txt

CSSB 26(FIN): "An Act making and amending appropriations, including capital appropriations, supplemental appropriations, reappropriations, and other appropriations; making appropriations to capitalize funds; making appropriations under art. IX, sec. 17(c), Constitution of the State of Alaska, from the constitutional budget reserve fund; and providing for an effective date."

00 CS FOR SENATE BILL NO. 26(FIN) 01 "An Act making and amending appropriations, including capital appropriations, 02 supplemental appropriations, reappropriations, and other appropriations; making 03 appropriations to capitalize funds; making appropriations under art. IX, sec. 17(c), 04 Constitution of the State of Alaska, from the constitutional budget reserve fund; and 05 providing for an effective date." 06 BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF ALASKA: 07 (SECTION 1 OF THIS ACT BEGINS ON PAGE 2)

01 * Section 1. The following appropriation items are for capital projects and grants from the 02 general fund or other funds as set out in section 2 of this Act by funding source to the 03 agencies named for the purposes expressed and lapse under AS 37.25.020, unless otherwise 04 noted. 05 Appropriation General Other 06 Allocations Items Funds Funds 07 * * * * * * * * * * 08 * * * * * Department of Administration * * * * * 09 * * * * * * * * * * 10 General Services Public Building Fund 3,000,000 3,000,000 11 Buildings Deferred Maintenance (HD 1- 12 40) 13 * * * * * * * * * * 14 * * * * * Department of Commerce, Community and Economic Development * * * * * 15 * * * * * * * * * * 16 Community Block Grants (HD 1-40) 6,060,000 60,000 6,000,000 17 Alaska Energy Authority - Round VIII 11,512,659 11,512,659 18 Renewable Energy Project Grants (AS 19 42.45.045) 20 Angoon Low-Income Housing 240,592 21 Pellet District Heat (HD 22 35) 23 Southeast Island School 832,635 24 District Wood Boilers (HD 25 35) 26 Hoonah Biomass District 45,000 27 Heating Loop (HD 35) 28 Bethel Heat Recovery 645,613 29 Assessment & Conceptual 30 Design (HD 38) 31 Sand Point Excess Wind 307,120

01 Utilization (HD 37) 02 Hydaburg Schools Wood Fired 620,977 03 Boiler Project (HD 36) 04 Lepquinum Center Ground 3,445,040 05 Source Heat Pump (HD 36) 06 Scammon Bay Community 756,335 07 Facilities Heat Recovery 08 (HD 39) 09 St. Mary's-Pitka's Point 4,348,540 10 Wind (HD 39) 11 Wood Boiler for the Native 270,807 12 Village of Tazlina (HD 6) 13 * * * * * * * * * * 14 * * * * * Department of Education and Early Development * * * * * 15 * * * * * * * * * * 16 Major Maintenance Grant Fund (AS 2,623,689 2,623,689 17 14.11.007) 18 School District Major 2,623,689 19 Maintenance Grants (HD 1- 20 40) 21 School Construction Grant Fund (AS 22 14.11.005) 23 Kivalina K-12 Replacement School - 43,237,400 43,237,400 24 Kasayulie (HD 40) 25 * * * * * * * * * * 26 * * * * * Department of Environmental Conservation * * * * * 27 * * * * * * * * * * 28 Drinking Water Capitalization Grant - 2,526,300 2,526,300 29 Subsidy Funding (HD 1-40) 30 Village Safe Water and Wastewater 51,500,000 8,750,000 42,750,000 31 Infrastructure Projects

01 First Time Service Projects 30,900,000 02 (HD 1-40) 03 Expansion, Upgrade, and 20,600,000 04 Replacement of Existing 05 Service (HD 1-40) 06 Municipal Water, Sewage, and Solid 7,587,347 7,587,347 07 Waste Facilities Grants (AS 46.03.030) 08 Juneau - Water Treatment 3,090,000 09 Improvements, Phase II (HD 10 33-34) 11 Homer - Water Storage and 1,980,254 12 Distribution Improvements 13 (HD 31) 14 North Pole - Sewer 2,018,800 15 Improvements, Phase III (HD 16 3) 17 Naknek - Sewer Relocation 498,293 18 and System Upgrade (HD 37) 19 * * * * * * * * * * 20 * * * * * Department of Fish and Game * * * * * 21 * * * * * * * * * * 22 Kenai Peninsula Aquatic Ecosystem 8,175,000 8,175,000 23 Restoration (HD 29-31) 24 Shooting Range Deferred Maintenance 500,000 500,000 25 (HD 1-40) 26 Sport Fish Recreational Boating and 3,000,000 750,000 2,250,000 27 Angler Access (HD 1-40) 28 Wildlife Management, Research and 12,250,000 500,000 11,750,000 29 Hunting Access (HD 1-40) 30 * * * * * * * * * * 31 * * * * * Department of Health and Social Services * * * * *

01 * * * * * * * * * * 02 Emergency Medical Services Match for 500,000 500,000 03 Code Blue Project (HD 1-40) 04 * * * * * * * * * * 05 * * * * * Department of Military and Veterans Affairs * * * * * 06 * * * * * * * * * * 07 Army Guard Facilities Projects (HD 15) 15,150,000 15,150,000 08 Deferred Maintenance, Renewal, Repair 11,622,200 11,622,200 09 and Equipment (HD 1-40) 10 State Homeland Security Grant Programs 4,500,000 4,500,000 11 (HD 1-40) 12 * * * * * * * * * * 13 * * * * * Department of Natural Resources * * * * * 14 * * * * * * * * * * 15 Abandoned Mine Lands Reclamation 3,200,000 3,200,000 16 Federal Program (HD 1-40) 17 Coastal Impact Assistance Program 5,000,000 5,000,000 18 Funds (HD 6) 19 Cook Inlet Oil and Gas Resources and 800,000 400,000 400,000 20 Statewide Energy Database (HD 1-40) 21 Cooperative Water Resource Program 2,500,000 2,500,000 22 Pass-through to USGS for Stream Gaging 23 Projects (HD 1-40) 24 Federal and Local Government Funded 1,800,000 1,800,000 25 Forest Resource and Fire Program 26 Projects (HD 1-40) 27 National Historic Preservation Fund 800,000 150,000 650,000 28 (HD 1-40) 29 National Recreational Trails Federal 1,700,000 200,000 1,500,000 30 Grant Program (HD 1-40) 31 Upgrade and Repair of Critical Volcano 500,000 500,000

01 Monitoring Instruments (HD 1-40) 02 * * * * * * * * * * 03 * * * * * Department of Public Safety * * * * * 04 * * * * * * * * * * 05 Marine Fisheries Patrol Improvements 1,200,000 1,200,000 06 (HD 1-40) 07 * * * * * * * * * * 08 * * * * * Department of Revenue * * * * * 09 * * * * * * * * * * 10 Alaska Housing Finance Corporation 11 Affordable Housing Development Program 22,400,000 22,400,000 12 (HD 12-28) 13 Cold Climate Housing Research Center 500,000 500,000 14 (CCHRC) (HD 1-40) 15 Competitive Grants for Public Housing 1,100,000 350,000 750,000 16 (HD 1-40) 17 Federal and Other Competitive Grants 4,500,000 1,500,000 3,000,000 18 (HD 1-40) 19 Housing and Urban Development Capital 2,500,000 2,500,000 20 Fund Program (HD 1-40) 21 Housing and Urban Development Federal 4,500,000 750,000 3,750,000 22 HOME Grant (HD 1-40) 23 Rental Assistance for Victims - 1,500,000 1,500,000 24 Empowering Choice Housing Program 25 (ECHP) (HD 1-40) 26 Teacher, Health and Public Safety 1,950,000 1,950,000 27 Professionals Housing (HD 1-40) 28 Weatherization Program (HD 1-40) 7,100,000 5,600,000 1,500,000 29 * * * * * * * * * * 30 * * * * * Department of Transportation and Public Facilities * * * * * 31 * * * * * * * * * *

01 Adak Airport Maintenance and 742,800 742,800 02 Operations (HD 37) 03 Capital Improvement Program Equipment 5,000,000 5,000,000 04 Replacement (HD 1-40) 05 Deferred Maintenance, Renewal, Repair 5,000,000 5,000,000 06 and Equipment (HD 1-40) 07 Public and Community Transportation 750,000 750,000 08 Systems Support (HD 1-40) 09 State Equipment Fleet Replacement (HD 15,000,000 15,000,000 10 1-40) 11 Municipal Harbor Facility Grant Fund 12 (AS 29.60.800) 13 Municipal Harbor Facility Grant Fund 4,497,000 4,497,000 14 Projects (HD 1-40) 15 Federal Program Match 62,900,000 62,900,000 16 Federal-Aid Aviation State 11,700,000 17 Match (HD 1-40) 18 Federal-Aid Highway State 50,000,000 19 Match (HD 1-40) 20 Other Federal Program Match 1,200,000 21 (HD 1-40) 22 Airport Improvement Program 137,047,105 137,047,105 23 Alaska International 5,000,000 24 Airport System - 25 Contingency Funds (HD 1-40) 26 Ambler - Airport 2,500,000 27 Improvements (HD 40) 28 Bethel - Airport 1,650,000 29 Improvements (HD 38) 30 Fairbanks International 27,000 31 Airport - Advanced Project

01 Design and Planning (HD 1- 02 5) 03 Fairbanks International 292,000 04 Airport - Annual 05 Improvements (HD 1-5) 06 Fairbanks International 133,000 07 Airport - Environmental 08 Assessment and Cleanup (HD 09 1-5) 10 Fairbanks International 1,420,000 11 Airport - Equipment (HD 1- 12 5) 13 Fairbanks International 106,000 14 Airport - Facility 15 Improvements, Renovations 16 and Upgrades (HD 1-5) 17 Fairbanks International 32,000 18 Airport - Information 19 Technology Improvements (HD 20 1-5) 21 Fairbanks International 7,000,000 22 Airport - Taxiway B 23 Reconstruction and Safety 24 Enhancements (HD 1-5) 25 Fairbanks International 1,500,000 26 Airport - TSA Explosive 27 Detection System 28 Recapitalization 29 Construction (HD 1-5) 30 Galena - Airport 13,500,000 31 Improvements (HD 39)

01 Gambell Airport Pavement 9,500,000 02 Rehabilitation and Lighting 03 Replacement (HD 39) 04 Hooper Bay - Airport 3,200,000 05 Improvements and Snow 06 Removal Equipment Building 07 (HD 39) 08 Hughes - Airport 6,300,000 09 Improvements (HD 40) 10 Kwigillingok - Airport 1,600,000 11 improvements & Snow Removal 12 Equipment Building (HD 38) 13 Statewide - Aviation 18,000,000 14 Preconstruction (HD 1-40) 15 Statewide - Aviation 500,000 16 Systems Plan Update (HD 1- 17 40) 18 Statewide - Various 6,000,000 19 Airports Minor Surface 20 Improvements (HD 1-40) 21 Statewide - Various 12,000,000 22 Airports Snow Removal, ADA 23 and Safety Equipment (HD 1- 24 40) 25 Talkeetna - Airport 1,300,000 26 Improvements (HD 10) 27 Ted Stevens Anchorage 604,713 28 International Airport - 29 Advanced Project Design and 30 Planning (HD 12-28) 31 Ted Stevens Anchorage 26,946,860

01 International Airport - 02 Airfield Pavement 03 Reconstruction and 04 Maintenance (HD 12-28) 05 Ted Stevens Anchorage 763,848 06 International Airport - 07 Annual Improvements (HD 12- 08 28) 09 Ted Stevens Anchorage 106,090 10 International Airport - 11 Environmental Projects (HD 12 12-28) 13 Ted Stevens Anchorage 4,880,140 14 International Airport - 15 Equipment (HD 12-28) 16 Ted Stevens Anchorage 1,166,990 17 International Airport - 18 Facility Improvements, 19 Renovations and Upgrades 20 (HD 12-28) 21 Ted Stevens Anchorage 1,018,464 22 International Airport - 23 Information Technology 24 Improvements (HD 12-28) 25 Yakutat - Airport Runway, 10,000,000 26 Taxiway and Apron 27 Rehabilitation (HD 32) 28 Surface Transportation Program 924,520,000 924,520,000 29 Alaska Highway - 11,000,000 30 Rehabilitation and 31 Reconstruction (HD 1-40)

