txt

HB 336: "An Act directing the Alaska Energy Authority to conduct a study of and to prepare a proposal for an appropriately sized Susitna River hydroelectric power project; and providing for an effective date."

00 HOUSE BILL NO. 336 01 "An Act directing the Alaska Energy Authority to conduct a study of and to prepare a 02 proposal for an appropriately sized Susitna River hydroelectric power project; and 03 providing for an effective date." 04 BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF ALASKA: 05 * Section 1. The uncodified law of the State of Alaska is amended by adding a new section 06 to read: 07 HYDROELECTRIC POWER STUDY. The Alaska Energy Authority, in consultation 08 with the Railbelt electric utilities, shall conduct a study of and prepare a proposal for a 09 hydroelectric power project on the Susitna River appropriately sized for the Railbelt area. In 10 conducting the study, the authority shall review prior studies and data regarding hydroelectric 11 power projects in the area. The authority shall present its findings and a proposal for a 12 hydroelectric power project, including the estimated costs of the project, to the legislature not 13 later than June 30, 2010. 14 * Sec. 2. This Act is repealed June 30, 2010.

01 * Sec. 3. This Act takes effect July 1, 2008.