CSSB 29(FIN): "An Act making and amending appropriations and reappropriations; making appropriations under art. IX, sec. 17(c), Constitution of the State of Alaska, from the constitutional budget reserve fund; and providing for an effective date."

00 CS FOR SENATE BILL NO. 29(FIN) 01 "An Act making and amending appropriations and reappropriations; making 02 appropriations under art. IX, sec. 17(c), Constitution of the State of Alaska, from the 03 constitutional budget reserve fund; and providing for an effective date." 04 BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF ALASKA: 05 (SECTION 1 OF THIS ACT BEGINS ON PAGE 2)

01 02 * Section 1. The following appropriation items are for capital projects and grants from the general fund or 03 other funds as set out in section 2 of this Act by funding source to the agencies named for the purposes 04 expressed and lapse under AS 37.25.020, unless otherwise noted. 05 Appropriation General Other 06 Allocations Items Funds Funds 07 * * * * * * * * * * * * 08 * * * * * * Department of Administration * * * * * * 09 * * * * * * * * * * * * 10 ARCS Video Automation and 77,500 77,500 11 Control Project (ED 99) 12 License Plates and Drivers 275,000 275,000 13 License Manuals (ED 99) 14 Emergency Communications: Land 16,248,100 814,500 15,433,600 15 Mobile Radio Migration (ED 99) 16 Mainframe Improvements, 2,181,000 2,181,000 17 Equipment Replacement, Virus 18 Scanning, and Metadirectory 19 Development (ED 99) 20 Alaska Public Broadcasting 21 Grants (AS 44.21.268) 22 Alaska Public 300,000 300,000 23 Telecommunications, Inc. - 24 Digital Television Conversion 25 (ED 10-25) 26 * * * * * * * * * * * * 27 * * * * * * Department of Community and Economic Development * * * * * * 28 * * * * * * * * * * * * 29 Securities Database (ED 99) 300,000 300,000 30 Operation Renew Hope (ED 99) 30,500,000 30,500,000 31 Community Block Grants (ED 99) 9,000,000 9,000,000 32 Federal Community Development 6,350,000 300,000 6,050,000 33

01 Grants (ED 99) 02 Bulk Fuel Systems Upgrades 4,950,000 4,950,000 03 (ED 99) 04 Rural Power Systems Upgrades 10,500,000 10,500,000 05 (ED 99) 06 Alternative Energy Program 5,787,000 5,787,000 07 (ED 99) 08 Alaska-Russian Far East Projects 305,835 305,835 09 Phase 2 (ED 99) 10 Kodiak Launch Complex Facilities 4,500,000 4,500,000 11 (ED 6) 12 AIDEA Reimbursement - Larsen Bay 400,000 400,000 13 (ED 6) 14 Grants to Municipalities 15 (AS 37.05.315) 16 Anchorage - Chugiak Senior 40,000 40,000 17 Center Day Care/Alzheimer's Care 18 Addition (ED 26) 19 Anchorage - Dimond Boulevard and 80,000 80,000 20 Arlene Street Sound Barrier Wall 21 Construction (ED 10-25) 22 Anchorage - Fire Lake Dam 240,000 240,000 23 Reconstruction (ED 10-25) 24 Anchorage - Huffman Road and 250,000 250,000 25 Pintail Street Traffic Signal 26 (ED 10-25) 27 Anchorage - Karluk Street Sound 100,000 100,000 28 and Visual Barrier (ED 10-25) 29 Anchorage - Northeast Anchorage 30,000 30,000 30 Community Center/Boys and Girls 31 Club Van Purchase (ED 10-25)

01 Anchorage - Northeast Anchorage 10,500 10,500 02 Community Patrol Equipment 03 Acquisition (ED 10-25) 04 Anchorage - South Fork Volunteer 17,500 17,500 05 Fire Department Property 06 Purchase (ED 24) 07 Anchorage Eagle River/Chugiak 50,000 50,000 08 Road and Drainage Rehabilitation 09 (ED 26) 10 Angoon - Police and Fire 165,100 165,100 11 Department Equipment Purchase 12 (ED 5) 13 Emmonak - City Garbage Truck 50,000 50,000 14 (ED 38) 15 Kodiak Island Borough - 200,000 200,000 16 Fisheries Research Building 17 Feasibility Study (ED 6) 18 Larsen Bay - Hydro Repair 100,000 100,000 19 Project (ED 6) 20 Mat-Su Borough - Armed Forces 32,500 32,500 21 Honor Garden Construction (ED 26- 22 28) 23 Mat-Su Borough - Upper Susitna 367,000 367,000 24 Senior Center Construction 25 (ED 26-28) 26 Ouzinkie - Sewer & Water Repair 150,000 150,000 27 and Extension (ED 6) 28 Palmer - South Zone Facility, 120,000 120,000 29 Palmer Airport Ramp Access 30 Construction and Paving (ED 26- 31 28)

01 Petersburg - Swimming Pool 140,000 140,000 02 Replacement (ED 2) 03 Saxman Fire Engine Replacement 280,000 280,000 04 (ED 1) 05 Seward - Seward Shipyard 1,000,000 1,000,000 06 Portable Work Station (ED 8) 07 Sitka - Community Jail State 100,000 100,000 08 Costs (ED 2) 09 Wrangell - Heritage Harbor 850,000 850,000 10 Engineering Costs (ED 2) 11 Yakutat - Teacher Housing 32,500 32,500 12 Project Construction (ED 5) 13 Grants to Named Recipients 14 (AS 37.05.316) 15 Alano Club (ED 10-25) 295,000 295,000 16 Alaska Aviation Heritage Museum - 450,000 450,000 17 New Hangar and Aircraft (ED 99) 18 Alaska Civil Air Patrol - Lake 14,000 14,000 19 Hood Hangar Capital Improvements 20 (ED 10-25) 21 Alaska Siberia Research Center - 48,000 48,000 22 Lend/Lease Memorial Project 23 (ED 29-34) 24 Alaska Zoo Parking Lot Planning 111,000 111,000 25 and Design (ED 10-25) 26 Aleut International Association 25,000 25,000 27 Grant (ED 40) 28 Arctic Winter Games Team Alaska 225,000 225,000 29 (ED 99) 30 AWAIC Equipment Replacement 34,000 34,000 31 (ED 10-25)

01 Cooper Landing Community Club: 110,000 110,000 02 Emergency Response Equipment - 03 Ambulance (ED 8) 04 Ester Community Association, 50,000 50,000 05 Inc. - Community Parks 06 Improvements (ED 29-34) 07 Golden Valley Electric 250,000 250,000 08 Association - Extend Electric 09 Service to Chatanika (ED 26-28) 10 Heritage Place Banner Health 25,000 25,000 11 System - Mini-van (ED 8) 12 Hyder Community Association - 85,000 85,000 13 Blacktop Community Economic 14 Enterprise Zone (ED 1) 15 National Council on Alcoholism & 10,000 10,000 16 Drug Dependence - Juneau 17 Wellness Court (ED 99) 18 Partners for Downtown Progress - 75,000 75,000 19 Anchorage Wellness Court (ED 99) 20 Point Baker - Potable Water and 50,000 50,000 21 Wastewater Facility Development 22 (ED 5) 23 Alaska Energy Authority - Grants 24 to Named Recipients 25 (AS 37.05.316) 26 Matanuska Electric Association - 750,000 750,000 27 Extend Electric Service to 28 Unserved Areas (ED 26-28) 29 Grants to Unincorporated 30 Communities (AS 37.05.317) 31 Copper Center Fire Department 50,000 50,000

01 Handicapped/DD Access 02 Improvements (ED 35) 03 * * * * * * * * * * * * 04 * * * * * * Department of Corrections * * * * * * 05 * * * * * * * * * * * * 06 Facility Maintenance, Repair, 600,000 600,000 07 Renewal, Replacement, and 08 Renovation (ED 99) 09 Criminal Justice Management 400,000 400,000 10 Information System Replacement 11 (ED 99) 12 Replacement and Repair of 250,000 250,000 13 Security Systems, and Life and 14 Safety Equipment (ED 99) 15 Community Jails Facilities 100,000 100,000 16 Maintenance, Repair and 17 Renovation, and Life and Safety 18 Equipment (ED 99) 19 Correctional Institutions Roof 400,000 400,000 20 Repairs and Replacement (ED 99) 21 * * * * * * * * * * * * 22 * * * * * * Department of Education and Early Development * * * * * * 23 * * * * * * * * * * * * 24 Mt. Edgecumbe High School Roof 500,000 500,000 25 Repair and Replacement (ED 2) 26 Museum Facility Upgrade (ED 3-4) 550,000 550,000 27 Head Start Health and Safety 200,000 200,000 28 Repairs (ED 99) 29 AVTEC Roof Repair and 650,000 650,000 30 Replacement (ED 8)

01 * * * * * * * * * * * * 02 * * * * * * Department of Environmental Conservation * * * * * * 03 * * * * * * * * * * * * 04 Statewide Contaminated Sites 5,000,000 5,000,000 05 Cleanup (ED 99) 06 Small Drinking Water System 1,276,800 1,276,800 07 Operator Certification Project 08 (ED 99) 09 Fine Particulate Monitoring 477,200 477,200 10 (ED 99) 11 Environmental Monitoring and 1,000,000 1,000,000 12 Assessment Program (ED 99) 13 Hazardous Material Response 500,000 500,000 14 Capabilities for Local 15 Government (ED 99) 16 Grants and Loans for Cleanup of 1,000,000 1,000,000 17 Underground Storage Tanks (ED 99) 18 Amchitka Workers Health 2,340,000 2,340,000 19 Assessment Project (ED 40) 20 Village Safe Water Project 1,961,100 1,961,100 21 Administration (ED 99) 22 Village Safe Water Feasibility 3,825,000 3,825,000 23 Studies 24 Akhiok Landfill and Water 50,000 25 Quality Protection Master Plan 26 (ED 6) 27 Allakaket Sanitation Facilities 160,000 28 Improvement Plan (ED 36) 29 Annette Island Sanitation 175,000 30 Improvement Study (ED 5) 31 Cantwell Utility Master Plan 150,000

01 (ED 34) 02 Cold Bay Landfill and Water 100,000 03 Quality Protection Feasibility 04 Study (ED 40) 05 Denali Borough Feasibility Study 160,000 06 and Sanitation Master Plan 07 (ED 34) 08 Eek Utilities Master Plan (ED 39) 150,000 09 Ekuk Feasibility Study and 140,000 10 Sanitation Improvement Master 11 Plan (ED 39) 12 Gambell Solid Waste, Sanitation 200,000 13 Master Plan (ED 38) 14 Glennallen Sanitation 250,000 15 Feasibility Study (ED 35) 16 Gulkana Sanitation Facilities 125,000 17 Master Plan (ED 36) 18 Healy Lake Landfill Siting and 75,000 19 Water Quality Protection Study 20 (ED 36) 21 Holy Cross Sanitation Master 125,000 22 Plan (ED 36) 23 Kasaan Feasibility Study for 115,000 24 Water and Sewer Main Extension 25 (ED 5) 26 Kivalina Sanitation Master Plan 150,000 27 (ED 37) 28 Kluti-Kaah Sanitation Master 150,000 29 Plan (ED 35) 30 Kotlik Sanitation Feasibility 200,000 31 Study (ED 38)

01 Koyukuk Sanitation Master Plan 150,000 02 (ED 36) 03 Lime Village Sanitation Master 60,000 04 Plan (ED 36) 05 Manokotak Water, Sewer and Solid 120,000 06 Waste Feasibility Study (ED 39) 07 Newtok Sanitation Master Plan 175,000 08 (ED 38) 09 Nikolai Master Plan for Water, 150,000 10 Sanitary Sewer and Solid Waste 11 (ED 36) 12 Noatak Sanitation Master Plan 75,000 13 Update (ED 37) 14 Pitka's Point Community 150,000 15 Facilities Master Plan (ED 38) 16 Rampart Solid Waste and Water 75,000 17 Quality Protection Plan (ED 36) 18 Saint Mary's Water Treatment 65,000 19 Plant Optimization Study (ED 38) 20 Unalakleet Water Source 100,000 21 Feasibility Study (ED 38) 22 Venetie Sanitation Master Plan 150,000 23 (ED 36) 24 White Mountain Sanitation 80,000 25 Facilities Plan Upgrade (ED 38) 26 Village Safe Water Projects 51,303,900 51,303,900 27 Akiak Lagoon Completion and 1,920,000 28 Gravity Sewer Main Construction 29 (ED 39) 30 Alakanuk Water and Sewer 530,000 31 Expansion (ED 38)