01 Alaska Historic Roads 750,000 02 Implementation (HD 1-40) 03 Alaska Marine Highway 1,700,000 04 System - Auke Bay Stern 05 Berth Modification and 06 Improvements (HD 34) 07 Alaska Marine Highway 1,000,000 08 System - Construct / Lease 09 / Purchase Ferryboats and 10 Terminals (HD 1-40) 11 Alaska Marine Highway 10,000,000 12 System - Ferry Vessel 13 Refurbishment (HD 1-40) 14 Alaska Marine Highway 150,000 15 System - Fleet Condition 16 Survey Update (HD 1-40) 17 Alaska Marine Highway 3,500,000 18 System - Gustavus Ferry 19 Terminal Modifications (HD 20 33) 21 Alaska Marine Highway 1,000,000 22 System - Ketchikan Ferry 23 Terminal Improvements (HD 24 36) 25 Alaska Marine Highway 34,000,000 26 System - M/V Matanuska 27 Repower and Ship Systems 28 Upgrade (HD 1-40) 29 Alaska Marine Highway 1,000,000 30 System - System-Wide Anode 31 Replacement (HD 1-40)

01 Alaska Marine Highway 4,000,000 02 System - Tenakee Ferry 03 Terminal Improvements (HD 04 35) 05 Alaska Marine Highway 2,000,000 06 System - Wastewater 07 Treatment System Upgrades 08 (HD 1-40) 09 Aleknagik - Wood River 7,500,000 10 Bridge (HD 37) 11 American Association of 200,000 12 State Highway and 13 Transportation Officials 14 Technical Programs Support 15 (HD 1-40) 16 Anchorage - Principal 15,000,000 17 Arterial Pavement 18 Resurfacing and ADA 19 Compliance (HD 12-28) 20 Anchorage Metropolitan Area 32,000,000 21 Transportation Solutions 22 (AMATS) Projects, Flexible 23 (HD 12-28) 24 Barrow - Ahkovak Street 7,500,000 25 Upgrade (HD 40) 26 Kotzebue - Cape Blossom 33,000,000 27 Road (HD 40) 28 Central Region Parks 50,000,000 29 Highway - Rehabilitation 30 and Reconstruction (HD 7- 31 31)

01 Chiniak Highway - Erosion 5,500,000 02 Response (HD 32) 03 Cultural and Historic 200,000 04 Resource Evaluation 05 Streamlining (HD 1-40) 06 Dalton Highway - 5,000,000 07 Rehabilitation and 08 Reconstruction (HD 1-40) 09 Fairbanks - Airport Way 3,500,000 10 (West) Improvements (HD 1- 11 5) 12 Fairbanks Metropolitan Area 10,000,000 13 Transportation System 14 (FMATS) Projects, Flexible 15 (HD 1-5) 16 Geographic Information 3,000,000 17 System (GIS) Development 18 (IWAYS) (HD 1-40) 19 Glenn Highway - 45,000,000 20 Rehabilitation and 21 Reconstruction (HD 1-40) 22 Gustavus - Repair or 400,000 23 Replace Rink Creek Bridge 24 (HD 33) 25 Highway Performance 300,000 26 Monitoring System (HPMS) 27 Reporting (HD 1-40) 28 Inter-Island Ferry 250,000 29 Authority - Vessel 30 Refurbishment (HD 36) 31 Juneau - Egan Drive and 1,000,000

01 Riverside Drive 02 Intersection Improvements 03 (HD 34) 04 Juneau - Glacier Highway 4,000,000 05 Rehabilitation and 06 Reconstruction (HD 34) 07 Juneau - Industrial 3,000,000 08 Boulevard Widening and 09 Sidewalks (HD 34) 10 Kenai - Beaver Loop Road 2,000,000 11 Improvement and Pedestrian 12 Pathway (HD 30) 13 Kenai - Kenai Spur Road 5,200,000 14 Improvements (HD 30) 15 Ketchikan - Front, Mill, 8,000,000 16 and Stedman Street 17 Reconstruction (HD 36) 18 Ketchikan - Replacement of 7,000,000 19 Water Street Trestle No. 2 20 (HD 36) 21 Ketchikan - Tongass Highway 33,000,000 22 Rehabilitation and 23 Reconstruction (HD 36) 24 National Highway System and 155,220,000 25 Non-National Highway System 26 Pavement and Bridge 27 Reconstruction and 28 Refurbishment (HD 1-40) 29 National Highway System 20,000,000 30 Modernization (HD 1-40) 31 Northern Region - Winter 500,000

01 Trail Markings (HD 1-40) 02 Northern Region Parks 65,000,000 03 Highway - Rehabilitation 04 and Reconstruction (HD 1- 05 40) 06 Office of History and 500,000 07 Archeology - Alaska 08 Heritage Resources Survey/ 09 Integrated Business System 10 Development (HD 1-40) 11 Richardson Highway - 25,000,000 12 Rehabilitation and 13 Reconstruction (HD 1-40) 14 Seward - Road Improvements 800,000 15 (HD 29) 16 Seward Highway - 90,000,000 17 Rehabilitation and 18 Reconstruction (HD 1-40) 19 Southeast Areawide - 1,000,000 20 Americans with Disabilities 21 Act (ADA) Improvements (HD 22 33-36) 23 Statewide - Civil Rights 400,000 24 Program (HD 1-40) 25 Statewide - Congestion 10,000,000 26 Mitigation and Air Quality 27 (CMAQ) Projects (HD 1-40) 28 Statewide - Federal Lands 10,000,000 29 Access Projects (HD 1-40) 30 Statewide - Highway Data 3,500,000 31 Equipment Acquisition and

01 Installation (HD 1-40) 02 Statewide - Highway Fuel 100,000 03 Tax Enforcement (HD 1-40) 04 Statewide - Highway Safety 60,000,000 05 Improvement Program (HSIP) 06 (HD 1-40) 07 Statewide - Intelligent 6,500,000 08 Transportation Systems 09 Implementation Plan (IWAYS) 10 (HD 1-40) 11 Statewide - National 750,000 12 Highway Institute and 13 Transit Institute Training 14 (HD 1-40) 15 Statewide - Research 3,000,000 16 Program (HD 1-40) 17 Statewide - Road Weather 3,000,000 18 Information System (RWIS) 19 (HD 1-40) 20 Statewide - Roadway Data 2,000,000 21 Collection (HD 1-40) 22 Statewide - Urban Planning 2,000,000 23 Program (HD 1-40) 24 Sterling Highway - 35,000,000 25 Rehabilitation and 26 Reconstruction (HD 1-40) 27 Surface Transportation 65,000,000 28 Preconstruction (HD 1-40) 29 Tok Cutoff Highway - 12,000,000 30 Rehabilitation and 31 Reconstruction (HD 6)

01 Whittier Tunnel - 1,600,000 02 Maintenance and Operations 03 (HD 9) 04 Statewide Federal Programs 91,500,000 91,500,000 05 Cooperative Reimbursable 17,000,000 06 Projects (HD 1-40) 07 Federal Contingency 25,000,000 08 Projects (HD 1-40) 09 Federal Emergency Projects 10,000,000 10 (HD 1-40) 11 Federal Transit 10,000,000 12 Administration Grants (HD 13 1-40) 14 Highway Safety Grants 8,000,000 15 Program (HD 1-40) 16 Statewide Safety Program 21,500,000 17 (HD 1-40) 18 * * * * * * * * * * 19 * * * * * University of Alaska * * * * * 20 * * * * * * * * * * 21 Deferred Maintenance, Renewal, Repair 3,000,000 3,000,000 22 and Equipment (HD 1-40) 23 (SECTION 2 OF THIS ACT BEGINS ON THE NEXT PAGE)

01 * Sec. 2. The following sets out the funding by agency for the appropriations made in sec. 1 of 02 this Act. 03 Funding Source Amount 04 Department of Administration 05 1147 Public Building Fund 3,000,000 06 *** Total Agency Funding *** 3,000,000 07 Department of Commerce, Community and Economic Development 08 1002 Federal Receipts 6,000,000 09 1003 General Fund Match 60,000 10 1210 Renewable Energy Grant Fund 11,512,659 11 *** Total Agency Funding *** 17,572,659 12 Department of Education and Early Development 13 1004 Unrestricted General Fund Receipts 1,311,036 14 1140 Alaska Industrial Development and Export Authority Dividend 1,312,653 15 1197 Alaska Capital Income Fund 43,237,400 16 *** Total Agency Funding *** 45,861,089 17 Department of Environmental Conservation 18 1002 Federal Receipts 42,250,000 19 1100 Alaska Drinking Water Fund 2,526,300 20 1108 Statutory Designated Program Receipts 500,000 21 1140 Alaska Industrial Development and Export Authority Dividend 16,337,347 22 *** Total Agency Funding *** 61,613,647 23 Department of Fish and Game 24 1002 Federal Receipts 13,875,000 25 1003 General Fund Match 1,250,000 26 1018 Exxon Valdez Oil Spill Trust--Civil 8,175,000 27 1024 Fish and Game Fund 125,000 28 1108 Statutory Designated Program Receipts 500,000 29 *** Total Agency Funding *** 23,925,000 30 Department of Health and Social Services 31 1003 General Fund Match 500,000

01 *** Total Agency Funding *** 500,000 02 Department of Military and Veterans Affairs 03 1002 Federal Receipts 31,272,200 04 *** Total Agency Funding *** 31,272,200 05 Department of Natural Resources 06 1002 Federal Receipts 12,650,000 07 1003 General Fund Match 750,000 08 1108 Statutory Designated Program Receipts 2,900,000 09 *** Total Agency Funding *** 16,300,000 10 Department of Public Safety 11 1002 Federal Receipts 1,200,000 12 *** Total Agency Funding *** 1,200,000 13 Department of Revenue 14 1002 Federal Receipts 33,900,000 15 1004 Unrestricted General Fund Receipts 1,958,600 16 1139 Alaska Housing Finance Corporation Dividend 8,691,400 17 1180 Alcohol and Other Drug Abuse Treatment & Prevention Fund 1,500,000 18 *** Total Agency Funding *** 46,050,000 19 Department of Transportation and Public Facilities 20 1002 Federal Receipts 1,129,559,623 21 1003 General Fund Match 62,900,000 22 1004 Unrestricted General Fund Receipts 10,247,000 23 1026 Highways Equipment Working Capital Fund 15,000,000 24 1027 International Airports Revenue Fund 4,567,884 25 1061 Capital Improvement Project Receipts 5,400,000 26 1108 Statutory Designated Program Receipts 12,000,000 27 1112 International Airports Construction Fund 6,539,598 28 1190 Adak Airport Operations 742,800 29 *** Total Agency Funding *** 1,246,956,905 30 University of Alaska 31 1004 Unrestricted General Fund Receipts 3,000,000

01 *** Total Agency Funding *** 3,000,000 02 * * * * * Total Budget * * * * * 1,497,251,500 03 (SECTION 3 OF THIS ACT BEGINS ON THE NEXT PAGE)

01 * Sec. 3. The following sets out the statewide funding for the appropriations made in sec. 1 of 02 this Act. 03 Funding Source Amount 04 Unrestricted General 05 1003 General Fund Match 65,460,000 06 1004 Unrestricted General Fund Receipts 16,516,636 07 1139 Alaska Housing Finance Corporation Dividend 8,691,400 08 1140 Alaska Industrial Development and Export Authority Dividend 17,650,000 09 *** Total Unrestricted General *** 108,318,036 10 Designated General 11 1180 Alcohol and Other Drug Abuse Treatment & Prevention Fund 1,500,000 12 1197 Alaska Capital Income Fund 43,237,400 13 1210 Renewable Energy Grant Fund 11,512,659 14 *** Total Designated General *** 56,250,059 15 Other Non-Duplicated 16 1018 Exxon Valdez Oil Spill Trust--Civil 8,175,000 17 1024 Fish and Game Fund 125,000 18 1027 International Airports Revenue Fund 4,567,884 19 1108 Statutory Designated Program Receipts 15,900,000 20 *** Total Other Non-Duplicated *** 28,767,884 21 Federal Receipts 22 1002 Federal Receipts 1,270,706,823 23 1190 Adak Airport Operations 742,800 24 *** Total Federal Receipts *** 1,271,449,623 25 Other Duplicated 26 1026 Highways Equipment Working Capital Fund 15,000,000 27 1061 Capital Improvement Project Receipts 5,400,000 28 1100 Alaska Drinking Water Fund 2,526,300 29 1112 International Airports Construction Fund 6,539,598 30 1147 Public Building Fund 3,000,000 31 *** Total Other Duplicated *** 32,465,898

