (HD 1-40) 11 Taylor Highway: Milepost 95 2,000,000 12 to 160 Safety Improvements 13 (HD 6) 14 Unalakleet: Landfill Access 350,000 15 Road (HD 39) 16 Unalaska: South Channel 3,500,000 17 Bridge Construction (HD 37) 18 Wasilla: Crusey Street 2,200,000 19 Improvements (HD 14) 20 Whittier: Maintenance and 2,000,000 21 Operations (HD 17-32) 22 (SECTION 2 OF THIS ACT BEGINS ON PAGE 26) 01 * Sec. 2. The following sets out the funding by agency for the appropriations made in sec. 1 of 02 this Act. 03 Funding Source Amount 04 Department of Environmental Conservation 05 1002 Federal Receipts 61,402,700 06 1003 General Fund Match 20,536,800 07 *** Total Agency Funding *** $81,939,500 08 Department of Transportation/Public Facilities 09 1002 Federal Receipts 647,721,811 10 1003 General Fund Match 56,500,000 11 1027 International Airports Revenue Fund 42,494,000 12 1061 Capital Improvement Project Receipts 400,000 13 1112 International Airports Construction Fund 111,239,000 14 1179 Passenger Facility Charges 4,200,000 15 *** Total Agency Funding *** $862,554,811 16 * * * * * Total Budget * * * * * $944,494,311 17 (SECTION 3 OF THIS ACT BEGINS ON PAGE 27) 01 * Sec. 3. The following sets out the statewide funding for the appropriations made in sec. 1 of 02 this Act. 03 Funding Source Amount 04 General Funds 05 1003 General Fund Match 77,036,800 06 ***Total General Funds*** $77,036,800 07 Federal Funds 08 1002 Federal Receipts 709,124,511 09 ***Total Federal Funds*** $709,124,511 10 Other Non-Duplicated Funds 11 1027 International Airports Revenue Fund 42,494,000 12 1179 Passenger Facility Charges 4,200,000 13 ***Total Other Non-Duplicated Funds*** $46,694,000 14 Duplicated Funds 15 1061 Capital Improvement Project Receipts 400,000 16 1112 International Airports Construction Fund 111,239,000 17 ***Total Duplicated Funds*** $111,639,000 18 (SECTION 4 OF THIS ACT BEGINS ON PAGE 28) 01  * Sec. 4. This Act takes effect July 1, 2005.