01 Ambler Water Treatment Plant 1,850,000 02 Phase 2 (ED 37) 03 Anchor Point Water System 350,000 04 Expansion Project (ED 7) 05 Bethel Water and Sewer 3,300,000 06 Improvements (ED 39) 07 Brevig Mission Water and Sewer 1,771,000 08 (ED 38) 09 Buckland Water and Sewer System 3,030,900 10 Phase 5 South (ED 37) 11 Chevak Water and Sewer System 1,350,000 12 Improvements (ED 38) 13 Deering Water and Sewer Project 580,000 14 (ED 37) 15 Egegik Water and Sewer Project 1,490,300 16 Phase 2 (ED 40) 17 Fort Yukon Water and Sewer 1,385,500 18 Improvements (ED 36) 19 Glennallen Lagoon Upgrades Phase 1,650,000 20 2 (ED 35) 21 Golovin Water and Sewer Project 600,000 22 Phases 2 and 4 (ED 38) 23 Goodnews Bay Water and Sewer 1,666,000 24 Project (ED 39) 25 Hooper Bay Piped Water and Sewer 2,900,000 26 Project (ED 38) 27 Ketchikan Gateway Borough Shoup 1,900,000 28 Street Water and Sewer, and 29 Tongass Water Main (ED 1) 30 Kongiganak Completion of Phase 2 2,811,900 31 Sewer (ED 39)

01 Kotzebue Lift Station Upgrade 722,000 02 Project Phase 3 (ED 37) 03 Kwigillingok Water and Sewer 2,590,000 04 Improvements (ED 39) 05 Mekoryuk Force Main and Pump 2,895,000 06 Station Step 2B (ED 38) 07 Minto Water and Sewer 785,000 08 Improvements (ED 36) 09 Napakiak Flush Tank and Haul 1,186,600 10 Final Phase and Solid Waste 11 Landfill Relocation (ED 39) 12 Napaskiak Sanitation Improvement 1,270,000 13 Project Phase 2 (ED 39) 14 New Stuyahok Percolation Lagoon 493,000 15 and Sewer Main Project (ED 39) 16 Noorvik Honey Bucket Lagoon and 750,000 17 Solid Waste Disposal Project 18 (ED 37) 19 Nunam Iqua Wastewater Treatment 2,110,000 20 Improvements (ED 38) 21 Nunapitchuk Water and Sewer 1,700,000 22 Improvements (ED 39) 23 Pilot Station Water and Sewer 1,881,000 24 Project (ED 36) 25 Ruby Sanitation Facility 1,200,000 26 Improvements Phase 1 (ED 36) 27 Saint Michael Water and Sewer 1,135,000 28 Project (ED 38) 29 Shungnak Water and Sewer 585,000 30 Improvements (ED 37) 31 Tetlin Sanitation Improvement 1,575,000

01 Project Phase 2 (ED 36) 02 Togiak Wastewater Treatment 1,340,700 03 Improvements (ED 39) 04 Municipal Water, Sewer and Solid 23,510,600 23,510,600 05 Waste Matching Grant Projects 06 Anchorage Water, Wastewater and 2,750,000 07 Water Quality Projects (ED 10-25) 08 Atqasuk Sewer System 400,000 09 Improvements (ED 37) 10 Cordova Wastewater Treatment 1,940,400 11 Plant Upgrade Project Phase 1 12 (ED 35) 13 Craig Water Treatment Facilities 778,200 14 and Distribution Upgrade (ED 5) 15 Kenai Well House Number 4 with 250,000 16 Main Line Tie-Ins, Phase 3 (ED 9) 17 Matanuska Susitna Borough 1,653,200 18 Central Landfill Expansion 19 (ED 26-28) 20 Nenana Phase 2 Water and Sewer 2,241,800 21 Extension (ED 36) 22 Nome Utilidor Replacement Phase 2,500,000 23 6 (ED 38) 24 Nome Water and Sewer System 540,000 25 Expansion Phase 3 (ED 38) 26 Palmer Wastewater Sludge 26,000 27 Feasibility Study (ED 27) 28 Petersburg Scow Bay Sewer 915,000 29 Extension Project, Final Phase 30 (ED 2) 31 Petersburg Scow Bay Water 1,690,000

01 Project Phase 4 (ED 2) 02 Point Hope Sewer System 194,500 03 Improvements (ED 37) 04 Sand Point Municipal Water 819,000 05 Treatment Plant (ED 40) 06 Sitka Sawmill Creek Road Sewer 900,000 07 Expansion Phase 2 (ED 2) 08 Sitka Wastewater Sludge 25,000 09 Feasibility Study (ED 2) 10 Skagway Solid Waste Facility 20,000 11 Improvements (ED 5) 12 Soldotna Third Clarifier for the 1,000,000 13 Wastewater Treatment Plant (ED 8) 14 Valdez Mineral Creek Loop Road 1,912,500 15 Water Distribution Line 16 Extension (ED 35) 17 Wasilla Water Main Improvement 850,000 18 Program (ED 27) 19 Wrangell Wastewater Treatment 1,580,000 20 Plant Upgrade (ED 2) 21 Wrangell Water System 525,000 22 Rehabilitation Project Phase 1 23 (ED 2) 24 * * * * * * * * * * * * 25 * * * * * * Department of Fish and Game * * * * * * 26 * * * * * * * * * * * * 27 Statewide Facilities Repair, 300,000 300,000 28 Maintenance, and Replacement 29 (ED 99) 30 Vessel and Aircraft Repair, 450,000 450,000 31 Maintenance and Replacement

01 (ED 99) 02 Dock Repairs, Maintenance & 125,000 125,000 03 Replacement Phase 2 (ED 40) 04 Sport Fishing and Recreational 1,600,000 1,600,000 05 Boating Public Access and 06 Facility Development (ED 99) 07 Norton Sound Salmon Research 5,000,000 5,000,000 08 Initiative (ED 38) 09 Nearshore Fisheries Research and 1,798,100 1,798,100 10 Assessment (ED 99) 11 Snow Crab Fishery Disaster 1,000,000 1,000,000 12 Research (ED 40) 13 Log Transfer Facility Research 700,000 700,000 14 and Remediation (ED 99) 15 Wildlife Habitat Management in 100,000 100,000 16 Interior Alaska (ED 29-34) 17 Equipment Replacement for 100,000 100,000 18 Wildlife Conservation Programs 19 (ED 99) 20 Kachemak Bay Research Reserve 3,500,000 3,500,000 21 Facilities Design and 22 Construction (ED 7) 23 Commercial Fisheries Entry 115,000 115,000 24 Commission Permit and Vessel 25 Licensing (ED 3-4) 26 * * * * * * * * * * * * 27 * * * * * * Office of the Governor * * * * * * 28 * * * * * * * * * * * * 29 AccuVote System - Payment 4 of 6 387,789 387,789 30 (ED 99) 31 Americans with Disabilities Act 250,000 250,000

01 Compliance Projects (ED 99) 02 Pacific Salmon Treaty (ED 99) 1,350,000 1,350,000 03 * * * * * * * * * * * * 04 * * * * * * Department of Health and Social Services * * * * * * 05 * * * * * * * * * * * * 06 Deferred Maintenance, Renewal, 715,000 363,000 352,000 07 Replacement, and Equipment 08 (ED 99) 09 Public Health Nurse, Probation 2,531,000 200,000 2,331,000 10 Officer, Social Worker Safety 11 and Support Equipment (ED 99) 12 Juneau Public Health Center 90,000 73,800 16,200 13 Heating and Ventilation Upgrades 14 (ED 99) 15 Emergency Communications: 241,600 241,600 16 Emergency Medical Services 17 (ED 99) 18 Emergency Medical Services 200,000 200,000 19 Equipment Grants - Match for 20 Code Blue Project (ED 99) 21 Kenai Youth Detention Facility 4,600,000 4,600,000 22 Construction (ED 7-9) 23 Fairbanks Youth Detention 3,452,000 3,452,000 24 Facility Design and Construction 25 (ED 29-34) 26 Nome Youth Detention Facility - 380,000 255,000 125,000 27 Design 4 Phase Addition (ED 38) 28 * * * * * * * * * * * * 29 * * * * * * Department of Labor and Workforce Development * * * * * * 30 * * * * * * * * * * * *

01 Home Modifications for 100,000 100,000 02 Individuals with Disabilities 03 (ED 99) 04 * * * * * * * * * * * * 05 * * * * * * Department of Military and Veterans Affairs * * * * * * 06 * * * * * * * * * * * * 07 Army Guard Facilities Deferred 800,000 200,000 600,000 08 Maintenance (ED 99) 09 Air Guard Facility Deferred 600,000 150,000 450,000 10 Maintenance (ED 99) 11 Facilities Spill Prevention and 120,000 15,600 104,400 12 Countermeasures (ED 99) 13 Federal Scout Readiness Centers 300,000 300,000 14 Energy Projects (ED 99) 15 Federal Scout Readiness Centers 1,700,000 1,700,000 16 Construction (ED 99) 17 Emergency Communications: 106,700 106,700 18 Rescue Coordination Equipment 19 Replacement (ED 10-25) 20 Alaska National Guard 100,000 100,000 21 Counterdrug Support Program 22 (ED 99) 23 * * * * * * * * * * * * 24 * * * * * * Department of Natural Resources * * * * * * 25 * * * * * * * * * * * * 26 Gasline Development (ED 99) 10,242,800 10,242,800 27 Land Use Data Base System for 495,000 495,000 28 Industry and Public Access 29 (ED 99) 30 Seismic Data Acquisition and 138,000 138,000 31 Interpretation To Promote Oil

01 Exploration & Leasing (ED 99) 02 Emergency Title Defense-Prince 120,000 120,000 03 William Sound (ED 99) 04 State Park Emergency Repairs 286,000 286,000 05 (ED 99) 06 Fire Truck Engine Replacements 100,000 100,000 07 (ED 99) 08 Fairbanks Office Facility Roof 200,000 200,000 09 Maintenance and Repairs (ED 29- 10 34) 11 Airborne Geological and 250,000 250,000 12 Geophysical Mineral Inventory 13 (ED 99) 14 Snowmachine Trail Development 200,000 200,000 15 and Program Grants (ED 99) 16 Chena Pump Road Boat Launch 101,500 101,500 17 River Access Purchase (ED 29-34) 18 Alaska Minerals Information At 700,000 700,000 19 Risk Program: Mining Claims 20 Automation (ED 99) 21 Recorder's Office Equipment 225,000 225,000 22 Upgrades and Records 23 Preservation (ED 99) 24 Agricultural Revolving Loan Fund 100,000 100,000 25 Land and Assets Disposal (ED 99) 26 Alaska Post Entry Plant 1,350,000 1,350,000 27 Quarantine Facility 28 Establishment (ED 27) 29 Agriculture Plant Material 3,070,000 3,070,000 30 Center Seed Lab Construction 31 (ED 27)

01 Agricultural Land Sales for 145,000 145,000 02 Agriculture Industry (ED 26-28) 03 Historic Preservation and 600,000 600,000 04 Restoration Projects - United 05 States Army Public Works Program 06 (ED 99) 07 National Historic Preservation 1,250,000 50,000 1,200,000 08 Fund Federal Grant Program 09 (ED 99) 10 Abandoned Mine Lands Reclamation 1,500,000 1,500,000 11 Federal Program (ED 99) 12 Boating Safety-Federal Program 660,000 660,000 13 (ED 99) 14 Land and Water Conservation Fund 1,600,000 1,600,000 15 Federal Grants (ED 99) 16 National Recreational Trails 710,000 710,000 17 Federal Program (ED 99) 18 Forest Legacy Federal Grant 500,000 500,000 19 Program (ED 99) 20 National Fire Plan: Managing 5,638,000 5,638,000 21 Impacts of Wildfires on 22 Communities and the Environment 23 (ED 7-9) 24 Alaska Applied Remote Sensing 3,500,000 3,500,000 25 Project (ED 99) 26 Grants to Named Recipients 27 (AS 37.05.316) 28 Eagle River Lions Club - Water 25,000 25,000 29 Project (ED 24)

01 * * * * * * * * * * * * 02 * * * * * * Department of Public Safety * * * * * * 03 * * * * * * * * * * * * 04 Aircraft and Vessel Repair and 900,000 900,000 05 Maintenance (ED 99) 06 Trooper Law Enforcement 250,000 250,000 07 Equipment (ED 99) 08 Fish and Wildlife Statewide Law 205,000 205,000 09 Enforcement Equipment 10 Replacement (ED 99) 11 Alaska Public Safety Information 2,725,500 2,725,500 12 Network Redesign (ED 99) 13 Fairbanks Public Safety Building 43,600 43,600 14 Roof Replacement (ED 30) 15 Soldotna Public Safety Building 15,300 15,300 16 Roof Repair (ED 8) 17 Crime Lab Improvement Program 1,315,900 65,900 1,250,000 18 (ED 10-25) 19 Emergency Communications: 400,400 350,400 50,000 20 Southeast Upgrade (ED 3-4) 21 Alaska Law Enforcement Photo 1,300,000 1,300,000 22 Network (ED 99) 23 Rural Law Enforcement Support 1,800,000 1,800,000 24 (ED 99) 25 Technology, Policing and 2,200,000 2,200,000 26 Enforcement Initiatives Grants 27 to Municipalities (ED 99) 28 * * * * * * * * * * * * 29 * * * * * * Department of Revenue * * * * * * 30 * * * * * * * * * * * *