01 (SECTION 4 OF THIS ACT BEGINS ON THE NEXT PAGE)

01 * Sec. 4. The following appropriation items are for supplemental capital projects and grants 02 from the general fund or other funds as set out in section 5 of this Act by funding source to 03 the agencies named for the purposes expressed and lapse under AS 37.25.020, unless 04 otherwise noted. 05 Appropriation General Other 06 Allocations Items Funds Funds 07 * * * * * * * * * * 08 * * * * * Department of Commerce, Community and Economic Development * * * * * 09 * * * * * * * * * * 10 Alaska Energy Authority - Emerging 690,000 690,000 11 Energy Technology Project Data 12 Collection and Technical Assistance 13 (HD 1-40) 14 Edna Bay Organizational Grant (HD 35) 75,000 75,000 15 Grants to Municipalities (AS 16 37.05.315) 17 Cordova - Cordova Community Center (HD 1,500,000 1,500,000 18 32) 19 (SECTION 5 OF THIS ACT BEGINS ON THE NEXT PAGE)

01 * Sec. 5. The following sets out the funding by agency for the appropriations made in sec. 4 of 02 this Act. 03 Funding Source Amount 04 Department of Commerce, Community and Economic Development 05 1002 Federal Receipts 690,000 06 1004 Unrestricted General Fund Receipts 75,000 07 1018 Exxon Valdez Oil Spill Trust--Civil 1,500,000 08 *** Total Agency Funding *** 2,265,000 09 * * * * * Total Budget * * * * * 2,265,000 10 (SECTION 6 OF THIS ACT BEGINS ON THE NEXT PAGE)

01 * Sec. 6. The following sets out the statewide funding for the appropriations made in sec. 4 of 02 this Act. 03 Funding Source Amount 04 Unrestricted General 05 1004 Unrestricted General Fund Receipts 75,000 06 *** Total Unrestricted General *** 75,000 07 Other Non-Duplicated 08 1018 Exxon Valdez Oil Spill Trust--Civil 1,500,000 09 *** Total Other Non-Duplicated *** 1,500,000 10 Federal Receipts 11 1002 Federal Receipts 690,000 12 *** Total Federal Receipts *** 690,000 13 (SECTION 7 OF THIS ACT BEGINS ON THE NEXT PAGE)

01 * Sec. 7. The following appropriation items are for operating expenditures from the general 02 fund or other funds as set out in section 7 of this Act to the agencies named for the purposes 03 expressed for the fiscal year beginning July 1, 2014 and ending June 30, 2015, unless 04 otherwise indicated. A department-wide, or branch-wide unallocated reduction set out in this 05 section may be allocated among the appropriations made in this section to that department, 06 agency, or branch. 07 Appropriation General Other 08 Allocations Items Funds Funds 09 * * * * * * * * * * 10 * * * * * Department of Administration * * * * * 11 * * * * * * * * * * 12 Centralized Administrative Services -140,000 -140,000 13 Finance 110,000 14 Personnel -250,000 15 Legal and Advocacy Services 300,000 300,000 16 Office of Public Advocacy 150,000 17 Public Defender Agency 150,000 18 * * * * * * * * * * 19 * * * * * Department of Commerce, Community and Economic Development * * * * * 20 * * * * * * * * * * 21 Corporations, Business and -39,400 -39,400 22 Professional Licensing 23 Corporations, Business and -39,400 24 Professional Licensing 25 * * * * * * * * * * 26 * * * * * Department of Corrections * * * * * 27 * * * * * * * * * * 28 Recidivism Reduction Grants -70,700 -70,700 29 Recidivism Reduction Grants -70,700 30 * * * * * * * * * * 31 * * * * * Department of Education and Early Development * * * * *

01 * * * * * * * * * * 02 K-12 Support 2,000,000 2,000,000 03 Foundation Program 2,000,000 04 * * * * * * * * * * 05 * * * * * Department of Fish and Game * * * * * 06 * * * * * * * * * * 07 Wildlife Conservation 460,000 460,000 08 Wildlife Conservation 460,000 09 * * * * * * * * * * 10 * * * * * Department of Health and Social Services * * * * * 11 * * * * * * * * * * 12 Children's Services 6,650,000 4,950,000 1,700,000 13 Foster Care Base Rate 2,300,000 14 Foster Care Special Need 950,000 15 Subsidized Adoptions & 3,400,000 16 Guardianship 17 Departmental Support Services -101,000 -101,000 18 Administrative Support -101,000 19 Services 20 * * * * * * * * * * 21 * * * * * Department of Natural Resources * * * * * 22 * * * * * * * * * * 23 Administration & Support Services -50,000 -50,000 24 Commissioner's Office -50,000 25 Oil & Gas -100,000 -100,000 26 Oil & Gas -100,000 27 * * * * * * * * * * 28 * * * * * Department of Revenue * * * * * 29 * * * * * * * * * * 30 Taxation and Treasury 9,296,700 -813,000 10,109,700 31 Tax Division -850,000

01 Treasury Division 46,700 02 Alaska Retirement 10,100,000 03 Management Board Custody 04 and Management Fees 05 Alaska Municipal Bond Bank Authority 50,000 50,000 06 AMBBA Operations 50,000 07 (SECTION 8 OF THIS ACT BEGINS ON THE NEXT PAGE)

01 * Sec. 8. The following sets out the funding by agency for the appropriations made in sec. 7 of 02 this Act. 03 Funding Source Amount 04 Department of Administration 05 1004 Unrestricted General Fund Receipts 160,000 06 1007 Interagency Receipts -1,500 07 1017 Group Health and Life Benefits Fund 2,050,000 08 1029 Public Employees Retirement Trust Fund -1,168,500 09 1034 Teachers Retirement Trust Fund -900,000 10 1042 Judicial Retirement System -10,000 11 1045 National Guard & Naval Militia Retirement System 30,000 12 *** Total Agency Funding *** 160,000 13 Department of Commerce, Community and Economic Development 14 1156 Receipt Supported Services -39,400 15 *** Total Agency Funding *** -39,400 16 Department of Corrections 17 1004 Unrestricted General Fund Receipts -70,700 18 *** Total Agency Funding *** -70,700 19 Department of Education and Early Development 20 1066 Public School Trust Fund 2,000,000 21 *** Total Agency Funding *** 2,000,000 22 Department of Fish and Game 23 1002 Federal Receipts 345,000 24 1108 Statutory Designated Program Receipts 115,000 25 *** Total Agency Funding *** 460,000 26 Department of Health and Social Services 27 1002 Federal Receipts 1,669,700 28 1003 General Fund Match 1,700,000 29 1004 Unrestricted General Fund Receipts 950,000 30 1005 General Fund/Program Receipts 2,300,000 31 1007 Interagency Receipts -70,700

01 *** Total Agency Funding *** 6,549,000 02 Department of Natural Resources 03 1004 Unrestricted General Fund Receipts -150,000 04 *** Total Agency Funding *** -150,000 05 Department of Revenue 06 1004 Unrestricted General Fund Receipts -850,000 07 1017 Group Health and Life Benefits Fund 25,915,600 08 1029 Public Employees Retirement Trust Fund -12,046,800 09 1034 Teachers Retirement Trust Fund -3,767,000 10 1042 Judicial Retirement System -9,100 11 1045 National Guard & Naval Militia Retirement System 17,000 12 1066 Public School Trust Fund 12,300 13 1104 Alaska Municipal Bond Bank Receipts 50,000 14 1169 Power Cost Equalization Endowment Fund Earnings 24,700 15 *** Total Agency Funding *** 9,346,700 16 * * * * * Total Budget * * * * * 18,255,600 17 (SECTION 9 OF THIS ACT BEGINS ON THE NEXT PAGE)

01 * Sec. 9. The following sets out the statewide funding for the appropriations made in sec. 7 of 02 this Act. 03 Funding Source Amount 04 Unrestricted General 05 1003 General Fund Match 1,700,000 06 1004 Unrestricted General Fund Receipts 39,300 07 *** Total Unrestricted General *** 1,739,300 08 Designated General 09 1005 General Fund/Program Receipts 2,300,000 10 1066 Public School Trust Fund 2,012,300 11 1156 Receipt Supported Services -39,400 12 1169 Power Cost Equalization Endowment Fund Earnings 24,700 13 *** Total Designated General *** 4,297,600 14 Other Non-Duplicated 15 1017 Group Health and Life Benefits Fund 27,965,600 16 1029 Public Employees Retirement Trust Fund -13,215,300 17 1034 Teachers Retirement Trust Fund -4,667,000 18 1042 Judicial Retirement System -19,100 19 1045 National Guard & Naval Militia Retirement System 47,000 20 1104 Alaska Municipal Bond Bank Receipts 50,000 21 1108 Statutory Designated Program Receipts 115,000 22 *** Total Other Non-Duplicated *** 10,276,200 23 Federal Receipts 24 1002 Federal Receipts 2,014,700 25 *** Total Federal Receipts *** 2,014,700 26 Other Duplicated 27 1007 Interagency Receipts -72,200 28 *** Total Other Duplicated *** -72,200 29 (SECTION 10 OF THIS ACT BEGINS ON THE NEXT PAGE)

01 * Sec. 10. DEPARTMENT OF ADMINISTRATION. The sum of $3,000,000 is 02 appropriated from the general fund to the Department of Administration, labor relations, for 03 the purpose of paying costs associated with the Alaska Correctional Officers Association 04 settlement for the fiscal year ending June 30, 2015. 05 * Sec. 11. DEPARTMENT OF LAW. (a) The sum of $8,889,900 is appropriated from the 06 general fund to the Department of Law, civil division, deputy attorney general's office, for the 07 purpose of paying judgments and settlements against the state for the fiscal year ending 08 June 30, 2015. 09 (b) The amount necessary, after application of the amount appropriated in (a) of this 10 section, to pay judgments awarded against the state on or before June 30, 2015, is 11 appropriated from the general fund to the Department of Law, civil division, deputy attorney 12 general's office, for the purpose of paying judgments against the state for the fiscal year 13 ending June 30, 2015. 14 * Sec. 12. DEPARTMENT OF TRANSPORTATION AND PUBLIC FACILITIES. (a) The 15 unexpended and unobligated balance, estimated to be $3,403,000, of the appropriation made 16 in sec. 1, ch. 82, SLA 2006, page 85, lines 9 - 10, as amended by sec. 32(d), ch. 16, SLA 2013 17 (Department of Transportation and Public Facilities, Corps of Engineers, harbor program) is 18 reappropriated to the Department of Transportation and Public Facilities for the 19 Environmental Protection Agency Class V injection well compliance and remediation project. 20 (b) The unexpended and unobligated balance, not to exceed $2,000,000 of the 21 estimated balance of $3,447,682, of the appropriation made in sec. 10, ch. 29, SLA 2008, 22 page 76, lines 25 - 26 (Department of Transportation and Public Facilities, Glenn Highway rut 23 repairs - $11,500,000) is reappropriated to the Department of Transportation and Public 24 Facilities for the Environmental Protection Agency Class V injection well compliance and 25 remediation project. 26 (c) The unexpended and unobligated balance, not to exceed $10,000,000, of the 27 appropriation made in sec. 4, ch. 30, SLA 2007, page 105, line 27, and allocated on page 109, 28 lines 25 - 29 (Department of Transportation and Public Facilities, airport improvement 29 program, Ted Stevens Anchorage International Airport, roads, utilities and grounds 30 construction and upgrades - $10,559,362) is reappropriated to the Department of 31 Transportation and Public Facilities for terminal improvements and a renovation project at the

