00 SENATE BILL NO. 106 01 "An Act authorizing power transmission interties between Anchorage and the 02 Kenai Peninsula, between Healy and Fairbanks, and between the Swan Lake and 03 Tyee Lake hydroelectric projects, and approving the design and construction costs 04 of the interties; and providing for an effective date." 05 BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF ALASKA: 06 * Section 1. In accordance with AS 44.83.185(c) and contingent upon sec. 4 of this Act, 07 the Alaska Energy Authority is authorized to design and construct a 138 kilovolt power 08 transmission intertie between Anchorage and the Kenai Peninsula at a cost of $84,100,000. 09 The transmission line shall be capable of being upgraded to 230 kilovolts. 10 * Sec. 2. In accordance with AS 44.83.185(c) and contingent upon sec. 4 of this Act, the 11 Alaska Energy Authority is authorized to design and construct a 138 kilovolt power 12 transmission intertie between Healy and Fairbanks at a cost of $77,600,000. The transmission 13 line shall be capable of being upgraded to 230 kilovolts. 14 * Sec. 3. (a) In accordance with AS 44.83.185(c), the Alaska Energy Authority is 01 authorized to design and construct a 138 kilovolt power transmission intertie between the 02 Swan Lake and the Tyee Lake hydroelectric projects at a cost of $55,600,000. 03 (b) It is the intent of the legislature that the Alaska Energy Authority finance the 04 design and construction of the intertie authorized by (a) of this section through the sale of 05 revenue bonds to be repaid from revenue from the sale of power from hydroelectric projects 06 included in the Four Dam Pool. 07 * Sec. 4. The authorizations made by secs. 1 and 2 of this Act are contingent upon written 08 agreements between the Alaska Energy Authority and participating electric utilities providing 09 that the participating utilities agree to pay 10 (1) 50 percent of the design and construction costs for the power transmission 11 interties authorized by this Act; and 12 (2) the operation and maintenance costs of the power transmission interties 13 authorized by this Act. 14 * Sec. 5. This Act takes effect immediately under AS 01.10.070(c).