01 Child Support Enforcement 1,500,000 510,000 990,000 02 Caseload Management System 03 Modification Project (ED 10-25) 04 Permanent Fund Dividend Appeals 125,000 125,000 05 Process Streamlining (ED 3-4) 06 AHFC Supplemental Housing 4,500,000 4,500,000 07 Development Program (ED 99) 08 AHFC Low Income Weatherization 4,400,000 4,400,000 09 (ED 99) 10 AHFC Paxton Manor Replacement 2,401,000 2,401,000 11 (Sitka) (ED 2) 12 AHFC Chugach View Renovation - 4,697,000 4,697,000 13 Phase 2 (Anchorage Senior Units) 14 (ED 10-25) 15 AHFC Senior Citizens Housing 1,472,200 1,472,200 16 Development Program (ED 99) 17 AHFC Senior and Statewide 1,570,260 1,570,260 18 Deferred Maintenance and 19 Renovation (ED 99) 20 AHFC Housing and Urban 3,500,000 3,500,000 21 Development Capital Fund Program 22 (ED 99) 23 AHFC Housing and Urban 3,800,000 3,800,000 24 Development Federal HOME Grant 25 (ED 99) 26 AHFC Federal and Other 4,250,000 4,250,000 27 Competitive Grants (ED 99) 28 AHFC Competitive Grants for 1,000,000 1,000,000 29 Public Housing (ED 99) 30 AHFC Energy Efficiency 300,000 300,000 31 Monitoring Research (ED 99)

01 AHFC State Energy Program 180,000 180,000 02 Special Projects (ED 99) 03 Design, Planning, Initial 300,000 300,000 04 Construction and Matching Funds 05 for the Anchorage Senior Center 06 Expansion (ED 10-25) 07 * * * * * * * * * * * * 08 * * * * * * Department of Transportation/Public Facilities * * * * * * 09 * * * * * * * * * * * * 10 Safety Inspection of State Owned 200,000 200,000 11 High Risk Facilities (ED 99) 12 Material Stockpiles: Dalton - 500,000 500,000 13 Elliott Highway (ED 36) 14 Weights and Measures Testing 60,000 60,000 15 Unit Replacement (ED 99) 16 Alaska Marine Highway System: 4,200,000 4,200,000 17 Overhaul, Rehabilitation, and 18 Mandatory Training (ED 99) 19 Facilities Deferred Maintenance 800,000 800,000 20 and Critical Repairs (ED 99) 21 Emergency and Non-Routine 600,000 600,000 22 Repairs (ED 99) 23 Corps of Engineers - Harbors 1,248,000 1,248,000 24 Program (ED 99) 25 Harbor Deferred Maintenance 600,000 600,000 26 (ED 99) 27 Airport Deferred Maintenance 600,000 600,000 28 (ED 99) 29 Highway Deferred Maintenance 1,300,000 1,300,000 30 (ED 99) 31 State Equipment Fleet 11,800,000 11,800,000

01 Replacement (ED 99) 02 Willow Crest Elementary School - 1,300,000 1,300,000 03 ADA Overpass Improvement (Phase 04 II and III) (ED 10-25) 05 Nikiski Emergency Exit Road 250,000 250,000 06 (ED 9) 07 Statewide Federal Programs 86,923,800 48,688,800 38,235,000 08 Capital Improvement Program 1,500,000 09 Equipment Replacement (ED 99) 10 Cooperative Reimbursable 13,500,000 11 Projects (ED 99) 12 Federal-Aid Aviation State Match 7,587,400 13 (ED 99) 14 Federal-Aid Highway State Match 41,000,000 15 (ED 99) 16 Federal Emergency and 12,000,000 17 Contingency Projects (ED 99) 18 Federal Transit Administration 1,162,000 19 Grants (ED 99) 20 Highway Safety Grants Program 2,674,400 21 (ED 99) 22 Statewide Safety Program (ED 99) 7,500,000 23 Airport Improvement Program 311,338,532 311,338,532 24 Akutan: Airport Master Plan 1,200,000 25 (ED 40) 26 Alaska International Airport 12,305,000 27 System: Development Fund (ED 99) 28 Alaska International Airport 11,101,375 29 System: Emergency and Reserve 30 Funds (ED 99) 31 Alaska International Airport 2,000,000

01 System: Repair or Replacement 02 Program (ED 99) 03 Angoon: Airport Master Plan 500,000 04 (ED 5) 05 Anvik: Airport Rehabilitation 1,800,000 06 (ED 36) 07 Atka: Airport Resufacing and 1,500,000 08 Extension (ED 40) 09 Barrow: Runway and Apron Paving/ 5,900,000 10 Safety Area Expansion Stage 1 11 (ED 37) 12 Barrow: Runway and Apron Paving/ 10,200,000 13 Safety Area Expansion Stage 2 14 (ED 37) 15 Bettles: Float Plane Base 2,250,000 16 Improvement (ED 36) 17 Birch Creek: Airport Resurfacing 1,200,000 18 (ED 36) 19 Birchwood: Airport Master Plan 200,000 20 Stage 2 (ED 25) 21 Chignik: Snow Removal Equipment - 200,000 22 Grader (ED 40) 23 Chuathbaluk: Airport Relocation 8,000,000 24 (ED 36) 25 Cold Bay: Airport Rescue and 470,000 26 Firefighting Vehicle (ED 40) 27 Crooked Creek: Airport Master 290,000 28 Plan Stage 2 (ED 36) 29 Deering: Airport Rehabilitation 4,810,000 30 (ED 37) 31 Dillingham: Airport Master Plan 50,000

01 (ED 39) 02 Eek: Airport Relocation Phase 2 2,800,000 03 (ED 39) 04 Eek: Snow Removal Equipment - 175,000 05 Loader with Boss Plow (ED 39) 06 Elim: Airport Resurfacing (ED 38) 4,860,000 07 Elim: Snow Removal Equipment - 158,000 08 Grader (ED 38) 09 Emmonak: Rehabilitation and 2,000,000 10 Apron Expansion (ED 38) 11 Emmonak: Snow Removal Equipment - 200,000 12 720 Grader (ED 38) 13 Fairbanks International Airport: 400,000 14 Airport Rescue and Firefighting 15 Facility Repairs (ED 29-34) 16 Fairbanks International Airport: 700,000 17 Annual Improvements (ED 29-34) 18 Fairbanks International Airport: 1,650,000 19 Drainage Improvements Phase 3 20 (ED 29-34) 21 Fairbanks International Airport: 1,450,000 22 East Side Utilities Phase 2 23 (ED 29-34) 24 Fairbanks International Airport: 500,000 25 Environmental Assessment and 26 Cleanup (ED 29-34) 27 Fairbanks International Airport: 1,807,000 28 Equipment (ED 29-34) 29 Fairbanks International Airport: 400,000 30 Preliminary Planning and Scoping 31 Studies (ED 29-34)

01 Fairbanks International Airport: 2,700,000 02 Terminal Heating, Ventilation 03 and Air Conditioning System 04 Improvements (ED 29-34) 05 Fairbanks International Airport: 3,990,000 06 Terminal Improvement Phase 2 07 Construction (ED 29-34) 08 Fairbanks International Airport: 2,450,000 09 Terminal Roof Replacement 10 Construction (ED 29-34) 11 Hoonah: Airport Lighting (ED 5) 1,000,000 12 Hughes: Snow Removal Equipment - 200,000 13 Grader (ED 36) 14 Kaltag: Snow Removal Equipment - 200,000 15 Grader (ED 36) 16 Ketchikan: Runway and Taxiway 240,000 17 Light Replacement - Stage 2 18 (ED 1) 19 Kivalina: Airport Resurfacing 960,000 20 (ED 37) 21 Klawock: Sand & Chemical Storage 100,000 22 Building (ED 5) 23 Klawock: Terminal Building and 2,100,000 24 Parking Lot (ED 5) 25 Kobuk: Airport Reconstruction 3,150,000 26 (ED 37) 27 Kokhanok: Airport Resurfacing 725,000 28 and Lighting (ED 40) 29 Koyukuk: Airport Rehabilitation 5,090,000 30 (ED 36) 31 Lake Hood: General Aviation 3,186,000

01 Parking and Taxiway Relocation 02 (ED 10-25) 03 Lake Hood: Lake Dredging and 1,270,000 04 Bank Stabilization (ED 10-25) 05 Lake Louise: Runway 2,240,000 06 Rehabilitation (ED 27) 07 Little Diomede: Snow Removal 79,139 08 Equipment - Dozer (ED 37) 09 Manokotak: Snow Removal 200,000 10 Equipment - Grader (ED 39) 11 Metlakatla: Seaplane Float 1,000,000 12 Terminal Building (ED 5) 13 Minchumina: Snow Removal 125,000 14 Equipment - Loader (ED 36) 15 Nikolai: Airport Improvements 500,000 16 (ED 36) 17 Noorvik: Airport Relocation - 250,000 18 Stage 3 (ED 37) 19 Nunapitchuk: Resurfacing and 5,000,000 20 Lighting (ED 39) 21 Ouzinkie: Airport Master Plan 251,000 22 Stage 3 (ED 6) 23 Perryville: Snow Removal 200,000 24 Equipment - Grader (ED 40) 25 Petersburg: Airport Master Plan 300,000 26 Update (ED 2) 27 Petersburg: Sand & Chemical 1,700,000 28 Storage Building (ED 2) 29 Point Hope: Snow Removal 160,000 30 Equipment - Grader (ED 37) 31 Point Hope: Snow Removal 100,000

01 Equipment - Loader (ED 37) 02 Port Heiden: Snow Removal 200,000 03 Equipment - Grader (ED 40) 04 Port Lions: Airport Master Plan 290,000 05 Stage 2 (ED 6) 06 Shaktoolik: Snow Removal 162,018 07 Equipment - Grader (ED 38) 08 Shishmaref: Snow Removal 160,000 09 Equipment - Grader (ED 37) 10 Sitka: Apron and Taxiway 500,000 11 Reconstruction (ED 2) 12 Statewide: Aviation 10,000,000 13 Preconstruction (ED 99) 14 Statewide: Aviation Systems Plan 700,000 15 Update (ED 99) 16 Statewide: Various Airports 2,700,000 17 Minor Surface Improvements 18 (ED 99) 19 Stevens Village: Airport 740,000 20 Relocation - Stage 1 (ED 36) 21 Stony River: Airport 1,500,000 22 Rehabilitation (ED 36) 23 Talkeetna: Airport Improvement - 5,300,000 24 Stage 2 (ED 28) 25 Ted Stevens Anchorage 6,316,000 26 International Airport: Advanced 27 Project/Parking Design Study 28 (ED 10-25) 29 Ted Stevens Anchorage 2,237,000 30 International Airport: Airfield 31 Electrical and Lighting

01 Rehabilitation and Upgrades 02 (ED 10-25) 03 Ted Stevens Anchorage 15,524,000 04 International Airport: Airfield 05 Pavement Maintenance (ED 10-25) 06 Ted Stevens Anchorage 4,868,000 07 International Airport: Airfield 08 Safety and Blast Protection 09 (ED 10-25) 10 Ted Stevens Anchorage 2,632,000 11 International Airport: Annual 12 Improvements (ED 10-25) 13 Ted Stevens Anchorage 5,515,000 14 International Airport: 15 Communication Equipment and 16 System Relocation (ED 10-25) 17 Ted Stevens Anchorage 2,631,000 18 International Airport: Deicing 19 System (ED 10-25) 20 Ted Stevens Anchorage 1,905,000 21 International Airport: Energy 22 and Terminal Systems Upgrades 23 (ED 10-25) 24 Ted Stevens Anchorage 12,762,000 25 International Airport: 26 Environmental Compliance and 27 Cleanup (ED 10-25) 28 Ted Stevens Anchorage 4,999,000 29 International Airport: Equipment 30 (ED 10-25) 31 Ted Stevens Anchorage 32,000,000

01 International Airport: Field 02 Maintenance Facility (ED 10-25) 03 Ted Stevens Anchorage 1,053,000 04 International Airport: 05 Information Technology Systems 06 (ED 10-25) 07 Ted Stevens Anchorage 3,289,000 08 International Airport: Land 09 Acquisition and Mitigation 10 (ED 10-25) 11 Ted Stevens Anchorage 2,496,000 12 International Airport: Master 13 Plan (ED 10-25) 14 Ted Stevens Anchorage 5,262,000 15 International Airport: Noise 16 Abatement Program Implementation 17 (ED 10-25) 18 Ted Stevens Anchorage 4,902,000 19 International Airport: North 20 Terminal Waterline Replacement 21 (ED 10-25) 22 Ted Stevens Anchorage 998,000 23 International Airport: Old 24 International Airport Road 25 Upgrade (ED 10-25) 26 Ted Stevens Anchorage 4,539,000 27 International Airport: Roads, 28 Utilities & Grounds Construction 29 and Upgrades (ED 10-25) 30 Ted Stevens Anchorage 1,249,000 31 International Airport: Security,