01 Ted Stevens Anchorage International Airport. 02 (d) The unexpended and unobligated balances, estimated to be a total of $2,513,100, 03 of the following appropriations are reappropriated to the Department of Transportation and 04 Public Facilities for the replacement of the Kalsin Bay maintenance station: 05 (1) sec. 1, ch. 82, SLA 2006, page 84, lines 28 - 29 (Department of 06 Transportation and Public Facilities, Bragaw to Airport Heights 6-lane - $3,500,000); 07 (2) sec. 1, ch. 82, SLA 2006, page 85, lines 25 - 27 (Department of 08 Transportation and Public Facilities, Farmers Loop, Chena Hotsprings multiple use trail - 09 $600,000); 10 (3) sec. 1, ch. 82, SLA 2006, page 107, line 12, and allocated on page 107, 11 lines 30 - 31, as amended by sec. 20(u), ch. 30, SLA 2007 (Department of Transportation and 12 Public Facilities, transportation initiative, Sterling Highway Mackie Lake intersection to 13 Soldotna rehabilitation and paving - $4,000,000); 14 (4) sec. 45(d), ch. 5, FSSLA 2011 (Anchorage, updates to the U-Med district 15 plan, a parking utilization study, and associated costs to manage the planning process); 16 (5) sec. 1, ch. 17, SLA 2012, page 134, line 22, and allocated on page 134, 17 lines 25 - 27, as amended by sec. 32(a), ch. 16, SLA 2013 (Department of Transportation and 18 Public Facilities, construction of sand storage building in the central region). 19 (e) The amount necessary for Dalton Highway disaster emergency repairs, not to 20 exceed $5,000,000, is appropriated from the general fund to the Department of Transportation 21 and Public Facilities for that purpose. 22 * Sec. 13. DEBT AND OTHER OBLIGATIONS. Section 25(k), ch. 16, SLA 2014, is 23 amended to read: 24 (k) The sum of $121,217,970 [$126,642,396] is appropriated to the 25 Department of Education and Early Development for state aid for costs of school 26 construction under AS 14.11.100 for the fiscal year ending June 30, 2015, from the 27 following sources: 28 General fund $ 101,917,970 29 [$107,342,396] 30 School Fund (AS 43.50.140) 19,300,000 31 * Sec. 14. RATIFICATIONS OF CERTAIN EXPENDITURES. The following

01 departmental expenditures are ratified to reverse the negative account balances in the Alaska 02 State Accounting System in the amount listed for the AR number. The appropriations from 03 which those expenditures were actually paid are amended by increasing those appropriations 04 for the fiscal year ending June 30, 2015, by the amount listed, as follows: 05 Department of Health and Social Services 06 (1) AR 23928-08 Medicaid School Based Admin Claim $3,272,240.61 07 (2) AR 23550-09 Senior and Disability Services Medicaid 3,299.38 08 Services 09 (3) AR 22812-10 Probation Services, Unbudgeted RSA 8,309.80 10 (4) AR 22820-10 Residential Child Care, Unbudgeted RSA 4,122.81 11 (5) AR 23301-10 Health Care Services Medicaid Services 30,067.24 12 (6) AR 23550-10 Senior and Disability Services Medicaid 524,858.88 13 Services 14 (7) AR 23847-10 Safety and Support Equipment for Public 30,662.63 15 Health Nurses, Probation Officers, and Social Workers 16 (8) AR 26116-12 Deferred Maintenance, Renovation, Repair, 11,004.00 17 and Equipment 18 (9) AR 26122-12 Replacement of the Public Health Center 15,224.27 19 and Pioneer Homes Telephone Systems 20 (10) AR 26123-12 Safety and Support Equipment for Public 11,225.20 21 Health Nurses, Probation Officers, and Social Workers 22 (11) AR 26220-12 MH Treatment and Recovery Based Special 15,000.00 23 Needs Housing 24 (12) AR 26347-13 MH Treatment and Recovery Based Special 15,000.00 25 Needs Housing 26 (13) AR 26117-14 E-Grants 4,587.00 27 (14) AR 26132-14 Denali Commission Grants for Health Care 2,620.80 28 Facility Improvements 29 (15) AR 26137-14 Master Client Index 280,336.35 30 Judiciary 31 (1) AR 76400-14 Commission on Judicial Conduct 11,000.00

01 * Sec. 15. ALASKA HOUSING CAPITAL CORPORATION. The unexpended and 02 unobligated balance, estimated to be $750,000, of the appropriation made in sec. 1, ch. 18, 03 SLA 2014, page 50, lines 20 - 22, (Department of Education and Early Development, Alaska 04 Digital Teaching Initiative three-year demonstration project - $4,000,000) is reappropriated to 05 the Alaska Housing Capital Corporation account. 06 * Sec. 16. FEDERAL AND OTHER PROGRAM RECEIPTS. (a) Federal receipts, 07 designated program receipts as defined in AS 37.05.146(b)(3), information services fund 08 program receipts as defined in AS 44.21.045(b), Exxon Valdez oil spill trust receipts as 09 defined in AS 37.05.146(b)(4), receipts of the Alaska Housing Finance Corporation, receipts 10 of the Alaska marine highway system fund as defined in AS 19.65.060(a), receipts of the 11 University of Alaska as described in AS 37.05.146(b)(2), receipts of commercial fisheries test 12 fishing operations defined in AS 37.05.146(c)(21), and receipts of the Alaska Aerospace 13 Corporation that are received during the fiscal year ending June 30, 2016, and that exceed the 14 amounts appropriated by this Act, are appropriated conditioned on compliance with the 15 program review provisions of AS 37.07.080(h). 16 (b) If federal or other program receipts under AS 37.05.146 and AS 44.21.045(b) that 17 are received during the fiscal year ending June 30, 2016, exceed the amounts appropriated by 18 this Act, the appropriations from state funds for the affected program shall be reduced by the 19 excess if the reductions are consistent with applicable federal statutes. 20 (c) If federal or other program receipts under AS 37.05.146 and 21 AS 44.21.045(b) that are received during the fiscal year ending June 30, 2016, fall 22 short of the amounts appropriated by this Act, the affected appropriation is 23 reduced by the amount of the shortfall in receipts. 24 * Sec. 17. INSURANCE CLAIMS. The amounts to be received in settlement of insurance 25 claims for losses and the amounts to be received as recovery for losses are appropriated from 26 the general fund to the 27 (1) state insurance catastrophe reserve account (AS 37.05.289(a)); or 28 (2) appropriate state agency to mitigate the loss. 29 * Sec. 18. NATIONAL PETROLEUM RESERVE - ALASKA IMPACT GRANT 30 PROGRAM. The amount received by the National Petroleum Reserve - Alaska special 31 revenue fund (AS 37.05.530(a)) under 42 U.S.C. 6506a(l) or former 42 U.S.C.

01 6508 by August 31, 2015, estimated to be $3,502,626, is appropriated from that 02 fund to the Department of Commerce, Community, and Economic Development 03 for capital project grants under the National Petroleum Reserve - Alaska impact 04 grant program to the following municipalities in the amounts stated: 05 MUNICIPALITY PROJECT ALLOCATION 06 (1) City of Barrow Local government operations $1,600,000 07 (2) City of Wainwright Retractable boat ramp 82,500 08 (3) City of Anaktuvuk Pass General operations and 348,872 09 renovations 10 (4) City of Atqasuk Local government and 147,070 11 youth program 12 (5) City of Nuiqsut Local government operations 680,352 13 and maintenance 14 (6) City of Wainwright Local government operations 473,964 15 (7) City of Nuiqsut Youth center operations 94,868 16 and maintenance 17 (8) City of Wainwright Youth program 22,000 18 (9) City of Wainwright City park fencing and lighting 53,000 19 * Sec. 19. COMMERCIAL VESSEL PASSENGER TAX ACCOUNT. The unexpended 20 and unobligated balances, estimated to be a total of $1,906,475, of the following 21 appropriations are reappropriated to the commercial vessel passenger tax account 22 (AS 43.52.230): 23 (1) sec. 4, ch. 15, SLA 2009, page 46, lines 15 - 17 (Wasilla, airport train 24 station improvements - $430,000), estimated balance of $326,475; 25 (2) sec. 4, ch. 15, SLA 2009, page 47, lines 11 - 12, and allocated on page 47, 26 lines 22 - 23 (Department of Transportation and Public Facilities, cruise ship-related projects, 27 Homer, Homer Spit pathway - $2,000,000), estimated balance of $830,000; 28 (3) sec. 4, ch. 15, SLA 2009, page 47, lines 11 - 12, and allocated on page 48, 29 lines 15 - 16, as amended by sec. 41(b), ch. 5, FSSLA 2011 (Department of Transportation 30 and Public Facilities, improve the pedestrian environment and access along Hazlet Drive in 31 Valdez and adjacent cruise ship dock upland areas and parks, which may include decorative

01 street lighting, interpretive signage, trails, benches, landscaping, or other aesthetic amenities), 02 estimated balance of $750,000. 03 * Sec. 20. DEPARTMENT OF COMMERCE, COMMUNITY, AND ECONOMIC 04 DEVELOPMENT. (a) The unexpended and unobligated balance, not to exceed $330,000 of 05 the estimated balance of $12,500,000, of the appropriation made in sec. 4, ch. 5, FSSLA 2011, 06 page 137, lines 21 - 23 (Department of Commerce, Community, and Economic Development, 07 AEA, Mount Spurr geothermal project development - $12,500,000) is reappropriated to the 08 Alaska Energy Authority for the electrical emergencies program. 09 (b) The unexpended and unobligated balances, not to exceed $9,512,659, remaining 10 after the appropriation made in (a) of this section, of the appropriation made in sec. 4, ch. 5, 11 FSSLA 2011, page 137, lines 21 - 23 (Department of Commerce, Community, and Economic 12 Development, AEA, Mount Spurr geothermal project development - $12,500,000) is 13 reappropriated to the renewable energy grant fund (AS 42.45.045). 14 (c) The sum of $75,000 is appropriated from the anatomical gift awareness fund 15 (AS 13.50.160) to the Department of Commerce, Community, and Economic Development 16 for payment as a grant under AS 37.05.316 to Life Alaska Donor Services for promoting the 17 donation program described in AS 13.50.150 for the fiscal year ending June 30, 2016. 18 * Sec. 21. DEPARTMENT OF EDUCATION AND EARLY DEVELOPMENT. (a) The 19 unexpended and unobligated balances, estimated to be a total of $10,867,503, of the 20 appropriations made in sec. 13, ch. 29, SLA 2008, page 136, lines 13 - 14, and allocated on 21 page 136, lines 17 - 18, as amended by secs. 26(a) and (b), ch. 5, FSSLA 2011, (Department 22 of Education and Early Development, school construction grant fund, Marshall K-12 school 23 replacement), and sec. 10, ch. 5, FSSLA 2011, page 149, lines 24 - 25, and allocated on page 24 149, lines 29 - 32 (Department of Education and Early Development, school construction 25 grant fund, Kuinerrarmiut Elitnaurviat K-12 school renovation/addition, Quinhagak - 26 $28,489,312) are reappropriated to the Department of Education and Early Development for 27 payment by the Department of Education and Early Development as grants under 28 AS 14.11.007 to the following recipients in the following amounts: 29 (1) Petersburg School District for boiler repair at the Petersburg Middle/High 30 School - $24,565; 31 (2) Yukon-Koyukuk School District for renovation at Andrew K. Demoski K-

01 12 school - $10,637,668; 02 (3) Nome City School District for district-wide lighting replacement - 03 $192,813; 04 (4) Lower Kuskokwim School District for replacement of boilers at the Bethel 05 campus - $2,636,146. 06 (b) If the amount available for reappropriation under (a)(1) - (4) of this section is less 07 than $13,491,192, then the reappropriations made by (a)(1) - (4) of this section shall be 08 reduced in proportion to the amount of the shortfall. 09 * Sec. 22. DEPARTMENT OF ENVIRONMENTAL CONSERVATION. (a) The 10 unexpended and unobligated balances, not to exceed $800,000 of the estimated total balance 11 of $3,201,258, of the following appropriations are reappropriated to the oil and hazardous 12 substance release prevention account (AS 46.08.010(a)(1)) in the oil and hazardous substance 13 release prevention and response fund (AS 46.08.010(a)): 14 (1) sec. 1, ch. 1, SSSLA 2002, page 35, lines 13 - 15, and allocated on page 15 36, lines 6 - 9 (Department of Environmental Conservation, municipal water, sewer and solid 16 waste matching grant projects, Ketchikan Shoreline Drive water and sewer analysis and 17 preliminary design - $140,000); 18 (2) sec. 1, ch. 3, FSSLA 2005, page 53, lines 20 - 22, and allocated on page 19 54, lines 12 - 14 (Department of Environmental Conservation, municipal water, sewer, and 20 solid waste matching grant projects, Palmer wastewater treatment plant upgrades phase 3 - 21 $250,000); 22 (3) sec. 4, ch. 30, SLA 2007, page 90, lines 8 - 9, and allocated on page 91, 23 lines 13 - 15 (Department of Environmental Conservation, water and wastewater 24 infrastructure projects, Ketchikan (City of), disinfection by-products reduction project - 25 $3,347,500); 26 (4) sec. 4, ch. 30, SLA 2007, page 90, lines 8 - 9, and allocated on page 92, 27 lines 8 - 9 (Department of Environmental Conservation, water and wastewater infrastructure 28 projects, Sitka, cove lift station replacement - $155,300); 29 (5) sec. 13, ch. 29, SLA 2008, page 139, lines 7 - 9, and allocated on page 30 139, lines 23 - 26 (Department of Environmental Conservation, municipal water, sewage, and 31 solid waste facilities grants, Juneau, East Valley reservoir/Jordan Creek rehabilitation project

01 - $419,175); 02 (6) sec. 13, ch. 29, SLA 2008, page 139, lines 7 - 9, and allocated on page 03 139, lines 27 - 29 (Department of Environmental Conservation, municipal water, sewage, and 04 solid waste facilities grants, Juneau, North Douglas sewer expansion phase III - $1,253,510); 05 (7) sec. 13, ch. 29, SLA 2008, page 139, lines 7 - 9, and allocated on page 06 139, line 33, through page 140, line 4 (Department of Environmental Conservation, municipal 07 water, sewage, and solid waste facilities grants, Kenai, new water transmission main phase II 08 wellhouse - $698,625); 09 (8) sec. 13, ch. 29, SLA 2008, page 139, lines 7 - 9, and allocated on page 10 140, lines 9 - 11 (Department of Environmental Conservation, municipal water, sewage, and 11 solid waste facilities grants, Kodiak, ultraviolet secondary water treatment facility - 12 $2,060,000); 13 (9) sec. 13, ch. 29, SLA 2008, page 139, lines 7 - 9, and allocated on page 14 140, lines 15 - 17 (Department of Environmental Conservation, municipal water, sewage, and 15 solid waste facilities grants, Palmer, Palmer southwest utility extension phase II - 16 $1,766,605); 17 (10) sec. 62, ch. 29, SLA 2008, and allocated on page 222, line 4 (Department 18 of Environmental Conservation, municipal water, sewage, and solid waste facilities grants, 19 Juneau, North Douglas sewer expansion phase 3 - $125,351); 20 (11) sec. 62, ch. 29, SLA 2008, and allocated on page 222, lines 5 - 6 21 (Department of Environmental Conservation, municipal water, sewage, and solid waste 22 facilities grants, Juneau, East Valley reservoir/Jordan Creek rehabilitation project - $41,918); 23 (12) sec. 62, ch. 29, SLA 2008, and allocated on page 222, lines 7 - 8 24 (Department of Environmental Conservation, municipal water, sewage, and solid waste 25 facilities grants, Kenai, new water transmission main phase 2 well house - $279,450); 26 (13) sec. 62, ch. 29, SLA 2008, and allocated on page 222, lines 11 - 12 27 (Department of Environmental Conservation, municipal water, sewage, and solid waste 28 facilities grants, Kodiak, ultraviolet secondary water treatment facility - $824,000); 29 (14) sec. 62, ch. 29, SLA 2008, and allocated on page 222, line 18 30 (Department of Environmental Conservation, municipal water, sewage, and solid waste 31 facilities grants, Palmer, southwest utility extension phase 2 - $706,642);

01 (15) sec. 1, ch. 15, SLA 2009, page 6, lines 25 - 27, and allocated on page 6, 02 lines 28 - 30 (Department of Environmental Conservation, municipal water, sewage, and solid 03 waste facilities grants, Anchorage, Girdwood wastewater treatment facility - $4,182,000); 04 (16) sec. 1, ch. 15, SLA 2009, page 6, lines 25 - 27, and allocated on page 7, 05 lines 7 - 10 (Department of Environmental Conservation, municipal water, sewage, and solid 06 waste facilities grants, Juneau, East Valley reservoir/Jordan Creek rehabilitation project - 07 $41,400); 08 (17) sec. 1, ch. 15, SLA 2009, page 6, lines 25 - 27, and allocated on page 7, 09 lines 11 - 13 (Department of Environmental Conservation, municipal water, sewage, and solid 10 waste facilities grants, Juneau, North Douglas sewer expansion, phase III - $123,165); 11 (18) sec. 1, ch. 15, SLA 2009, page 6, lines 25 - 27, and allocated on page 7, 12 lines 14 - 16 (Department of Environmental Conservation, municipal water, sewage, and solid 13 waste facilities grants, Juneau, North Douglas sewer expansion, phase IV - $1,804,560); 14 (19) sec. 1, ch. 15, SLA 2009, page 6, lines 25 - 27, and allocated on page 7, 15 lines 23 - 26 (Department of Environmental Conservation, municipal water, sewage, and solid 16 waste facilities grants, Kenai, new water transmission mains phase II and wellhouse - 17 $2,132,100); 18 (20) sec. 1, ch. 15, SLA 2009, page 6, lines 25 - 27, and allocated on page 7, 19 lines 27 - 29 (Department of Environmental Conservation, municipal water, sewage, and solid 20 waste facilities grants, Kenai, water treatment plant upgrades, phase III - $648,945); 21 (21) sec. 1, ch. 15, SLA 2009, page 6, lines 25 - 27, and allocated on page 7, 22 line 33, through page 8, line 5 (Department of Environmental Conservation, municipal water, 23 sewage, and solid waste facilities grants, Ketchikan, Tongass Avenue water and sewer 24 replacement, phase II - $1,691,260); 25 (22) sec. 7, ch. 43, SLA 2010, page 24, lines 4 - 6, and allocated on page 24, 26 lines 7 - 9 (Department of Environmental Conservation, municipal water, sewage, and solid 27 waste facilities grants, Anchorage, Girdwood wastewater treatment facility - $4,100,000); 28 (23) sec. 7, ch. 43, SLA 2010, page 24, lines 4 - 6, and allocated on page 25, 29 lines 14 - 16 (Department of Environmental Conservation, municipal water, sewage, and solid 30 waste facilities grants, North Slope Borough, Wainwright water and sewer upgrades - 31 $3,090,000);

01 (24) sec. 7, ch. 43, SLA 2010, page 24, lines 4 - 6, and allocated on page 25, 02 lines 27 - 29 (Department of Environmental Conservation, municipal water, sewage, and solid 03 waste facilities grants, Petersburg, water treatment upgrades, phase 3 - $253,697); 04 (25) sec. 1, ch. 5, FSSLA 2011, page 81, lines 27 - 29, and allocated on page 05 82, lines 5 - 6 (Department of Environmental Conservation, municipal water, sewage, and 06 solid waste facilities grants, Ketchikan, water and sewer main replacement - $2,616,824); 07 (26) sec. 1, ch. 5, FSSLA 2011, page 81, lines 27 - 29, and allocated on page 08 82, lines 16 - 17 (Department of Environmental Conservation, municipal water, sewage, and 09 solid waste facilities grants, Soldotna, well house B reconstruction - $717,255); 10 (27) sec. 1, ch. 17, SLA 2012, page 113, lines 30 - 32, and allocated on page 11 114, lines 5 - 6, as amended by sec. 14(b), ch. 18, SLA 2014 (Department of Environmental 12 Conservation, municipal water, sewage, and solid waste facilities grants, Haines, Barnett and 13 Tower Road water tank replacement and infrastructure improvements - $699,143); 14 (28) sec. 1, ch. 17, SLA 2012, page 113, lines 30 - 32, and allocated on page 15 114, lines 15 - 18 (Department of Environmental Conservation, municipal water, sewage, and 16 solid waste facilities grants, Kodiak, Aleutian homes water and sewer replacement phase 5 - 17 $1,339,000); 18 (29) sec. 1, ch. 17, SLA 2012, page 113, lines 30 - 32, and allocated on page 19 114, lines 19 - 21 (Department of Environmental Conservation, municipal water, sewage, and 20 solid waste facilities grants, Kodiak Island Borough, landfill lateral expansion phase 2 - 21 $3,090,000). 22 (30) sec. 1, ch. 17, SLA 2012, page 113, lines 30 - 32, and allocated on page 23 114, lines 25 - 27 (Department of Environmental Conservation, municipal water, sewage, and 24 solid waste facilities grants, North Pole, techite sewer main and manholes rehabilitation - 25 $2,590,450); 26 (31) sec. 1, ch. 17, SLA 2012, page 113, lines 30 - 32, and allocated on page 27 114, lines 28 - 30 (Department of Environmental Conservation, municipal water, sewage, and 28 solid waste facilities grants, North Slope Borough, Ahgeak Street water and sewer extension - 29 $3,090,000) 30 (32) sec. 1, ch. 17, SLA 2012, page 113, lines 30 - 32, and allocated on page 31 115, lines 4 - 6 (Department of Environmental Conservation, municipal water, sewage, and

01 solid waste facilities grants, Sitka, Baranof Street water and sewer replacement - $1,032,413); 02 (33) sec. 1, ch. 17, SLA 2012, page 113, lines 30 - 32, and allocated on page 03 115, lines 10 - 12 (Department of Environmental Conservation, municipal water, sewage, and 04 solid waste facilities grants, Soldotna, Sterling Street water and sewer replacement - 05 $377,465). 06 (b) The unexpended and unobligated balances, remaining after the appropriation 07 made in (a) of this section, of the appropriations listed in (a)(1) - (33) of this section are 08 reappropriated to the Department of Environmental Conservation for the Naknek sewer 09 relocation and system upgrade. 10 (c) If the amount available for appropriation under (a) and (b) of this section is less 11 than $3,201,258, then the reappropriations made in (a) and (b) of this section shall be reduced 12 in proportion to the amount of the shortfall. 13 * Sec. 23. DEPARTMENT OF HEALTH AND SOCIAL SERVICES. (a) Section 34(a), ch. 14 18, SLA 2014, is amended to read: 15 (a) The unexpended and unobligated general fund balance, not to exceed 16 $462,900 of the estimated balance of $2,000,000, of the appropriation made in sec. 17 5(c), ch. 10, SLA 2007 [SEC. 1, CH. 3, FSSLA 2005, PAGE 56, LINES 26 - 28] 18 (Department of Health and Social Services, Fairbanks virology laboratory completion 19 - $3,500,000 [REPLACEMENT - $24,200,000]) is reappropriated to the Department 20 of Health and Social Services, office of children's services, for safety enhancements to 21 offices, facilities, and equipment. 22 (b) Section 34(b), ch. 18, SLA 2014, is amended to read: 23 (b) The unexpended and unobligated general fund balance, not to exceed 24 $500,000 of the estimated balance of $2,000,000, of the appropriation made in sec. 25 5(c), ch. 10, SLA 2007 [SEC. 1, CH. 3, FSSLA 2005, PAGE 56, LINES 26 - 28] 26 (Department of Health and Social Services, Fairbanks virology laboratory completion 27 - $3,500,000 [REPLACEMENT - $24,200,000]) is reappropriated to the Department 28 of Health and Social Services for an emergency medical services match for the code 29 blue project. 30 (c) Section 34(c), ch. 18, SLA 2014, is amended to read: 31 (c) The unexpended and unobligated general fund balance, not to exceed

01 $80,325 of the estimated balance of $2,000,000, of the appropriation made in sec. 5(c), 02 ch. 10, SLA 2007 [SEC. 1, CH. 3, FSSLA 2005, PAGE 56, LINES 26 - 28] 03 (Department of Health and Social Services, Fairbanks virology laboratory completion 04 - $3,500,000 [REPLACEMENT - $24,200,000]) is reappropriated to the Department 05 of Health and Social Services for emergent and emergency projects, deferred 06 maintenance, renovation, and repair at facilities other than Alaska Pioneers' Homes 07 and for the purchase of equipment. 08 (d) Section 34(d), ch. 18, SLA 2014, is amended to read: 09 (d) The unexpended and unobligated general fund balance, not to exceed 10 $81,060 of the estimated balance of $2,000,000, of the appropriation made in sec. 5(c), 11 ch. 10, SLA 2007 [SEC. 1, CH. 3, FSSLA 2005, PAGE 56, LINES 26 - 28] 12 (Department of Health and Social Services, Fairbanks virology laboratory completion 13 - $3,500,000 [REPLACEMENT - $24,200,000]) is reappropriated to the Department 14 of Health and Social Services for emergent and emergency projects at the Alaska 15 Pioneers' Homes. 16 (e) Section 34(e), ch. 18, SLA 2014, is amended to read: 17 (e) The unexpended and unobligated general fund balance, after the 18 appropriations made in (a) - (d) of this section, not to exceed $850,000 of the 19 estimated balance of $2,000,000, of the appropriation made in sec. 5(c), ch. 10, SLA 20 2007 [SEC. 1, CH. 3, FSSLA 2005, PAGE 56, LINES 26 - 28] (Department of Health 21 and Social Services, Fairbanks virology laboratory completion - $3,500,000 22 [REPLACEMENT - $24,200,000]) is reappropriated to the Department of Health and 23 Social Services [COMMERCE, COMMUNITY, AND ECONOMIC 24 DEVELOPMENT] for payment as a grant [UNDER AS 37.05.315] to the 25 Municipality of Anchorage for the Alaska domestic violence and sexual assault 26 intervention program. 27 * Sec. 24. DEPARTMENT OF NATURAL RESOURCES. The unexpended and 28 unobligated balance, estimated to be $1,000,000, of the appropriation made in sec. 1, ch. 17, 29 SLA 2012, page 125, lines 27 - 28 (Department of Natural Resources, shale oil environmental 30 data - $1,000,000) is reappropriated to the Department of Natural Resources for unified 31 permit automation and document management.