01 Safety, and Access Control 02 Improvements (ED 10-25) 03 Ted Stevens Anchorage 14,500,000 04 International Airport: Security, 05 Safety, Emergency Access Control 06 and Communication Center (ED 10- 07 25) 08 Ted Stevens Anchorage 7,354,000 09 International Airport: Site 10 Development Preparation (ED 10- 11 25) 12 Ted Stevens Anchorage 6,075,000 13 International Airport: Taxiway 14 and Runway Improvements (ED 10- 15 25) 16 Ted Stevens Anchorage 14,538,000 17 International Airport: Terminal 18 Rehabilitation (ED 10-25) 19 Ted Stevens Anchorage 5,000,000 20 International Airport: Terminal 21 Relocations (ED 10-25) 22 Toksook Bay: Airport Relocation 500,000 23 (ED 38) 24 Tuntutuliak: Snow Removal 175,000 25 Equipment - Loader (ED 39) 26 Tununak: Snow Removal Equipment - 175,000 27 Loader (ED 38) 28 Ugashik: Snow Removal Equipment - 200,000 29 Grader (ED 40) 30 Wrangell: Airport Access Road 2,400,000 31 Realignment (ED 2)

01 Yakutat: Airport Snow Removal 1,000,000 02 Equipment Building Replacement 03 (ED 5) 04 Yakutat: Runway, Apron, and 1,450,000 05 Taxiway Improvements (ED 5) 06 Surface Transportation Program 451,756,482 451,756,482 07 Akiachak: Sanitation Road 1,450,000 08 Resurfacing (ED 39) 09 Alaska Highway: Milepost 1308 - 190,000 10 Tok Weigh Station (ED 36) 11 Alaska Marine Highway System: 160,000 12 Auke Bay West Terminal 13 Modifications (ED 4) 14 Alaska Marine Highway System: 5,000,000 15 Columbia Refurbishment (ED 99) 16 Alaska Marine Highway System: 1,946,682 17 Hollis Ferry Boat (Inter-Island 18 Ferry Authority) (ED 5) 19 Alaska Marine Highway System: 3,000,000 20 Metlakatla Ferry (new 21 construction) (ED 5) 22 Alaska Marine Highway System: 880,000 23 Metlakatla Terminal 24 Modifications (ED 5) 25 Alaska Marine Highway System: 7,500,000 26 Sitka and Auke Bay Terminal 27 Improvements (ED 2) 28 Alaska Marine Highway System: 4,500,000 29 Tustumena Refurbishment (ED 99) 30 Alaska Marine Highway System: 500,000 31 Tustumena Vehicle Elevator

01 Control Upgrade (ED 99) 02 Alaska Marine Highway System: 2,800,000 03 Valdez Staging Area 04 Modifications (ED 35) 05 Ambler: Sewage Lagoon Road 670,000 06 (ED 37) 07 Anchorage: Air Quality Awareness 130,000 08 Public Education Campaign (ED 10- 09 25) 10 Anchorage: Automated Operating 2,200,000 11 System for People Mover (ED 10- 12 25) 13 Anchorage: C Street 4,000,000 14 Reconstruction Phase 2 - 15 International Airport Road to 16 Dimond Boulevard (ED 10-25) 17 Anchorage: Campbell Creek Trail 3,400,000 18 Connection (ED 10-25) 19 Anchorage: CMAQ - Bicycle and 115,000 20 Pedestrian Safety Campaign 21 (ED 10-25) 22 Anchorage: CMAQ - School 35,000 23 District Compressed Natural Gas 24 Busses (ED 10-25) 25 Anchorage: Dowling Road 4,325,000 26 Reconstruction - Lake Otis 27 Parkway. to Old Seward Highway: 28 (ED 10-25) 29 Anchorage: Highway Safety 560,000 30 Improvement Projects (HSIP) 31 (ED 10-25)

01 Anchorage: Huffman Road 1,300,000 02 Intersection Improvements (ED 10- 03 25) 04 Anchorage: Inspection and 500,000 05 Monitoring Evader Sticker 06 Program (ED 10-25) 07 Anchorage: National Highway 3,000,000 08 System Intersection Improvements 09 (ED 10-25) 10 Anchorage: Old Glenn Highway 3,375,000 11 Rehabilitation - Artillery Road 12 to North Eagle River Exit (ED 10- 13 25) 14 Anchorage: Oxygen Sensor 137,000 15 Replacement Program (ED 10-25) 16 Anchorage: Pavement Replacement 400,000 17 Program (ED 10-25) 18 Anchorage: Pedestrian Safety and 450,000 19 Accessibility Improvements 20 (ED 10-25) 21 Anchorage: Private Sector Block 275,000 22 Heater Incentive Program (ED 10- 23 25) 24 Anchorage: Purchase of 365,000 25 Regenerative Air Street Sweepers 26 for Municipality of Anchorage 27 (ED 10-25) 28 Anchorage: Ridesharing and 510,000 29 Transit Marketing (ED 10-25) 30 Anchorage: Transit Route 160,000 31 Analysis (ED 10-25)

01 Anchorage: Transportation 137,000 02 Research Household Survey (ED 10- 03 25) 04 Anchorage: Youth Employment 50,000 05 Program for Transit Stop and 06 Trail Accessibility (ED 10-25) 07 Bethel: Boardwalk Construction 470,000 08 (ED 39) 09 Bethel: Chief Eddie Hoffman 1,900,000 10 Highway Separated Pathway (Anton 11 Anvil Path) (ED 39) 12 Bethel: Tundra Ridge Road 1,200,000 13 Improvements (ED 39) 14 Buckland River Bridge (ED 37) 3,830,000 15 Central Region: Winter Trail 250,000 16 Marking (ED 99) 17 Commercial Vehicle Enforcement 700,000 18 Program (ED 99) 19 Dalton Highway: Milepost 175 to 10,000,000 20 209 Reconstruction (ED 36) 21 Dalton Highway: Milepost 362 to 20,000,000 22 413 Reconstruction (ED 37) 23 Dalton-Elliot Highway: Milepost 3,250,000 24 28 to 72 Rehabilitation and 25 Paving (ED 36) 26 Edgerton Highway: Chitina Bike 490,000 27 and Pedestrian Facility (ED 35) 28 Elliott Highway: Milepost 127 to 2,500,000 29 131 Reconstruction and Surfacing 30 (ED 36) 31 Emmonak: Community Roads (ED 38) 1,100,000

01 Fairbanks: 2nd and Wilbur 280,000 02 Reconstruction (ED 30) 03 Fairbanks: Airport and Cushman 2,720,000 04 Intersection Improvements (ED 31) 05 Fairbanks: Catalytic Converter 540,000 06 Replacement Pilot Project (ED 31) 07 Fairbanks: Chena River Bike 2,745,000 08 Trail (ED 31) 09 Fairbanks: Courthouse Traffic 275,000 10 Revisions (ED 31) 11 Fairbanks: Electrical Plug-In 290,000 12 and Operation Program (ED 31) 13 Fairbanks: Geist Road and 480,000 14 University Intersection 15 Improvements (ED 29) 16 Fairbanks: Johansen Expressway 125,000 17 and Peger Road Off-Ramp 18 Improvements (ED 29-34) 19 Fairbanks: Lavelle Young 150,000 20 Wheelhouse Siting (ED 30) 21 Fairbanks: Light Emitting Diode 315,000 22 Signal Installation (ED 29-34) 23 Fairbanks: University of Alaska - 410,000 24 Fairbanks New Geist Access 25 (ED 29) 26 Glenn Highway: Milepost 100 to 22,700,000 27 109 Reconstruction - Caribou 28 Creek (ED 27) 29 Glenn Highway: Milepost 30 to 34 2,000,000 30 Rehabilitation - Knik River to 31 Parks Highway (ED 27)

01 Glenn Highway: Milepost 68 to 84 2,970,000 02 Reconstruction - Chickaloon 03 (ED 27) 04 Glenn Highway: Milepost 92 to 97 1,250,000 05 Reconstruction - Cascade to 06 Hicks Creek (ED 27) 07 Glennallen: Glenn Highway Bike 1,260,000 08 Path (ED 35) 09 Homer: Bartlett and Hohe Street 310,000 10 Rehabilitation (ED 7) 11 Homer: East End Road Milepost 500,000 12 0.0 to 3.75 Rehabilitation 13 (ED 99) 14 Homer: Spit Pedestrian Pathway - 600,000 15 Phase 2 (ED 7) 16 Igiugig: Sanitation Road (ED 40) 185,000 17 Juneau: Egan Intersection 9,000,000 18 Improvements (Tenth Street) 19 (ED 3) 20 Kenai Peninsula Borough: Deep 620,000 21 Creek Beach Access Improvement 22 (ED 7) 23 Kenai: Kenai Spur Road Unity 675,000 24 Trail Pedestrian and Bike Path 25 (ED 9) 26 Kenai: Spur Road Extension (ED 9) 5,800,000 27 Ketchikan: Acquire Three New 280,000 28 Busses (ED 1) 29 Ketchikan: North Tongass Highway 900,000 30 - Ward Cove to Whipple Creek 31 (ED 1)

01 Ketchikan: Tongass - Main and 165,000 02 Mill Signal Installation (ED 1) 03 Ketchikan: Tongass - Third 10,000,000 04 Avenue Extension Completion 05 (ED 1) 06 Ketchikan: Tongass - Viaducts 5,750,000 07 Replacement and Rehabilitation 08 (ED 1) 09 Kodiak: Pasagshak Road 439,500 10 Realignment and Improvement 11 (ED 6) 12 Kotzebue: Dust Control 1,250,000 13 Demonstration Project (ED 37) 14 Kotzebue: Shore Avenue 10,620,000 15 Rehabilitation and Erosion 16 Protection (ED 37) 17 Lower Yukon Trail Staking (ED 38) 105,000 18 Mat-Su: Hatcher Pass: Scenic 2,300,000 19 Overlook & Trailhead 20 Construction - Phase 2 (ED 27) 21 Mat-Su: Hatcher Pass - Phase 1 2,000,000 22 (ED 99) 23 Mat-Su: Knik-Goose Bay Road 1,000,000 24 Rehabilitation (ED 28) 25 Mitkof Highway: Ferry Terminal 1,500,000 26 South Resurfacing (ED 2) 27 Nenana: Port Access (ED 36) 930,000 28 Nome: Nome-Council Road - 385,000 29 Solomon Wayside (ED 38) 30 Nome: Rocker Gulch Wayside 100,000 31 (ED 38)

01 North Pole: Bike Trail 160,000 02 Rehabilitation and Connections 03 (ED 34) 04 North Tongass Highway Pavement 1,400,000 05 Restoration (ED 1) 06 Northern Region: ADA Pedestrian 1,900,000 07 Facilities (ED 99) 08 Northway: Road Improvement 400,000 09 (ED 36) 10 Parks Highway: Milepost 206 to 2,600,000 11 210 Rehabilitation - Summit to 12 Cantwell and Jack River Bridge 13 Channel Control (ED 34) 14 Parks Highway: Milepost 276 - 2,025,000 15 Rex Railroad Overcrossing (ED 34) 16 Parks Highway: Milepost 351 to 5,000,000 17 356 Rehabilitation (ED 34) 18 Parks Highway: Milepost 37 to 44 5,700,000 19 - Church Street to Seward 20 Meridian Road Rehabilitation 21 (ED 27) 22 Parks Highway: Milepost 67-72 8,500,000 23 Rehabilitation - White's 24 Crossing to Willow (ED 28) 25 Parks Highway: Nenana Canyon 5,300,000 26 Safety/Access Improvements - 27 Phase 2 (ED 34) 28 Parks Highway: Parks Highway and 50,700,000 29 Glenn Highway Interchange (ED 26) 30 Pedro Bay: Bridge Replacement 300,000 31 (ED 40)