01 * Sec. 25. DEPARTMENT OF PUBLIC SAFETY. The unexpended and unobligated 02 balances, estimated to be a total of $350,000, of the appropriations made in sec. 1, ch. 135, 03 SLA 2000, page 18, lines 28 - 29 (Department of Public Safety, video arraignments, phase 1 04 of 2 - $510,000) and sec. 7, ch. 43, SLA 2010, page 33, lines 10 - 12 (Department of Public 05 Safety, video judicial conference arraignment study - $100,000) are reappropriated to the 06 Department of Public Safety for state trooper video equipment and storage. 07 * Sec. 26. DEPARTMENT OF TRANSPORTATION AND PUBLIC FACILITIES. The 08 unexpended and unobligated general fund balance, not to exceed $10,000,000 of the estimated 09 balance of $22,000,000, of the appropriation made in sec. 7, ch. 17, SLA 2012, page 166, 10 lines 24 - 27 (Department of Military and Veterans' Affairs, Alaska Aerospace Corporation 11 construction of new medium lift launch pad - $30,000,000) is reappropriated to the 12 Department of Transportation and Public Facilities for Alaska marine highway system vessel 13 overhaul and rehabilitation. 14 * Sec. 27. HOUSE DISTRICTS 29 - 31. The unexpended and unobligated balance, 15 estimated to be $530,000, of the appropriation made in sec. 1, ch. 17, SLA 2012, page 121, 16 lines 12 - 13 (Department of Labor and Workforce Development, Third Avenue dormitory 17 replacement - $16,075,000) is reappropriated to the Department of Labor and Workforce 18 Development for the refreshment of technology at the Alaska Vocational Technical Center. 19 * Sec. 28. HOUSE DISTRICTS 33 - 36. The unexpended and unobligated balance, not to 20 exceed $250,000 of the estimated balance of $500,000, of the appropriation made in sec. 21 30(8), ch. 159, SLA 2004 (Department of Transportation and Public Facilities, Coffman 22 Cove/Wrangell/Petersburg ferries and ferry facilities - $2,500,000) is reappropriated to the 23 Department of Commerce, Community, and Economic Development for payment as a grant 24 under AS 37.05.316 to the Inter-Island Ferry Authority for operating costs for daily service 25 between Ketchikan and Prince of Wales Island for the fiscal years ending June 30, 2016, and 26 June 30, 2017. 27 * Sec. 29. OFFICE OF THE GOVERNOR. The unexpended and unobligated general fund 28 balances, estimated to be a total of $900,000, of the appropriations made in sec. 1, ch. 16, 29 SLA 2014, page 41, line 26 (Office of the Governor, commissions/special offices - 30 $2,550,700), sec. 1, ch. 16, SLA 2014, page 41, line 28 (Office of the Governor, executive 31 operations - $18,581,600), sec. 1, ch. 16, SLA 2014, page 42, lines 8 - 9 (Office of the

01 Governor, Office of the Governor state facilities rent - $1,171,800), sec. 1, ch. 16, SLA 2014, 02 page 42, line 13 (Office of the Governor, office of management and budget - $2,682,800), and 03 sec. 1, ch. 16, SLA 2014, page 42, line 16 (Office of the Governor, elections - $7,762,000) are 04 reappropriated to the Office of the Governor for Arctic policy leadership and economic 05 development projects, including oil and gas development. 06 * Sec. 30. REAPPROPRIATION OF LEGISLATIVE APPROPRIATIONS. The 07 unexpended and unobligated balance, estimated to be $211,401, of the appropriation made in 08 sec. 1, ch. 18, SLA 2014, page 80, lines 5 - 6 (Legislature, Alaska Arctic Policy Commission - 09 $403,272) is reappropriated to the Alaska Legislature, Legislative Council, council and 10 subcommittees, Senate Special Committee on the Arctic, for work conducted in the Twenty- 11 Ninth Alaska State Legislature for the fiscal years ending June 30, 2015, and June 30, 2016. 12 * Sec. 31. SHARED TAXES AND FEES. (a) Section 31(a), ch. 16, SLA 2014, is amended 13 to read: 14 (a) The amount necessary to refund to local governments and other entities 15 their share of taxes and fees collected in the listed fiscal years under the following 16 programs is appropriated from the general fund to the Department of Revenue for 17 payment to local governments and other entities in the fiscal year ending June 30, 18 2015: 19 FISCAL YEAR ESTIMATED 20 REVENUE SOURCE COLLECTED AMOUNT 21 Fisheries business tax (AS 43.75) 2014 $25,400,000 22 Fishery resource landing tax (AS 43.77) 2014 6,700,000 23 [AVIATION FUEL TAX (AS 43.40.010) 2015 200,000] 24 Electric and telephone cooperative tax 2015 4,100,000 25 (AS 10.25.570) 26 Liquor license fee (AS 04.11) 2015 900,000 27 Cost recovery fisheries (AS 16.10.455) 2015 1,500,000 28 (b) Section 31, ch. 16, SLA 2014, is amended by adding a new subsection to read: 29 (c) The amount necessary, estimated to be $200,000, to refund to local 30 governments their share of an aviation fuel tax or surcharge under AS 43.40 for the 31 fiscal year ending June 30, 2015, is appropriated from the proceeds of the aviation fuel

01 tax or surcharge levied under AS 43.40 to the Department of Revenue for that 02 purpose. 03 * Sec. 32. ALASKA HOUSING CAPITAL CORPORATION. (a) The unexpended and 04 unobligated balance, remaining after the appropriations made in sec. 20(a) and (b) of this Act, 05 of the appropriation made in sec. 4, ch. 5, FSSLA 2011, page 137, lines 21 - 23 (Department 06 of Commerce, Community, and Economic Development, AEA, Mount Spurr geothermal 07 project development - $12,500,000) is reappropriated to the Alaska Housing Capital 08 Corporation account. 09 (b) The unexpended and unobligated general fund balance, estimated to be 10 $22,000,000, after the appropriation made in sec. 26 of this Act, of the appropriation made in 11 sec. 7, ch. 17, SLA 2012, page 166, lines 24 - 27 (Department of Military and Veterans' 12 Affairs, Alaska Aerospace Corporation construction of new medium lift launch pad - 13 $30,000,000) is reappropriated to the Alaska Housing Capital Corporation account. 14 (c) The unexpended and unobligated balance, estimated to be $45,000,000, of the 15 appropriation made in sec. 26(b), ch. 16, SLA 2013 (Department of Commerce, Community, 16 and Economic Development, Alaska Industrial Development and Export Authority, advance 17 the use of North Slope natural gas for a liquefied natural gas production and distribution 18 system) is reappropriated to the Alaska Housing Capital Corporation account. 19 (d) The unexpended and unobligated balance, estimated to be $500,000, after the 20 appropriation made in sec. 28 of this Act, of the appropriation made in sec. 30(8), ch. 159, 21 SLA 2004 (Department of Transportation and Public Facilities, Coffman 22 Cove/Wrangell/Petersburg ferries and ferry facilities - $2,500,000) is reappropriated to the 23 Alaska Housing Capital Corporation account. 24 (e) The unexpended and unobligated general fund balances, estimated to be a total of 25 $33,921,337, of the following appropriations are reappropriated to the Alaska Housing 26 Capital Corporation account: 27 (1) sec. 1, ch. 61, SLA 2001, page 20, lines 31 - 32 (Department of Military 28 and Veterans' Affairs, Bethel readiness center planning and design - $750,000), estimated 29 balance of $97,500; 30 (2) sec. 1, ch. 61, SLA 2001, page 25, lines 14 - 15 (Department of 31 Transportation and Public Facilities, safety inspection of state owned high risk facilities -

01 $200,000), estimated balance of $82,648; 02 (3) sec. 75(b), ch. 1, SSSLA 2002 (Department of Transportation and Public 03 Facilities, installation of a prototype weather station in a severe high altitude location known 04 to generate avalanches in Eagle River), estimated balance of $50,000; 05 (4) sec. 1, ch. 82, SLA 2003, page 35, lines 11 - 13 (Department of 06 Transportation and Public Facilities, facilities deferred maintenance and critical repairs - 07 $800,000), estimated balance of $4,635; 08 (5) sec. 1, ch. 82, SLA 2003, page 36, line 27, and allocated on page 37, lines 09 13 - 14 (Department of Transportation and Public Facilities, statewide federal programs, 10 highway safety grants program - $1,885,000), estimated balance of $30,974; 11 (6) sec. 1, ch. 3, FSSLA 2005, page 59, lines 9 - 11 (Department of Military 12 and Veterans' Affairs, Military Youth Academy dining facility renovation and repair - 13 $225,000), estimated balance of $40,500; 14 (7) sec. 1, ch. 3, FSSLA 2005, page 67, lines 3 - 5 (Department of 15 Transportation and Public Facilities, Corps of Engineers, harbors program construction - 16 $2,600,000), estimated balance of $980; 17 (8) sec. 4, ch. 3, FSSLA 2005, page 97, lines 20 - 21, and allocated on page 18 97, line 26 (Department of Transportation and Public Facilities, congestion, mitigation and 19 safety initiative, Dowling Road East - $19,000,000), estimated balance of $349,759; 20 (9) sec. 4, ch. 3, FSSLA 2005, page 97, lines 20 - 21, and allocated on page 21 97, line 31, through page 98, line 3 (Department of Transportation and Public Facilities, 22 congestion, mitigation and safety initiative, Fairbanks, Cartright Road extension - 23 $3,650,000), estimated balance of $268,649; 24 (10) sec. 4, ch. 3, FSSLA 2005, page 97, lines 20 - 21, and allocated on page 25 98, lines 10 - 11 (Department of Transportation and Public Facilities, congestion, mitigation 26 and safety initiative, Glenn Highway corridor - $30,500,000), estimated balance of $106,269; 27 (11) sec. 4, ch. 3, FSSLA 2005, page 97, lines 20 - 21, and allocated on page 28 98, lines 23 - 26 (Department of Transportation and Public Facilities, congestion, mitigation 29 and safety initiative, Matanuska-Susitna Borough, upgrade Old Glenn Highway, Plumley 30 Road to City of Palmer - $6,000,000), estimated balance of $3,383; 31 (12) sec. 4, ch. 3, FSSLA 2005, page 97, lines 20 - 21, and allocated on page

01 98, lines 30 - 32 (Department of Transportation and Public Facilities, congestion, mitigation 02 and safety initiative, Sitka, Rocky Guitierrez Airport access improvements - $3,500,000), 03 estimated balance of $70,855; 04 (13) sec. 4, ch. 3, FSSLA 2005, page 97, lines 20 - 21, and allocated on page 05 99, lines 4 - 7 (Department of Transportation and Public Facilities, congestion, mitigation and 06 safety initiative, Veteran's Memorial Highway/Eagle River High School traffic control and 07 turn lanes - $650,000), estimated balance of $250,000; 08 (14) sec. 1, ch. 82, SLA 2006, page 71, lines 16 - 18 (Department of Fish and 09 Game, Mendenhall wetlands accreted lands purchase - $80,000), estimated balance of 10 $80,000; 11 (15) sec. 1, ch. 82, SLA 2006, page 73, lines 22 - 23 (Department of Health 12 and Social Services, Ketchikan Pioneer Home roof replacement - $532,000), estimated 13 balance of $7,673; 14 (16) sec. 1, ch. 82, SLA 2006, page 74, lines 3 - 4 (Department of Health and 15 Social Services, revenue management and cost allocation system - $471,600), estimated 16 balance of $10,000; 17 (17) sec. 1, ch. 82, SLA 2006, page 87, lines 19 - 20 (Department of 18 Transportation and Public Facilities, Togiak dust and break-up control - $500,000), estimated 19 balance of $135,951; 20 (18) sec. 1, ch. 82, SLA 2006, page 87, lines 21 - 22 (Department of 21 Transportation and Public Facilities, Vine Road intersection, Parks Highway - $500,000), 22 estimated balance of $3,710; 23 (19) sec. 1, ch. 82, SLA 2006, page 87, lines 23 - 24 (Department of 24 Transportation and Public Facilities, Wasilla substandard road repairs - $1,000,000), 25 estimated balance of $44,153; 26 (20) sec. 1, ch. 82, SLA 2006, page 107, line 12, and allocated on page 108, 27 lines 7 - 8 (Department of Transportation and Public Facilities, transportation initiative, Parks 28 Highway (MP 185-192) - $2,500,000), estimated balance of $265,675; 29 (21) sec. 1, ch. 30, SLA 2007, page 78, line 33, through page 79, line 5 30 (Department of Transportation and Public Facilities, Parks Highway and Vine Road 31 intersection, traffic signal installation - $350,000), estimated balance of $58,613;

01 (22) sec. 4, ch. 30, SLA 2007, page 99, lines 23 - 24 (Department of Natural 02 Resources, petroleum systems integrity office contracts - $500,000), estimated balance of 03 $227,900; 04 (23) sec. 29(2), ch. 30, SLA 2007 (insurance claims, appropriate state agency 05 to mitigate the loss), estimated balance of $60,000; 06 (24) sec. 42(i), ch. 30, SLA 2007 (Department of Transportation and Public 07 Facilities, grinding and repavement of Beaver Loop, Gaswell Road, Funny River Road, and 08 Sterling Highway from Mackie Lake intersection to Soldotna), estimated balance of 09 $974,787; 10 (25) sec. 7, ch. 29, SLA 2008, page 17, lines 25 - 28 (Southeast Conference, 11 Kake-Petersburg intertie permitting, design, and construction - $500,000); 12 (26) sec. 7, ch. 29, SLA 2008, page 19, lines 10 - 13 (Anchorage, 11th Avenue 13 road upgrade, Muldoon Road to Boston Street - $500,000); 14 (27) sec. 10, ch. 29, SLA 2008, page 32, lines 9 - 11 (Department of 15 Administration, AOGCC reservoir depletion studies prior to major gas sales - $1,500,000), 16 estimated balance of $1,200,000; 17 (28) sec. 10, ch. 29, SLA 2008, page 33, lines 7 - 8, and allocated on page 34, 18 lines 4 - 6 (Department of Administration, facility deferred maintenance, state museum 19 deferred maintenance project - $100,000), estimated balance of $4,529; 20 (29) sec. 10, ch. 29, SLA 2008, page 61, lines 11 - 12 (Port Heiden, grader and 21 dozer - $300,000), estimated balance of $10,599; 22 (30) sec. 10, ch. 29, SLA 2008, page 62, lines 3 - 4 (Unalaska, geothermal 23 exploration - $1,500,000); 24 (31) sec. 10, ch. 29, SLA 2008, page 62, lines 27 - 28 (Karluk, playground 25 equipment - $25,000); 26 (32) sec. 10, ch. 29, SLA 2008, page 69, lines 22 - 23, and allocated on page 27 69, lines 29 - 33 (Department of Military and Veterans' Affairs, statewide facility deferred 28 maintenance, Alcantra armory (Wasilla), roof replacement and painting, security installation, 29 and equipment - $1,370,000), estimated balance of $51,303; 30 (33) sec. 10, ch. 29, SLA 2008, page 77, lines 14 - 16 (Department of 31 Transportation and Public Facilities, Kalifornsky Beach Road, pedestrian pathway -

01 $1,100,000), estimated balance of $216,265; 02 (34) sec. 10, ch. 29, SLA 2008, page 79, lines 3 - 4 (Department of 03 Transportation and Public Facilities, surfacing materials - $1,000,000), estimated balance of 04 $2,748; 05 (35) sec. 10, ch. 29, SLA 2008, page 79, lines 5 - 7, as amended by sec. 37(c) - 06 (j), ch. 17, SLA 2012, (Department of Transportation and Public Facilities, Tustumena Lake, 07 Crooked Creek and Johnson Lake Roads paving), estimated balance of $135,574; 08 (36) sec. 13, ch. 29, SLA 2008, page 89, lines 23 - 26 (Alaska Native Tribal 09 Health Consortium, Anchorage long term care facility - $7,500,000); 10 (37) sec. 13, ch. 29, SLA 2008, page 103, lines 3 - 4 (Akiak, Village Police 11 Safety Building - $400,000); 12 (38) sec. 13, ch. 29, SLA 2008, page 127, lines 27 - 29 (Larsen Bay, repair 13 and resurface of existing community roads - $100,000), estimated balance of $81,058; 14 (39) sec. 13, ch. 29, SLA 2008, page 132, lines 14 - 16 (Teller, Teller 15 community health clinic completion - $210,000), estimated balance of $37,625; 16 (40) sec. 13, ch. 29, SLA 2008, page 158, lines 21 - 22, as amended by sec. 17 14(b), ch. 14, SLA 2009 (Department of Transportation and Public Facilities, bridge repair 18 and upgrade - $49,600), estimated balance of $29,416; 19 (41) sec. 13, ch. 29, SLA 2008, page 159, lines 23 - 25 (Department of 20 Transportation and Public Facilities, sidewalk snow removal equipment for state roads - 21 $1,250,840), estimated balance of $49,743; 22 (42) sec. 1(a), ch. 1, 4SSLA 2008 (Alaska Gasline Inducement Act 23 reimbursement fund, natural gas pipeline project construction inducement under 24 AS 43.90.110(a)(1) - $30,000,000); 25 (43) sec. 14(d), ch. 15, SLA 2009 (Alaska Gasline Inducement Act 26 reimbursement fund, natural gas pipeline project construction inducement under 27 AS 43.90.110(a)(1) - $15,000,000); 28 (44) sec. 7, ch. 43, SLA 2010, page 18, lines 12 - 14 (Department of 29 Administration, Alaska Public Offices Commission electronic filing system - $600,000), 30 estimated balance of $79,906; 31 (45) sec. 7, ch. 43, SLA 2010, page 19, lines 30 - 32 (Department of

01 Commerce, Community, and Economic Development, Denali Commission federal-state 02 partnership grant - $3,000,000), estimated balance of $1,360,000; 03 (46) sec. 7, ch. 43, SLA 2010, page 24, lines 4 - 6, and allocated on page 24, 04 lines 30 - 32 (Department of Environmental Conservation, municipal water, sewage, and solid 05 waste facilities grants, Ketchikan, Baranof reservoir replacement - $1,968,330); 06 (47) sec. 7, ch. 43, SLA 2010, page 24, lines 4 - 6, and allocated on page 25, 07 lines 27 - 29 (Department of Environmental Conservation, municipal water, sewage, and solid 08 waste facilities grants, Petersburg, water treatment upgrades, phase 3 - $253,697); 09 (48) sec. 10, ch. 43, SLA 2010, page 64, lines 24 - 26 (Anchorage, Arctic 10 Boulevard Chester Creek flooding - $150,000), estimated balance of $44,311; 11 (49) sec. 10, ch. 43, SLA 2010, page 65, lines 25 - 27 (Anchorage, Begich 12 Middle School lighting for track and field - $200,000); 13 (50) sec. 10, ch. 43, SLA 2010, page 66, lines 5 - 7 (Anchorage, Birch Road 14 rut repair, Abbot Road to O'Malley Road - $100,000), estimated balance of $7,259; 15 (51) sec. 10, ch. 43, SLA 2010, page 69, lines 9 - 11 (Anchorage, Creekside 16 Park Elementary sidewalk repairs - $6,200); 17 (52) sec. 10, ch. 43, SLA 2010, page 71, lines 25 - 27 (Anchorage, 18 Goldenview Middle School cabinet installation - $15,000), estimated balance of $3,983; 19 (53) sec. 10, ch. 43, SLA 2010, page 72, lines 12 - 14 (Anchorage, Huffman 20 Road subdrain extension - $50,000), estimated balance of $49,000; 21 (54) sec. 10, ch. 43, SLA 2010, page 74, line 33, through page 75, line 5 22 (Anchorage, Lake Otis Parkway at Abbott Loop Elementary School flashing lights - $75,000), 23 estimated balance of $19,384; 24 (55) sec. 10, ch. 43, SLA 2010, page 75, lines 6 - 10 (Anchorage, Lake Otis 25 Parkway pedestrian safety, 20th Avenue to Northern Lights Boulevard - $250,000), estimated 26 balance of $79,890; 27 (56) sec. 10, ch. 43, SLA 2010, page 75, lines 22 - 24 (Anchorage, Meadow 28 Street to Petersburg Street drainage - $1,620,000); 29 (57) sec. 10, ch. 43, SLA 2010, page 80, lines 15 - 17 (Anchorage, Rainbow 30 Avenue drainage, east of Gregory Road - $50,000), estimated balance of $4,874; 31 (58) sec. 10, ch. 43, SLA 2010, page 82, lines 20 - 22 (Anchorage, Stellar

01 Secondary School computer lab wiring - $20,000); 02 (59) sec. 10, ch. 43, SLA 2010, page 86, lines 24 - 25 (Angoon, barge landing 03 - $150,000); 04 (60) sec. 10, ch. 43, SLA 2010, page 86, line 29 (Angoon, fire truck - 05 $200,000); 06 (61) sec. 10, ch. 43, SLA 2010, page 108, lines 8 - 9 (Wasilla, Lake Lucille 07 improvements - $125,000), estimated balance of a $32,160; 08 (62) sec. 10, ch. 43, SLA 2010, page 111, lines 7 - 9 (Manley Hot Springs, 09 new health clinic project - $150,000), estimated balance of $57,877; 10 (63) sec. 13, ch. 43, SLA 2010, page 116, lines 16 - 19 (Alaska Disabled 11 Veterans Sports Program, Inc., state participation grant - $100,000), estimated balance of 12 $34,295; 13 (64) sec. 13, ch. 43, SLA 2010, page 116, lines 26 - 30 (Alaska Fire Chiefs 14 Association, Inc., Alaska marine firefighter training for land-based firefighters - $150,000); 15 (65) sec. 13, ch. 43, SLA 2010, page 124, lines 17 - 21 (Catholic Community 16 Service, Inc., Bring the Kids Home Program site acquisition and building design - $125,000); 17 (66) sec. 13, ch. 43, SLA 2010, page 134, lines 15 - 18 (Juneau Housing Trust, 18 Inc., 20th Century Theater affordable housing project - $55,000); 19 (67) sec. 13, ch. 43, SLA 2010, page 141, lines 17 - 20 (Southeast Alaska 20 Guidance Association, Eagle Valley training center repair and maintenance - $57,000), 21 estimated balance of $2,143; 22 (68) sec. 23(a), ch. 43, SLA 2010 (Alaska Gasline Inducement Act 23 reimbursement fund, natural gas pipeline project construction inducement under 24 AS 43.90.110(a)(1) - $140,000,000); 25 (69) sec. 46(f), ch. 43, SLA 2010 (Wasilla, improvements to Swanson Avenue 26 and Nelson Avenue); 27 (70) sec. 1, ch. 5, FSSLA 2011, page 17, lines 7 - 9, as amended by secs. 39(j) 28 - (l), ch. 18, SLA 2014 (Anchorage, Mountain Air Road Hillside Drive extension); 29 (71) sec. 1, ch. 5, FSSLA 2011, page 33, lines 23 - 24 (Kaltag, new clinic 30 match funding - $150,000); 31 (72) sec. 1, ch. 5, FSSLA 2011, page 43, lines 29 - 30 (Wasilla, airport access