01 Petersburg: Mitkof Highway 2,200,000 02 Coastal Path (ED 2) 03 Rampart Road Eureka Connector 439,500 04 (ED 36) 05 Richardson Highway: Milepost 127 180,000 06 - Gulkana River Wayside (ED 35) 07 Richardson Highway: Milepost 203 230,000 08 to 206 Reconstruction - McCallum 09 Creek to Rainbow Mountain (ED 35) 10 Richardson Highway: Milepost 275 3,500,000 11 North Erosion Control (ED 35) 12 Richardson Highway: Milepost 306 150,000 13 Birch Lake Wayside (ED 35) 14 Richardson Highway: Milepost 357 375,000 15 - Badger Road Interchange (ED 35) 16 Richardson Highway: Milepost 357 1,400,000 17 - Fairbanks New Weigh Station 18 (ED 35) 19 Richardson Highway: Milepost 360 725,000 20 - Old Richardson Exit Ramp 21 (ED 10-25) 22 Right of Way Permitting and 318,500 23 Project Development Management 24 System (ED 99) 25 Seward Highway: Milepost 0.0 to 3,600,000 26 8 Reconstruction and Pathway - 27 Seward to Grouse Creek Canyon 28 (ED 8) 29 Seward Highway: Turnagain Pass 350,000 30 Reststop (ED 8) 31 Seward: Harbor Pedestrian 675,000

01 Pathway (ED 8) 02 Seward: Port Avenue 1,320,000 03 Rehabilitation (ED 8) 04 Sitka: Harbor Drive Lighting, 420,000 05 Pedestrian and Bicycle 06 Improvements (ED 2) 07 Southeast Alaska Transportation 140,000 08 Plan Implementation Management 09 (ED 99) 10 Southeast Region: Light Emitting 470,000 11 Diode Signal Installation (ED 99) 12 St. Mary's: Airport Road 925,000 13 Rehabilitation (ED 38) 14 Statewide: Air Quality Public 75,000 15 Education (ED 99) 16 Statewide: Annual Planning Work 6,500,000 17 Program (ED 99) 18 Statewide: Bridge Inventory, 3,700,000 19 Inspection, Monitoring, 20 Rehabilitation, and Replacement 21 Program (ED 99) 22 Statewide: Bridge Scour 1,150,000 23 Monitoring and Retrofit Program 24 (ED 99) 25 Statewide: Civil Rights Program 200,000 26 (ED 99) 27 Statewide: Comprehensive 227,500 28 Document Management System 29 (ED 99) 30 Statewide: Culvert Repair or 115,000 31 Replace Project (ED 99)

01 Statewide: Hightower Lighting 2,800,000 02 System Replacement (ED 99) 03 Statewide: Highway Data 1,100,000 04 Equipment Acquisition and 05 Installation (ED 99) 06 Statewide: Highway Fuel Tax 100,000 07 Evasion (ED 99) 08 Statewide: National Highway 420,000 09 Institute and Transit Institute 10 Training (ED 99) 11 Statewide: National Highway 14,000,000 12 System and Bridge Refurbishment 13 (ED 99) 14 Statewide: National Highway 2,050,000 15 System Highway Safety 16 Improvement Program (HSIP) 17 (ED 99) 18 Statewide: Non-National Highway 13,000,000 19 System and Bridge Refurbishment 20 (ED 99) 21 Statewide: Non-National Highway 1,890,000 22 System Highway Safety 23 Improvement Program (HSIP) 24 (ED 99) 25 Statewide: Public Transportation 270,000 26 Social Service Van Replacement 27 (ED 99) 28 Statewide: Research Program 1,600,000 29 (ED 99) 30 Statewide: Road Surface 12,800,000 31 Treatments (ED 99)

01 Statewide: Rural Alaska Training 800,000 02 Initiative (ED 99) 03 Statewide: Scenic Byways Grants 500,000 04 (ED 99) 05 Statewide: Scenic Viewshed 550,000 06 Enhancement (ED 99) 07 Statewide: Seismic Retrofit - 1,700,000 08 Bridges (ED 99) 09 Statewide: Urban Planning 1,300,000 10 Program (ED 99) 11 Steese Highway: Fox New Weigh 280,000 12 Station (ED 33) 13 Steese Highway: Pedro Monument 315,000 14 Historical Wayside (ED 33) 15 Sterling Highway: Milepost 161.4 350,000 16 - Erosion Protection (ED 7) 17 Sterling Highway: Soldotna Urban 960,000 18 & Kenai River Bridge #0671 19 Replacement Phase 2 (ED 8) 20 Stevens Village: Sanitation Road 915,000 21 (ED 36) 22 Surface Transportation 71,200,000 23 Preconstruction (ED 99) 24 Talkeetna: Parking Lot and 375,800 25 Pedestrian Safety Access (ED 28) 26 Tok Cutoff: Milepost 110 to 124 8,500,000 27 Reconstruction - Clearwater 28 Creek to Tok (ED 36) 29 Unalaska: Airport Beach Road 725,000 30 Pathway Phase II (ED 40) 31 Unalaska: East Point Ballyhoo 750,000

01 Road Rehabilitation - Phase 1 02 (ED 40) 03 Unalaska: South Channel Bridge 2,200,000 04 Construction (ED 40) 05 Whittier: Ferry Access Road 1,400,000 06 (ED 35) 07 Whittier: Maintenance and 1,900,000 08 Operations (ED 35) 09 * * * * * * * * * * * * 10 * * * * * * University of Alaska * * * * * * 11 * * * * * * * * * * * * 12 Air Traffic Control Simulator 2,500,000 2,500,000 13 (ED 99) 14 Arctic Region Supercomputer 30,000,000 30,000,000 15 Purchase (ED 29-34) 16 Safety and Highest Priority 3,575,000 1,875,000 1,700,000 17 Renewal and Replacement/ 18 Telecommunications Equipment 19 (ED 99) 20 Systemwide Facility Renewal and 2,000,000 2,000,000 21 Renovation to Accomodate 22 Partnership Projects (ED 99) 23 Systemwide Small Planning, 2,500,000 2,500,000 24 Design and Construction Projects 25 (ED 99) 26 UA Museum Expansion Project 4,000,000 4,000,000 27 (ED 29-34) 28 University of Alaska Small 450,000 450,000 29 Business Development Center 30 (ED 10-25)

01 * * * * * * * * * * * * 02 * * * * * * Alaska Court System * * * * * * 03 * * * * * * * * * * * * 04 Automated Case Management System 1,750,000 1,750,000 05 - Phase 2 (ED 99) 06 Capital Replacement Equipment 375,000 375,000 07 (ED 99) 08 * * * * * * * * * * * * 09 * * * * * * Municipal Capital Matching Grants (AS 37.06.010) * * * * * * 10 * * * * * * * * * * * * 11 Akutan Underground Pipeline 25,000 25,000 12 Replacement, Phase 2 (ED 40) 13 Alakanuk Purchase Refuse Pick Up 25,000 25,000 14 Truck (ED 38) 15 Aleknagik North Shore Sludge 25,548 25,548 16 Lagoon and Landfill Relocation 17 and Road Construction (ED 39) 18 Aleutians East Borough Nelson 25,000 25,000 19 Lagoon Community Center Building 20 Construction (ED 40) 21 Allakaket City Van Purchase 25,275 25,275 22 (ED 36) 23 Ambler Community Facilities 25,064 25,064 24 Renovation (ED 37) 25 Anchorage 2001 Major Facility 1,250,000 1,250,000 26 Upgrade Projects (ED 10) 27 Anchorage Alaska Center for the 525,000 525,000 28 Performing Arts Rehearsal Hall 29 Construction and Design (ED 10) 30 Anchorage Americans Disabilities 43,035 43,035 31 Act: Improvements to Parks and

01 Recreation Facilities (ED 10) 02 Anchorage Eagle River/Chugiak 350,000 350,000 03 Road and Drainage Rehabilitation 04 (ED 24) 05 Anchorage Elmore Road Upgrade - 700,000 700,000 06 Huffman Road to Dearmoun Road 07 (ED 18) 08 Anchorage Fire Department and 350,000 350,000 09 Emergency Medical Services 10 Communications Upgrade (ED 10) 11 Anchorage Girdwood Road Service 70,000 70,000 12 Area (RSA) - Road and Drainage 13 System Rehabilitation (ED 18) 14 Anchorage Renovation of Existing 1,000,000 1,000,000 15 Fire Facilities (ED 10) 16 Anderson Road Resurfacing Phase 25,000 25,000 17 3 (ED 34) 18 Aniak Purchase of Sewer Pump and 25,000 25,000 19 Controls (ED 36) 20 Atka Heavy Equipment Acquisition 25,000 25,000 21 (ED 40) 22 Barrow Boat Harbor Upgrade 109,000 109,000 23 (ED 37) 24 Bethel City Hall Renovation 112,278 112,278 25 (ED 39) 26 Brevig Mission Post Office 25,000 25,000 27 Building Renovation (ED 38) 28 Bristol Bay Borough Naknek 30,000 30,000 29 Landfill Portable Water Supply 30 (ED 39) 31 Chignik Heavy Equipment Purchase 25,000 25,000

01 (ED 40) 02 Chuathbaluk Equipment Upgrade 10,000 10,000 03 (ED 36) 04 Chuathbaluk Water, Sewer and 15,000 15,000 05 Road Improvements (ED 36) 06 Cold Bay Community Center 25,000 25,000 07 Building Construction (ED 40) 08 Cordova Centennial Building 59,519 59,519 09 Repair and Addition (ED 35) 10 Craig JT Brown Marine Industrial 52,210 52,210 11 Park (ED 5) 12 Delta Junction Television 25,000 25,000 13 Equipment Purchase Phase 3 14 (ED 35) 15 Denali Borough Chamber Building 9,000 9,000 16 Construction Completion Phase 4 17 (ED 34) 18 Denali Borough Hockey Rink 15,000 15,000 19 Paving (ED 34) 20 Denali Borough Panguingue Creek: 9,000 9,000 21 Completion of Fire Hall 22 Construction and Community 23 Building Well (ED 34) 24 Dillingham Water Facility 56,197 56,197 25 Improvements (ED 39) 26 Eagle City Building Repairs and 10,000 10,000 27 Improvements (ED 36) 28 Egegik Medical Clinic 25,000 25,000 29 Construction (ED 40) 30 Elim Survey and Platting of 25,000 25,000 31 Village (ED 38)

01 Emmonak Repair Fire Station 25,001 25,001 02 Foundation and Repair Door and 03 Replace, Refurbish and Repair 04 City Equipment (ED 38) 05 Fairbanks Block 39 Parking 543,935 543,935 06 Facility Construction (ED 30) 07 Fairbanks North Star Borough 65,231 65,231 08 Birch Hill Park Road and Parking 09 Improvements (ED 29-34) 10 Fairbanks North Star Borough 140,000 140,000 11 Boroughwide Fire Life and Safety 12 (ED 29-34) 13 Fairbanks North Star Borough 42,000 42,000 14 Defibrillator Replacement (ED 29- 15 34) 16 Fairbanks North Star Borough 98,000 98,000 17 Emergency Medical Services - 18 Ambulance Replacement (ED 29-34) 19 Fairbanks North Star Borough 11,550 11,550 20 Install Lights at Tot Lot in 21 Alaskaland Theme Park (ED 29-34) 22 Fairbanks North Star Borough Joy 56,000 56,000 23 Elementary School Clerestory 24 Window Repairs (ED 29-34) 25 Fairbanks North Star Borough 175,000 175,000 26 Mary Siah Recreational Center 27 Install Direct Digital Controls 28 for HVAC System (ED 29-34) 29 Fairbanks North Star Borough 84,000 84,000 30 Pearl Creek Elementary School 31 Repair and Remodel Skylights

01 (ED 29-34) 02 Fairbanks North Star Borough 33,600 33,600 03 Tanana River Annual Levee 04 Repairs (ED 29-34) 05 Fairbanks North Star Borough Two 77,000 77,000 06 Rivers Elemementary School Fire 07 Water Improvements (ED 29-34) 08 Fairbanks North Star Borough Two 52,500 52,500 09 Rivers Elementary School - 10 Replace Septic Line (ED 29-34) 11 False Pass Construction of 25,000 25,000 12 Public Safety Building (ED 40) 13 Fort Yukon Community Roads and 33,000 33,000 14 Fire Upgrades (ED 36) 15 Goodnews Bay Dumpsite 25,000 25,000 16 Improvements (ED 39) 17 Grayling Washeteria Building 9,500 9,500 18 Construction (ED 36) 19 Haines Borough Museum Collection 10,000 10,000 20 Storage Upgrade (ED 5) 21 Haines Borough Safety, Americans 23,974 23,974 22 Disabilities Act and Exterior 23 Library Improvements (ED 5) 24 Haines Public Works Building 52,232 52,232 25 Construction (ED 5) 26 Holy Cross Heavy Equipment 30,104 30,104 27 Purchase, Repair or Upgrade 28 (ED 36) 29 Homer Animal Shelter 101,367 101,367 30 Construction (ED 7) 31 Hoonah Road Paving and Community 25,096 25,096

01 Wide Improvements (ED 5) 02 Houston Upgrade and Blacktop 25,021 25,021 03 King Arthur to White Rabbit 04 Roads (ED 28) 05 Hughes Purchase of Elder Vehicle 26,322 26,322 06 (ED 36) 07 Huslia Multi-Heavy Equipment 25,000 25,000 08 Upgrade and Purchase (ED 36) 09 Hydaburg Community Facilities 10,000 10,000 10 and Equipment (ED 5) 11 Hydaburg Road Upgrade and 15,000 15,000 12 Equipment Repairs (ED 5) 13 Juneau Deferred Building 264,000 264,000 14 Maintenance (ED 3) 15 Juneau Essential Building 171,000 171,000 16 Repairs (ED 3) 17 Juneau Underground Fuel Storage 76,000 76,000 18 Tanks and Contaminated Sites 19 Clean-up (ED 3) 20 Kachemak Homer Animal Shelter 25,000 25,000 21 Construction (ED 7) 22 Kake Community Office Upgrade 25,000 25,000 23 (ED 5) 24 Kaktovik Boat Dock Construction 10,000 10,000 25 (ED 37) 26 Kaktovik Community Building 15,000 15,000 27 Upgrade (ED 37) 28 Kaltag City Equipment Repairs 25,000 25,000 29 and Replacement (ED 36) 30 Kasaan Fuel Farm Repairs and 51,427 51,427 31 Equipment Puchase (ED 5)

01 Kenai Peninsula Borough 494,848 494,848 02 Boroughwide Road Improvements 03 Projects (ED 7-9) 04 Kenai Street Improvement Program 143,379 143,379 05 (ED 9) 06 Ketchikan Gateway Borough 108,218 108,218 07 Restroom Construction and 08 Improvements (ED 1) 09 Ketchikan Road and Street 170,751 170,751 10 Improvements (ED 1) 11 King Cove Upgrade of Septic Tank 25,001 25,001 12 and Pump Equipment (ED 40) 13 Kivalina Community Relocation 25,000 25,000 14 Phase 3 (ED 37) 15 Klawock Harbor Improvements 21,668 21,668 16 (ED 5) 17 Kodiak Fire Engine Transport 142,000 142,000 18 Capable Purchase (ED 6) 19 Kodiak Island Borough School 124,471 124,471 20 Facilities Upgrade and Repair 21 (ED 6) 22 Kotzebue Repair Fire Training 71,523 71,523 23 Center and Construct Vehicle 24 Warm Storage (ED 37) 25 Kupreanof Completion of Mapping 15,000 15,000 26 the City (ED 2) 27 Kupreanof Fire Suppression 10,000 10,000 28 Equipment for Generator Shed and 29 City Community Building (ED 2) 30 Lake and Peninsula Borough 8,648 8,648 31 Kokhanok Water and Sewer Supply

01 Storage Building (ED 40) 02 Lake and Peninsula Borough Pedro 8,649 8,649 03 Bay Water System Improvements 04 (ED 40) 05 Lake and Peninsula Borough Port 8,648 8,648 06 Alsworth Office Complex 07 Construction (ED 40) 08 Larsen Bay: Mini-Hydro Repairs 25,000 25,000 09 (ED 6) 10 Manokotak Purchase a Grader 26,321 26,321 11 (ED 39) 12 Matanuska Susitna Borough 175,000 175,000 13 Hatcher Pass Water and Electric 14 Distribution (ED 26-28) 15 Matanuska Susitna Borough Port 315,000 315,000 16 MacKenzie Intermodal Facility 17 (ED 26-28) 18 Matanuska Susitna Borough 140,000 140,000 19 Replace Ambulance and Rescue 20 Unit and Emergency Equipment 21 (ED 26-28) 22 Matanuska Susitna Borough Road 147,334 147,334 23 Upgrade and Paving (ED 26-28) 24 Matanuska Susitna Borough 21,000 21,000 25 Talkeetna Historic Preservation 26 (ED 26-28) 27 McGrath Multi-Purpose Facility 25,000 25,000 28 Upgrade (ED 36) 29 Metlakatla Ammonia Gas 33,530 33,530 30 Evaporator Condenser Replacement 31 (ED 5)

01 Napaskiak Clinic Renovation 25,156 25,156 02 (ED 39) 03 Nenana Fire Truck Purchase 25,000 25,000 04 (ED 36) 05 New Stuyahok Fire Truck and 25,000 25,000 06 Equipment Purchase (ED 39) 07 Newhalen Sewage Lagoon 12,500 12,500 08 Improvements (ED 40) 09 Newhalen Well House and Pump 12,500 12,500 10 House Improvements (ED 40) 11 Nikolai Generator Upgrade and 25,000 25,000 12 Bulk Fuel Farm Upgrade (ED 36) 13 Nome City Hall Expansion (ED 38) 22,727 22,727 14 Nome Library and Museum Elevator 41,000 41,000 15 Upgrade (ED 38) 16 Nome Library Security System 24,495 24,495 17 Purchase and Door Replacement 18 (ED 38) 19 Noorvik Landfill Design and 15,000 15,000 20 Clean Up (ED 37) 21 Noorvik Solid Waste Collection 10,000 10,000 22 Vehicle (ED 37) 23 Northwest Arctic Borough Design 25,160 25,160 24 and Construct New Borough Office 25 (ED 37) 26 Nulato Purchase of VPSO Vehicle 25,000 25,000 27 and Equipment (ED 36) 28 Palmer - Community Center 110,734 110,734 29 Improvements (Train Depot) 30 (ED 27) 31 Palmer - Covered Walkway at 10,000 10,000

01 Palmer Police Department (ED 27) 02 Pelican Harbor Rejuvenation: 22,110 22,110 03 Breakwater Readiness Renovation, 04 Expansion and Remodel (ED 5) 05 Petersburg Swimming Pool 83,631 83,631 06 Replacement (ED 2) 07 Pilot Point Fuel Farm Upgrade 25,000 25,000 08 (ED 40) 09 Point Hope Day Care Expansion 25,001 25,001 10 (ED 37) 11 Port Alexander Continued Upgrade 25,000 25,000 12 and Repair of Water System and 13 Fire Sheds (ED 5) 14 Ruby New Generator and Back Up 25,159 25,159 15 Generator Building (ED 36) 16 Saint George Public Building 25,000 25,000 17 Roof Replacement (ED 40) 18 Saint Mary's City Vehicle 31,403 31,403 19 Purchase (ED 38) 20 Saint Michael Multi-Heavy 25,000 25,000 21 Equipment and Road Upgrade 22 (ED 38) 23 Saint Paul South Ellerman 25,000 25,000 24 Electric Installation (ED 40) 25 Sand Point Acquisition and/or 25,000 25,000 26 Equipment Repair (ED 40) 27 Saxman Community Center 25,000 25,000 28 Equipment Purchase Completion 29 (ED 1) 30 Scammon Bay Cemetary Fence 25,092 25,092 31 Repair (ED 38)

01 Selawik Landfill Access, 26,821 26,821 02 Boardwalk Improvements (ED 37) 03 Seldovia Critical Repair of 25,000 25,000 04 Municipal Buildings (ED 7) 05 Seward Fire Hydrant Upgrade 73,546 73,546 06 (ED 8) 07 Shungnak Heavy Equipment Repair 25,000 25,000 08 (ED 37) 09 Sitka Fire Hall Renovation and/ 177,663 177,663 10 or Construction (ED 2) 11 Skagway Flood Control 25,007 25,007 12 Construction and Engineering 13 (ED 5) 14 Soldotna Sports Center 102,456 102,456 15 Conference Area Improvements 16 (ED 8) 17 Stebbins Snow Fencing 25,001 25,001 18 Construction (ED 38) 19 Tanana Equipment Replacement 25,000 25,000 20 (ED 36) 21 Tenakee Springs City and Harbor 25,000 25,000 22 Fire Protection Equipment 23 Purchase and Replacement (ED 5) 24 Tenakee Springs Recycle Center 10,000 10,000 25 and Shed Construction (ED 5) 26 Thorne Bay Paving and Upgrading 25,000 25,000 27 Roads (ED 5) 28 Toksook Bay Water and Sewer 25,000 25,000 29 Supply Connections (ED 38) 30 Unalakleet Purchase Police 25,024 25,024 31 Vehicle (ED 38)

01 Unalaska Community Park 101,961 101,961 02 Development (ED 40) 03 Valdez Old City Dock Fendering 101,538 101,538 04 System Construction (ED 35) 05 Wales Emergency Service 25,000 25,000 06 Equipment Purchase (ED 37) 07 Wasilla Public Facilities 106,677 106,677 08 Improvements (ED 26) 09 White Mountain Community 25,000 25,000 10 Facility Upgrades (ED 38) 11 Whittier Consolidated Municipal 25,000 25,000 12 Facility Construction and/or 13 Renovation (ED 35) 14 Wrangell Emergency and Safety 72,564 72,564 15 Vehicle Replacement (ED 2) 16 Yakutat Equipment and Salvage 8,002 8,002 17 Shed Construction (ED 5) 18 Yakutat Teacher Housing 32,500 32,500 19 Construction (ED 5) 20 * * * * * * * * * * * * 21 * * * * * * Unincorp Comm. Cap Match Grant (AS 37.06.020) * * * * * * 22 * * * * * * * * * * * * 23 Atmautluak Erosion Control 51,404 51,404 24 (ED 39) 25 Birch Creek Purchase of Loader 25,075 25,075 26 (ED 36) 27 Chalkyitsik Heavy Equipment 24,999 24,999 28 Storage Shed Construction (ED 36) 29 Chitina Volunteer Fire 25,000 25,000 30 Department Building Extension 31 (ED 36)

01 Circle Village Woodworking and 25,000 25,000 02 Metalworking Shop Construction 03 (ED 36) 04 Copper Center Gymnasium 25,000 25,000 05 Construction (ED 36) 06 Dry Creek Multipurpose Building 25,000 25,000 07 Construction Phase 4 (ED 36) 08 Eagle Village Community Center 25,216 25,216 09 and Office Site Telephone System 10 Purchase (ED 36) 11 Edna Bay Road/Dock Upgrade East 25,000 25,000 12 and West (ED 5) 13 Elfin Cove Upgrading Community 25,222 25,222 14 Facilities (ED 5) 15 Evansville Septic Tank Pumping 24,999 24,999 16 Truck Purchase Phase 2 (ED 36) 17 Glennallen Defibrillator 10,265 10,265 18 Purchase for Ambulance Service 19 (ED 35) 20 Glennallen Visitor Welcome Signs 15,000 15,000 21 Purchase and Repair or Replace 22 Exit Signs (ED 35) 23 Gulkana RV Park Construction 25,000 25,000 24 Completion, Phase 2 (ED 36) 25 Gustavus Ongoing Equipment 24,585 24,585 26 Purchases (ED 5) 27 Hollis Clark Bay Penninsula Road 25,000 25,000 28 System (ED 5) 29 Hyder Community Facilities and 24,999 24,999 30 Equipment (ED 1) 31 Kasigluk Erosion Control (ED 39) 25,000 25,000

01 Kenny Lake Community Hall and 47,400 47,400 02 Library Addition Upgrade (ED 35) 03 Kwigillingok Community Boardwalk 25,000 25,000 04 Repairs (ED 39) 05 Lime Village Equipment Purchase 25,002 25,002 06 and Maintenance Facility 07 Construction (ED 36) 08 Manley Hot Springs Community 25,019 25,019 09 Facilities Upgrade (ED 36) 10 Mentasta Lake Emergency Vehicle 51,293 51,293 11 Storage Facility Construction 12 (ED 36) 13 Minto Community Hall 53,314 53,314 14 Construction Phase 4 (ED 36) 15 Naukati West Road Construction 25,000 25,000 16 and Pit Development (ED 5) 17 New Koliganek Landfill and Road 25,024 25,024 18 Upgrades and Equipment Repairs 19 (ED 39) 20 Newtok Pre-School and Village 25,103 25,103 21 Public Safety Officers 22 Facilities Design and 23 Engineering (ED 38) 24 Point Baker Fire Department and 25,000 25,000 25 Emergency Medical Services 26 Equipment (ED 5) 27 Slana Community Building 10,000 10,000 28 Improvements (ED 36) 29 Slana Community Road 15,000 15,000 30 Improvements (ED 36) 31 Takotna Utility Office Lodge 25,000 25,000

01 Construction (ED 36) 02 Tanacross Multi-Community 25,014 25,014 03 Facilities Improvement and 04 Renovation (ED 36) 05 Tazlina Old School Loop Road 25,000 25,000 06 Improvements (ED 35) 07 Tetlin Road Construction and 25,059 25,059 08 Improvements Phase 4 (ED 36) 09 Tok Library & Senior Site 21,500 21,500 10 Upgrades (ED 36) 11 Tuluksak Power Utility 25,329 25,329 12 Construction (ED 36) 13 Tuntutuliak Community Hall 35,185 35,185 14 Foundation Replacement (ED 39) 15 Tuntutuliak Jail House 16,466 16,466 16 Completion (ED 39) 17 * Sec. 2. The following sets out the funding by agency for the appropriations made in sec. 1 of this Act. 18 Department of Administration 19 Federal Receipts 14,893,700 20 General Fund Receipts 1,467,000 21 Information Service Fund 2,720,900 22 *** Total Agency Funding *** $19,081,600 23 Department of Community and Economic Development 24 Federal Receipts 68,492,835 25 General Fund Match 300,000 26 General Fund Receipts 7,462,100 27 Oil/Hazardous Response Fund 1,600,000 28 AHFC Dividends 1,500,000 29 Receipt Supported Services 300,000 30 *** Total Agency Funding *** $79,654,935 31 Department of Corrections