01 road - $3,100,000); 02 (73) sec. 1, ch. 5, FSSLA 2011, page 84, lines 25 - 27 (Department of Health 03 and Social Services, electronic benefit transfer system equipment - $50,000), estimated 04 balance of $30,087; 05 (74) sec. 1, ch. 5, FSSLA 2011, page 87, lines 30 - 32 (Department of Military 06 and Veterans' Affairs, catastrophic disaster response planning and equipment - $4,980,000), 07 estimated balance of $929,251; 08 (75) sec. 1, ch. 5, FSSLA 2011, page 89, lines 5 - 7, and allocated on page 89, 09 lines 20 - 22 (Department of Military and Veterans' Affairs, Military and Veterans' Affairs 10 deferred maintenance projects, Fort Richardson, Camp Carroll armory deferred maintenance - 11 $1,090,000), estimated balance of $175,000; 12 (76) sec. 1, ch. 5, FSSLA 2011, page 89, lines 5 - 7, and allocated on page 89, 13 lines 32 - 33 (Department of Military and Veterans' Affairs, Military and Veterans' Affairs 14 deferred maintenance projects, Kotzebue armory deferred maintenance - $55,000), estimated 15 balance of $55,000; 16 (77) sec. 1, ch. 5, FSSLA 2011, page 89, lines 5 - 7, and allocated on page 90, 17 lines 3 - 4 (Department of Military and Veterans' Affairs, Military and Veterans' Affairs 18 deferred maintenance projects, Koyukuk armory deferred maintenance - $40,000), estimated 19 balance of $10,000; 20 (78) sec. 1, ch. 5, FSSLA 2011, page 89, lines 5 - 7, and allocated on page 90, 21 lines 9 - 10 (Department of Military and Veterans' Affairs, Military and Veterans' Affairs 22 deferred maintenance projects, Nome armory deferred maintenance - $950,000), estimated 23 balance of $18,517; 24 (79) sec. 1, ch. 5, FSSLA 2011, page 101, lines 15 - 17, and allocated on page 25 101, lines 21 - 24 (Department of Transportation and Public Facilities, Alaska marine 26 highway system, Ward Cove lay-up improvements, feasibility study, joint moorage facility 27 for AMHS ferries and NOAA research vessels - $500,000), estimated balance of $1,155; 28 (80) sec. 13, ch. 5, FSSLA 2011, page 154, lines 18 - 20 (Department of 29 Transportation and Public Facilities, Ketchikan, court office building elevators controls - 30 $120,000), estimated balance of $47,114; 31 (81) sec. 19(a), ch. 5, FSSLA 2011 (Alaska Gasline Inducement Act

01 reimbursement fund, natural gas pipeline project construction inducement under 02 AS 43.90.110(a)(1) - $60,000,000); 03 (82) sec. 35(f), ch. 5, FSSLA 2011 (Department of Transportation and Public 04 Facilities, Johns Road upgrade and reconstruction from Klatt Road to High View Drive), 05 estimated balance of $189,172; 06 (83) sec. 1, ch. 17, SLA 2012, page 28, lines 16 - 19 (Ketchikan Gateway 07 Borough, South Tongass Volunteer Fire Department emergency generator - $234,000); 08 (84) sec. 1, ch. 17, SLA 2012, page 29, lines 17 - 19 (Kotzebue, Cape 09 Blossom Road and deep water port - $4,600,000), estimated balance of $4,100,000; 10 (85) sec. 1, ch. 17, SLA 2012, page 39, lines 12 - 14 (Soldotna, police 11 building roof replacement - $325,000); 12 (86) sec. 1, ch. 17, SLA 2012, page 76, lines 9 - 13 (Catholic Community 13 Service, Bring the Kids Home Program site acquisition and building design - $300,000); 14 (87) sec. 1, ch. 17, SLA 2012, page 87, lines 20 - 23 (Hydaburg Cooperative 15 Association, Hydaburg harbor clean up and search and rescue vessel - $818,682); 16 (88) sec. 1, ch. 17, SLA 2012, page 122, lines 17 - 18 (Department of Military 17 and Veterans' Affairs, statewide emergency food supplies - $4,860,000), estimated balance of 18 $4,860,000; 19 (89) sec. 1, ch. 17, SLA 2012, page 122, lines 19 - 21, and allocated on page 20 122, lines 24 - 25 (Department of Military and Veterans' Affairs, deferred maintenance, 21 renewal, repair and equipment, Bethel armory deferred maintenance - $340,000), estimated 22 balance of $60,000; 23 (90) sec. 1, ch. 17, SLA 2012, page 122, lines 19 - 21, and allocated on page 24 123, lines 6 - 7 (Department of Military and Veterans' Affairs, deferred maintenance, renewal, 25 repair and equipment, Juneau armory deferred maintenance - $514,500), estimated balance of 26 $56,904; 27 (91) sec. 1, ch. 17, SLA 2012, page 122, lines 19 - 21, and allocated on page 28 123, lines 8 - 9 (Department of Military and Veterans' Affairs, deferred maintenance, renewal, 29 repair and equipment, Kenai armory deferred maintenance - $20,000), estimated balance of 30 $10,000; 31 (92) sec. 1, ch. 17, SLA 2012, page 122, lines 19 - 21, and allocated on page

01 123, lines 12 - 13 (Department of Military and Veterans' Affairs, deferred maintenance, 02 renewal, repair and equipment, Kodiak armory deferred maintenance - $20,000), estimated 03 balance of $10,000; 04 (93) sec. 1, ch. 17, SLA 2012, page 122, lines 19 - 21, and allocated on page 05 123, lines 16 - 17 (Department of Military and Veterans' Affairs, deferred maintenance, 06 renewal, repair and equipment, Wrangell armory deferred maintenance - $125,000), estimated 07 balance of $62,500; 08 (94) sec. 1, ch. 17, SLA 2012, page 132, lines 12 - 15 (Department of 09 Transportation and Public Facilities, Anchorage, Johns Road and Klatt Road intersection 10 design and build - $4,000,000), estimated balance of $1,800,000; 11 (95) sec. 1, ch. 17, SLA 2012, page 135, lines 20 - 21, and allocated on page 12 136, lines 3 - 4 (Department of Transportation and Public Facilities, municipal harbor facility 13 grant fund, Seward, Seward harbor - $1,180,000), estimated balance of $13,849; 14 (96) sec. 15(a), ch. 17, SLA 2012 (Alaska Gasline Inducement Act 15 reimbursement fund, natural gas pipeline project construction inducement under 16 AS 43.90.110(a)(1) - $60,000,000); 17 (97) sec. 27(c), ch. 17, SLA 2012 (Department of Transportation and Public 18 Facilities, replacement of the Seward Highway maintenance station), estimated balance of 19 $23,624; 20 (98) sec. 32(c), ch. 17, SLA 2012 (Alaska Railroad Corporation, Tanana River 21 bridge access for military training grounds and river training), estimated balance of 22 $1,000,000; 23 (99) sec. 1, ch. 16, SLA 2013, page 66, lines 24 - 26 (Department of Health 24 and Social Services, transitional housing apartment renovation - $65,000), estimated balance 25 of $65,000; 26 (100) sec. 1, ch. 16, SLA 2013, page 69, lines 23 - 24, and allocated on page 27 69, lines 27 - 28 (Department of Military and Veterans' Affairs, Army Guard facilities 28 projects, Alcantra, design and site planning - $60,000), estimated balance of $60,000; 29 (101) sec. 1, ch. 16, SLA 2013, page 69, lines 23 - 24, and allocated on page 30 69, lines 32 - 33 (Department of Military and Veterans' Affairs, Army Guard facilities 31 projects, Delta Junction, readiness center - $500,000), estimated balance of $500,000;

01 (102) sec. 1, ch. 16, SLA 2013, page 69, lines 23 - 24, and allocated on page 02 70, lines 3 - 4 (Department of Military and Veterans' Affairs, Army Guard facilities projects, 03 Dillingham, readiness center - $500,000), estimated balance of $500,000; 04 (103) sec. 1, ch. 16, SLA 2013, page 69, lines 23 - 24, and allocated on page 05 70, lines 7 - 8 (Department of Military and Veterans' Affairs, Army Guard facilities projects, 06 Fairbanks, design new readiness center - $650,000), estimated balance of $650,000; 07 (104) sec. 21(a), ch. 16, SLA 2013 (Alaska Gasline Inducement Act 08 reimbursement fund, natural gas pipeline project construction inducement under 09 AS 43.90.110(a)(1) - $25,000,000); 10 (105) sec. 1, ch. 18, SLA 2014, page 50, lines 20 - 22 (Department of 11 Education and Early Development, Alaska digital teaching initiative three-year demonstration 12 project - $4,000,000); 13 (106) sec. 1, ch. 18, SLA 2014, page 56, line 3, and allocated on page 56, lines 14 6 - 8 (Department of Military and Veterans' Affairs, armory facilities projects, Joint Base 15 Elmendorf Richardson facilities projects - $2,350,000), estimated balance of $120,000; 16 (107) sec. 18(b), ch. 18, SLA 2014 (Department of Military and Veterans' 17 Affairs, covered storage for the 168th Wing at Eielson Air Force Base), estimated balance of 18 $195,000. 19 * Sec. 33. CONSTITUTIONAL BUDGET RESERVE FUND. (a) If the unrestricted state 20 revenue available for appropriation in fiscal year 2015 is insufficient to cover the general fund 21 appropriations that take effect in fiscal year 2015, the amount necessary to balance revenue 22 and general fund appropriations is appropriated to the general fund from the budget reserve 23 fund (art. IX, sec. 17, Constitution of the State of Alaska). 24 (b) If the unrestricted state revenue available for appropriation in fiscal year 2016 is 25 insufficient to cover the general fund appropriations that take effect in fiscal year 2016, the 26 amount necessary to balance revenue and general fund appropriations is appropriated to the 27 general fund from the budget reserve fund (art. IX, sec. 17, Constitution of the State of 28 Alaska). 29 (c) The unrestricted interest earned on investment of general fund balances for the 30 fiscal years ending June 30, 2015, and June 30, 2016, is appropriated to the budget reserve 31 fund (art. IX, sec. 17, Constitution of the State of Alaska). The appropriation made in this

01 subsection is intended to compensate the budget reserve fund (art. IX, sec. 17, Constitution of 02 the State of Alaska) for any lost earnings caused by use of the fund's balance to permit 03 expenditure of operating and capital appropriations in the fiscal years ending June 30, 2015, 04 and June 30, 2016, in anticipation of receiving unrestricted general fund revenue. 05 (d) The appropriations made in (a) and (b) of this section are made under art. IX, sec. 06 17(c), Constitution of the State of Alaska. 07 * Sec. 34. REPEALS. (a) Section 28(f), ch. 16, SLA 2014, is repealed. 08 (b) Sections 32(c) and 32(d), ch. 18, SLA 2014, are repealed. 09 (c) Section 4, ch. 5, FSSLA 2011, page 127, lines 23 - 26, and allocated on page 129, 10 line 33, through page 130, line 4, is repealed. 11 * Sec. 35. LAPSE. (a) The appropriations made in secs. 12, 17(2), 18, 20(a), 21, 22(b), 24 - 12 27, and 29 of this Act are for capital projects and lapse under AS 37.25.020. 13 (b) The appropriations made in secs. 15, 17(1), 19, 20(b), 22(a), and 32 of this Act are 14 for the capitalization of funds and do not lapse. 15 (c) The unexpended and unobligated balances, estimated to be a total of $1,075,000, 16 of the appropriations made in secs. 16(a) and (c), ch. 16, SLA 2013, lapse into the general 17 fund on April 19, 2015. 18 * Sec. 36. Sections 10 - 15, 34, and 35(c) of this Act take effect April 19, 2015. 19 * Sec. 37. Sections 19, 20(a), 20(b), 21 - 32, 33(a), and 33(c) of this Act take effect June 30, 20 2015. 21 * Sec. 38. Except as provided in secs. 36 and 37 of this Act, this Act takes effect July 1, 22 2015.