01 Federal Receipts 100,000 02 General Fund Receipts 1,650,000 03 *** Total Agency Funding *** $1,750,000 04 Department of Education and Early Development 05 General Fund Receipts 1,900,000 06 *** Total Agency Funding *** $1,900,000 07 Department of Environmental Conservation 08 Federal Receipts 57,444,600 09 Oil/Hazardous Response Fund 5,500,000 10 Storage Tank Assistance Fund 1,000,000 11 AHFC Dividends 28,250,000 12 *** Total Agency Funding *** $92,194,600 13 Department of Fish and Game 14 Federal Receipts 13,198,100 15 General Fund Receipts 875,000 16 Fish and Game Fund 600,000 17 Receipt Supported Services 115,000 18 *** Total Agency Funding *** $14,788,100 19 Office of the Governor 20 Federal Receipts 1,350,000 21 General Fund Receipts 637,789 22 *** Total Agency Funding *** $1,987,789 23 Department of Health and Social Services 24 Federal Receipts 2,699,200 25 General Fund Match 200,000 26 General Fund Receipts 9,185,400 27 Statutory Designated Program Receipts 125,000 28 *** Total Agency Funding *** $12,209,600 29 Department of Labor and Workforce Development 30 AHFC Dividends 100,000 31 *** Total Agency Funding *** $100,000 32 Department of Military and Veterans Affairs 33 Federal Receipts 3,254,400

01 General Fund Match 15,600 02 General Fund Receipts 456,700 03 *** Total Agency Funding *** $3,726,700 04 Department of Natural Resources 05 Federal Receipts 18,850,000 06 General Fund Match 50,000 07 General Fund Receipts 1,915,500 08 Agricultural Loan Fund 100,000 09 Statutory Designated Program Receipts 12,420,800 10 State Land Disposal Income Fund 145,000 11 Receipt Supported Services 225,000 12 *** Total Agency Funding *** $33,706,300 13 Department of Public Safety 14 Federal Receipts 6,550,000 15 General Fund Match 65,900 16 General Fund Receipts 4,489,800 17 Oil/Hazardous Response Fund 50,000 18 *** Total Agency Funding *** $11,155,700 19 Department of Revenue 20 Federal Receipts 15,340,000 21 General Fund/Program Receipts 510,000 22 Permanent Fund Dividend Fund 125,000 23 AHFC Dividends 18,020,460 24 *** Total Agency Funding *** $33,995,460 25 Department of Transportation/Public Facilities 26 Federal Receipts 631,017,739 27 General Fund Match 49,649,400 28 General Fund Receipts 10,697,400 29 Highway Working Capital Fund 11,800,000 30 International Airport Revenue Fund 43,529,475 31 Capital Improvement Project Receipts 1,600,000 32 Statutory Designated Program Receipts 12,000,000 33 International Airports Construction Fund 113,182,800

01 *** Total Agency Funding *** $873,476,814 02 University of Alaska 03 Federal Receipts 33,500,000 04 General Fund Receipts 6,325,000 05 University Restricted Receipts 3,500,000 06 Alaska Commission on Postsecondary Education Dividend 1,700,000 07 *** Total Agency Funding *** $45,025,000 08 Alaska Court System 09 General Fund Receipts 2,125,000 10 *** Total Agency Funding *** $2,125,000 11 Municipal Capital Matching Grants (AS 37.06.010) 12 Municipal Matching Grant Fund 11,850,403 13 *** Total Agency Funding *** $11,850,403 14 Unincorp Comm. Cap Match Grant (AS 37.06.020) 15 Unincorporated Matching Grant Fund 1,002,472 16 *** Total Agency Funding *** $1,002,472 17 The following summarizes the funding sources for the appropriations made in section 1 of this act. 18 Federal Receipts 866,690,574 19 General Fund Match 50,280,900 20 General Fund Receipts 49,186,689 21 General Fund/Program Receipts 510,000 22 Agricultural Loan Fund 100,000 23 Fish and Game Fund 600,000 24 Highway Working Capital Fund 11,800,000 25 International Airport Revenue Fund 43,529,475 26 University Restricted Receipts 3,500,000 27 Permanent Fund Dividend Fund 125,000 28 Oil/Hazardous Response Fund 7,150,000 29 Capital Improvement Project Receipts 1,600,000 30 Storage Tank Assistance Fund 1,000,000 31 Information Service Fund 2,720,900 32 Municipal Matching Grant Fund 11,850,403 33 Unincorporated Matching Grant Fund 1,002,472

01 Statutory Designated Program Receipts 24,545,800 02 International Airports Construction Fund 113,182,800 03 AHFC Dividends 47,870,460 04 Alaska Commission on Postsecondary Education Dividend 1,700,000 05 State Land Disposal Income Fund 145,000 06 Receipt Supported Services 640,000 07 * * * * * Total Budget * * * * * $1,239,730,473 08 (SECTION 3 OF THIS ACT BEGINS ON PAGE 64)

01 * Sec. 3. ALASKA CLEAN WATER FUND. The sum of $9,650,400 is appropriated to 02 the Alaska clean water fund (AS 46.03.032) for the Alaska clean water loan program from the 03 following sources: 04 Alaska clean water fund revenue bond receipts $1,608,400 05 Federal receipts 8,042,000 06 * Sec. 4. ALASKA DRINKING WATER FUND. The sum of $9,367,600 is appropriated 07 to the Alaska drinking water fund (AS 46.03.036) for the Alaska drinking water loan program 08 from the following sources: 09 Alaska drinking water fund revenue bond receipts $ 800,000 10 Federal receipts 7,806,300 11 General fund match 761,300 12 * Sec. 5. ALASKA INDUSTRIAL DEVELOPMENT AND EXPORT AUTHORITY 13 DIVIDEND. The sum of $17,500,000 that is anticipated to be declared available by the 14 Alaska Industrial Development and Export Authority for appropriation as the fiscal year 2002 15 dividend from the unrestricted balance in the Alaska Industrial Development and Export 16 Authority revolving fund (AS 44.88.060) is appropriated in secs. 6(a) and 11(a) of this Act. 17 * Sec. 6. CAPITAL PROJECT MATCHING GRANT PROGRAMS. (a) The sum of 18 $15,000,000 is appropriated from the Alaska Industrial Development and Export Authority 19 revolving fund (AS 44.88.060), as provided in sec. 5 of this Act, to the following funds in the 20 Department of Community and Economic Development, in the amounts stated, to provide 21 capital project matching grants: 22 Municipal capital project matching grant $13,175,000 23 fund (AS 37.06.010(b)) 24 Unincorporated community capital project 1,825,000 25 matching grant fund (AS 37.06.020(b)) 26 (b) An amount equal to the interest earned on money in the individual grant accounts 27 in the municipal capital project matching grant fund (AS 37.06.010(b)) and the 28 unincorporated community capital project matching grant fund (AS 37.06.020(b)) is 29 appropriated from the general fund to the respective funds. The interest is calculated using 30 the average percentage interest rate received by other accounts in the state's general 31 investment fund that received interest during fiscal year 2001. The appropriations made by

01 this subsection are allocated pro rata to each individual grant account based on the balance in 02 the account on the close of business on June 30, 2001. 03 * Sec. 7. DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT. (a) 04 The unexpended balance on June 30, 2001, of the federal receipts from the United States 05 Agency for International Development grant authorized by RPL 08-1-0008 is appropriated to 06 the Department of Community and Economic Development for capital projects under the 07 grant agreement. 08 (b) The unexpended balance on June 30, 2001, of the federal receipts from the United 09 States Department of Commerce, National Marine Fisheries Service, grant authorized by RPL 10 08-1-0061 is appropriated to the Department of Community and Economic Development for 11 capital projects under the grant agreement. 12 * Sec. 8. DEPARTMENT OF FISH AND GAME. The proceeds from the sale of the 13 research vessel R/V Sundance, including parts inventory, are appropriated from the general 14 fund to the Department of Fish and Game for the purchase of a replacement vessel. 15 * Sec. 9. DEPARTMENT OF PUBLIC SAFETY. The proceeds from the sale of three 16 Department of Public Safety aircraft and surplus aircraft parts and accessories are 17 appropriated from the general fund to the Department of Public Safety for the purchase of 18 replacement aircraft. 19 * Sec. 10. FEDERAL AND OTHER PROGRAM RECEIPTS. (a) Federal receipts, 20 designated program receipts as defined in AS 37.05.146(b)(3), and program receipts as 21 defined in AS 37.05.146(b)(4) and (6) that exceed the amounts appropriated by this Act are 22 appropriated conditioned upon compliance with the program review provisions of 23 AS 37.07.080(h). 24 (b) If federal or other program receipts as defined in AS 37.05.146 exceed the 25 estimates appropriated by this Act, the appropriations from state funds for the affected 26 program may be reduced by the excess if the reductions are consistent with applicable federal 27 statutes. 28 (c) If federal or other program receipts as defined in AS 37.05.146 fall short of the 29 estimates appropriated by this Act, the affected appropriation is reduced by the amount of the 30 shortfall in receipts. 31 * Sec. 11. POWER COST EQUALIZATION. (a) The sum of $2,500,000 is appropriated

01 from the Alaska Industrial Development and Export Authority revolving fund 02 (AS 44.88.060), as provided in sec. 5 of this Act, to the power cost equalization and rural 03 electric capitalization fund (AS 42.45.100). 04 (b) It is anticipated that members of the Alaska Industrial Development and Export 05 Authority will authorize the purchase of loans and other assets with an estimated value of 06 $620,000 from the rural economic development initiative fund (AS 44.33.765) as an 07 investment of the Alaska Industrial Development and Export Authority. Conditioned on the 08 authorization to purchase described in this subsection, loans and other assets with an 09 estimated value of $620,000 are appropriated from the rural economic development initiative 10 fund (AS 44.33.765) to the Alaska Industrial Development and Export Authority, rural 11 development initiative fund (AS 44.88.600). The proceeds from the sale are appropriated 12 from corporate receipts to the power cost equalization and rural electric capitalization fund 13 (AS 42.45.100). 14 (c) The amount necessary when added to the appropriations made by (a) and (b) of 15 this section, estimated to be $4,680,000, to result in a total appropriation of $7,800,000 to the 16 power cost equalization and rural electric capitalization fund (AS 42.45.100), is appropriated 17 from the general fund to the power cost equalization and rural electric capitalization fund 18 (AS 42.45.100). 19 * Sec. 12. RURAL ELECTRIFICATION REVOLVING LOAN FUND. Notwithstanding 20 AS 42.45.020(g), the balance of the rural electrification revolving loan fund (AS 42.45.020) 21 on June 30, 2001, is appropriated to the Department of Community and Economic 22 Development for the electrical emergencies program. 23 * Sec. 13. CONSTITUTIONAL BUDGET RESERVE FUND. (a) Deposits in the budget 24 reserve fund (art. IX, sec. 17, Constitution of the State of Alaska) for fiscal year 2001 that 25 were made from subfunds and accounts other than the operating general fund (state 26 accounting system fund number 11100) by operation of art. IX, sec. 17(d), Constitution of the 27 State of Alaska, to repay appropriations from the budget reserve fund are appropriated from 28 the budget reserve fund to the subfunds and accounts from which they were transferred. 29 (b) If the unrestricted state revenue available for appropriation in fiscal year 2002 is 30 insufficient to cover the general fund appropriations made for fiscal year 2002, the amount 31 necessary to balance revenue and general fund appropriations is appropriated to the general

01 fund from the budget reserve fund (art. IX, sec. 17, Constitution of the State of Alaska). 02 (c) The sum of $125,000 is appropriated from the budget reserve fund (art. IX, 03 sec. 17, Constitution of the State of Alaska) to the Department of Revenue, treasury division, 04 for the fiscal year ending June 30, 2002, for investment management fees for the budget 05 reserve fund (art. IX, sec. 17, Constitution of the State of Alaska). 06 (d) The appropriations in (a) - (c) of this section are made under art. IX, sec. 17(c), 07 Constitution of the State of Alaska. 08 * Sec. 14. CAPITAL PROJECT MATCHING GRANTS. (a) Subject to the conditions set 09 out in (c) of this section, the sum of $1,698,680 is appropriated from the appropriate 10 individual grant accounts in the unincorporated community capital project matching grant 11 fund (AS 37.06.020) to the Department of Community and Economic Development for 12 payment as grants under AS 37.06.020 to the following unincorporated communities in the 13 amounts and for the purposes stated: 14 Akiachak Capital projects and improvements $ 25,014 15 Arctic Village Capital projects and improvements 51,290 16 Beaver Capital projects and improvements 26,462 17 Central Capital projects and improvements 112,533 18 Chistochina Capital projects and improvements 25,000 19 Crooked Creek Capital projects and improvements 24,999 20 Deltana Capital projects and improvements 25,001 21 Dot Lake Services Capital projects and improvements 25,001 22 Dot Lake Village Capital projects and improvements 27,713 23 Four Mile Road Capital projects and improvements 25,034 24 Gakona Capital projects and improvements 141,958 25 Healy Lake Capital projects and improvements 25,400 26 Kipnuk Capital projects and improvements 24,999 27 Klukwan Capital projects and improvements 26,072 28 Kongiganak Capital projects and improvements 25,191 29 Lake Minchumina Capital projects and improvements 53,184 30 McCarthy Capital projects and improvements 54,431 31 Nelchina/Mendeltna Capital projects and improvements 25,072

01 Nikolski Capital projects and improvements 36,563 02 Northway Capital projects and improvements 51,725 03 Oscarville Capital projects and improvements 53,262 04 Paxson Capital projects and improvements 157,189 05 Pitka's Point Capital projects and improvements 25,000 06 Port Protection Capital projects and improvements 51,346 07 Rampart Capital projects and improvements 51,881 08 Red Devil Capital projects and improvements 25,000 09 Silver Springs Capital projects and improvements 25,035 10 Slana Capital projects and improvements 24,999 11 Slana League Capital projects and improvements 51,347 12 Sleetmute Capital projects and improvements 25,127 13 Stevens Village Capital projects and improvements 24,999 14 Stony River Capital projects and improvements 26,729 15 Tatitlek Capital projects and improvements 25,002 16 Tolsona Capital projects and improvements 92,053 17 Tununak Capital projects and improvements 51,756 18 Twin Hills Capital projects and improvements 51,369 19 Venetie Capital projects and improvements 53,935 20 Whale Pass Capital projects and improvements 25,009 21 Wiseman Capital projects and improvements 25,000 22 (b) Subject to the conditions set out in (c) of this section, the sum of $1,547,831 is 23 appropriated from the appropriate individual grant accounts in the municipal capital project 24 matching grant fund (AS 37.06.010) to the Department of Community and Economic 25 Development for payment as grants under AS 37.06.010 to the following municipalities in the 26 amounts and for the purposes stated: 27 Akhiok Capital projects and improvements $26,027 28 Akiak Capital projects and improvements 25,657 29 Anaktuvuk Pass Capital projects and improvements 37,322 30 Angoon Capital projects and improvements 25,230 31 Anvik Capital projects and improvements 25,000

01 Atqasuk Capital projects and improvements 31,298 02 Bettles Capital projects and improvements 25,000 03 Buckland Capital projects and improvements 23,873 04 Chefornak Capital projects and improvements 25,000 05 Chevak Capital projects and improvements 26,323 06 Coffman Cove Capital projects and improvements 25,000 07 Deering Capital projects and improvements 25,000 08 Diomede Capital projects and improvements 25,004 09 Eek Capital projects and improvements 31,508 10 Ekwok Capital projects and improvements 25,010 11 Fort Yukon Capital projects and improvements 52,073 12 Galena Capital projects and improvements 25,054 13 Gambell Capital projects and improvements 25,000 14 Golovin Capital projects and improvements 35,264 15 Hooper Bay Capital projects and improvements 28,483 16 Kiana Capital projects and improvements 25,000 17 Kobuk Capital projects and improvements 25,000 18 Kotlik Capital projects and improvements 30,000 19 Koyuk Capital projects and improvements 25,808 20 Koyukuk Capital projects and improvements 25,000 21 Kwethluk Capital projects and improvements 25,219 22 Lower Kalskag Capital projects and improvements 40,010 23 Marshall Capital projects and improvements 25,001 24 Mountain Village Capital projects and improvements 25,000 25 Napakiak Capital projects and improvements 25,000 26 Nightmute Capital projects and improvements 25,090 27 Nondalton Capital projects and improvements 33,353 28 North Pole Capital projects and improvements 39,428 29 North Slope Borough Capital projects and improvements 71,683 30 Nuiqsut Capital projects and improvements 31,310 31 Nunam Iqua Capital projects and improvements 25,000

01 Nunapitchuk Capital projects and improvements 26,322 02 Old Harbor Capital projects and improvements 25,004 03 Ouzinkie Capital projects and improvements 25,000 04 Pilot Station Capital projects and improvements 26,512 05 Platinum Capital projects and improvements 26,659 06 Port Heiden Capital projects and improvements 25,000 07 Port Lions Capital projects and improvements 25,005 08 Quinhagak Capital projects and improvements 25,000 09 Russian Mission Capital projects and improvements 35,014 10 Shageluk Capital projects and improvements 25,264 11 Shaktoolik Capital projects and improvements 25,156 12 Shishmaref Capital projects and improvements 51,388 13 Teller Capital projects and improvements 25,000 14 Togiak Capital projects and improvements 25,000 15 Upper Kalskag Capital projects and improvements 52,412 16 Wainwright Capital projects and improvements 25,000 17 White Mountain Capital projects and improvements 25,067 18 (c) The appropriations made by (a) and (b) of this section are made contingent on the 19 grantee complying before July 1, 2002, with the requirements, other than deadlines, set out in 20 AS 37.06. 21 * Sec. 15. HOUSE DISTRICT 1. The sum of $1,000,000 is appropriated from the general 22 fund to the Department of Community and Economic Development for payment as a grant 23 under AS 37.05.315 to the Ketchikan Gateway Borough as a match for federal funds of 24 $12,000,000 and with a local match of $1,500,000 for Ketchikan shipyard development. 25 * Sec. 16. ALYESKA SETTLEMENT FUND. (a) The unappropriated and unobligated 26 balance of the income accrued during the fiscal year ending June 30, 2001, on money in the 27 Alyeska settlement fund is appropriated to the Department of Transportation and Public 28 Facilities for construction of a road from Cordova to Shepard Point, the construction of oil 29 spill response equipment storage facilities, and the acquisition of oil spill response equipment 30 for prepositioning at Shepard Point. 31 (b) In this section, "Alyeska settlement fund" means the trust fund established in the

01 state treasury for the purpose of receiving, holding, and disbursing the settlement proceeds 02 received by the state under the Agreement and Consent Decree in In Re: The Exxon Valdez, 03 United States District Court, District of Alaska, Case No. A92-175 Civil, decree entered 04 November 25, 1992. 05 * Sec. 17. EXXON VALDEZ OIL SPILL RESTORATION FUND. (a) The legislature 06 finds that 07 (1) as a result of the judgment entered by the United States District Court in 08 the criminal case United States of America v. Exxon Shipping Company and Exxon 09 Corporation, No. A90-015 CR, the state received $50,000,000 in restitution "to be used by the 10 State of Alaska . . . exclusively for restoration projects, within the State of Alaska, relating to 11 the 'Exxon Valdez' oil spill"; 12 (2) the money received by the state in restitution is held in the Exxon Valdez 13 oil spill restoration fund, established by the Department of Revenue to implement the 14 judgment; and 15 (3) the appropriations in (b) - (d) of this section are made in order to achieve 16 the purposes in the court's restitution order. 17 (b) The sum of $646,000 is appropriated from the income accrued during the fiscal 18 year ending June 30, 2001, on the Exxon Valdez oil spill restoration fund described in (a) of 19 this section to the Department of Military and Veterans' Affairs for payment as a grant under 20 AS 37.05.316 to the Marine Exchange of Alaska, Inc., for development of a web-based 21 emergency prevention and response system that includes a vessel location system, an e-mail- 22 based emergency communications system, and a marine emergency logistics and services 23 database for each port in Alaska. 24 (c) The sum of $20,000 is appropriated from the income accrued during the fiscal 25 year ending June 30, 2001, on the Exxon Valdez oil spill restoration fund described in (a) of 26 this section to the Department of Military and Veterans' Affairs for payment as a grant under 27 AS 37.05.316 to Cordova District Fishermen United for establishment of a weather station on 28 Grass Island in the Copper River Delta. 29 (d) The unappropriated and unobligated balance of the income accrued during the 30 fiscal year ending June 30, 2001, on the Exxon Valdez oil spill restoration fund described in 31 (a) of this section that remains after the appropriations made in (b) and (c) of this section is

01 appropriated to the Department of Transportation and Public Facilities for construction of a 02 road from Cordova to Shepard Point, the construction of oil spill response equipment storage 03 facilities, and the acquisition of oil spill response equipment for prepositioning at Shepard 04 Point. 05 * Sec. 18. STUDIES FOR NORTH DENALI ACCESS ROUTE. (a) The sum of $330,000 06 is appropriated from the general fund as state matching money for federal funds authorized in 07 P.L. 105 - 178, sec. 1602, item 1494, to the Department of Transportation and Public 08 Facilities for an environmental analysis and other necessary studies for the northern access 09 into Denali National Park and Preserve. 10 (b) The sum of $1,320,000 is appropriated from federal receipts to the Department of 11 Transportation and Public Facilities for planning, reconnaissance, and environmental analysis 12 for a proposed northern access into Denali National Park and Preserve. 13 * Sec. 19. DEPARTMENT OF ENVIRONMENTAL CONSERVATION. (a) Section 100, 14 ch. 2, FSSLA 1999, page 46, lines 11 - 12, is amended to read: 15 ALLOCATIONS 16 Homer East Trunk/ 441,000 17 Beluga Lift Station 18 Upgrade and East End 19 Road Sewer Main Extension 20 and Infiltration and Inflow 21 Study (ED 7 - 9) 22 (b) Section 82, ch. 100, SLA 1997, page 50, lines 37 - 38, as amended by sec. 49(c), 23 ch. 2, FSSLA 1999, is amended to read: 24 ALLOCATIONS 25 Unalaska - Wastewater 1,400,000 26 Treatment Plant Upgrade 27 and Water Compliance 28 Projects, and Landfill, 29 Phase I Development, and 30 Water and Sewer 31 Improvements (ED40)

01 * Sec. 20. OFFICE OF THE GOVERNOR. (a) The sum of $16,650,000 in federal receipts 02 that the state receives for the implementation of the Pacific Salmon Treaty is appropriated as 03 follows: 04 (1) the sum of $9,990,000 is appropriated to the Office of the Governor for 05 projects identified by the stakeholders' panel to provide economic adjustment assistance to 06 salmon fishermen east of Cape Suckling; 07 (2) the sum of $6,660,000 is appropriated to the Office of the Governor for 08 salmon habitat restoration, salmon stock enhancement, and salmon research, including the 09 construction of salmon research and related facilities, east of Cape Suckling. 10 (b) The appropriations made by this section do not include $1,000,000 authorized by 11 the United States Congress for the Metlakatla Hatchery or $350,000 authorized by the 12 Congress for the Crystal Lake Hatchery, to the City of Petersburg. 13 * Sec. 21. MUNICIPALITY OF ANCHORAGE. (a) Subject to (b) of this section, the sum 14 of $4,000,000 is appropriated from the general fund to the Department of Community and 15 Economic Development for payment as a grant under AS 37.05.315 to the Municipality of 16 Anchorage for the maintenance of and safety upgrades to highways, roads, and streets. In this 17 subsection, "maintenance" has the meaning given in AS 19.45.001(10). 18 (b) The appropriation made by (a) of this section is conditioned on the Municipality 19 of Anchorage matching the appropriation with $1,000,000. 20 * Sec. 22. JUDICIAL COUNCIL. The unexpended and unobligated balance on June 30, 21 2001, not to exceed $39,200, of the appropriation made in sec. 1, ch. 133, SLA 2000, page 32, 22 line 6 (Judicial Council - $769,300) is reappropriated to the Judicial Council for a 23 comprehensive criminal justice process study for the fiscal year ending June 30, 2002. 24 * Sec. 23. LAPSE PROVISIONS. (a) The appropriations made by secs. 3, 4, 6, and 11 of 25 this Act are for capitalization of funds and do not lapse. 26 (b) The appropriations made by secs. 7 - 9, 12, 16 - 18, and 20 of this Act are for 27 capital projects and lapse under AS 37.25.020. 28 * Sec. 24. RETROACTIVITY. The appropriation made by sec. 1, page 19, lines 22 - 25, of 29 this Act is retroactive to May 15, 2001. 30 * Sec. 25. The appropriation made by sec. 1, page 19, lines 22 - 25, and sec. 24 of this Act 31 take effect immediately under AS 01.10.070(c).

01 * Sec. 26. Section 12 of this Act takes effect June 30, 2001. 02 * Sec. 27. Except as provided in secs. 25 and 26 of this Act, this Act takes effect July 1, 03 2001.